§ 18-42 — Line extension
Code of the Town of Gilbert, Arizona (Supp. No. 103: codified through Ordinance No. 2986, enacted June 9, 2026) · Gilbert Town Code § 18-42
Corpus is an independent public-information project, not the official City of Gilbert website. Stable reference: corpuslaw.us/code/44010edc-87d7-4e52-9eac-b8ee9937c563
Sec. 18-42. - Line extension.
(a) Residential service. After completion of construction in an area pursuant to a construction schedule, a licensee shall make cable services available to dwelling units within the town and shall extend its cable system as follows: (1) Each unit in a multiple dwelling unit (MDU) shall be counted as a dwelling unit in determining residential density where a mutually acceptable agreement granting licensee reasonable access to the MDU has been executed by the owner of the property and delivered to the licensee. Licensee shall not be required to make service available to residents of a MDU where the owner of the property has not granted licensee such reasonable access to the property. (2) When requested by a resident in the town, licensee shall, at licensee's sole expense, extend the cable system to any single family residence or dwelling within the town, provided that the residence or dwelling is located within 225 feet of the nearest technically feasible point of connection on the cable system or such extension involves density of 25 existing homes per mile as measured in linear trench or aerial strand footage from the nearest existing technically feasible point of connection on the cable system. Such extension(s) shall include cutting in one or more taps and extending cable as necessary. (3) When a resident in the town requests an extension of service to an area that does not meet the minimum density of 25 existing homes per mile as measured in linear trench or aerial strand footage from the nearest existing technically feasible point of connection on the cable system, licensee shall be required to comply with such request only if the resident agrees to pay to the licensee an amount equal to all actual incremental costs incurred beyond those for an extension otherwise involving a density of 25 existing homes per mile. The incremental costs to be paid shall be licensee's costs (reasonable labor and materials) of extending the cable system consistently with licensee's overall system design to the residence from the nearest technically feasible point of connection on the cable system. The costs shall include splicing in one or more taps and extending cable. (4) When a developer of a residential subdivision to be built in the town requests an extension to serve the subdivision, licensee shall comply with the request in accordance with this subsection. Licensee shall extend the cable system to serve the subdivision at licensee's expense if the nearest boundary of the subdivision is no greater than 225 feet from the nearest technically feasible point of connection on the cable system and if the subdivision meets the line extension requirements in (2) measured from the boundary point. If the subdivision does not meet the requirements of (2), licensee shall extend the cable system within the subdivision if the developer agrees to pay licensee's actual incremental costs (reasonable labor and materials) incurred beyond those for an extension otherwise involving a density of 25 existing homes per mile determined as in (2). If the nearest technically feasible point of connection is greater than 225 feet from the subdivision and the developer agrees to pay licensee's incremental costs of extending the cable system from the nearest technically feasible point of connection on the cable system to the nearest street access to the subdivision and within the subdivision, licensee shall then extend the cable system to and within the subdivision. Licensee's incremental costs in extending to and within the subdivision are the costs (reasonable labor and materials) incurred beyond those for an extension otherwise involving a density of 25 existing homes per mile determined as in (2). (5) A license may provide for different line extension requirements from that required in subsections (2), (3) and (4). (6) To prevent unnecessary disruption and damage to streets, rights-of-way, and other property, the installation of underground cable shall be accomplished in new subdivisions that meet the requirements of (2) at the same time, and in the same trench as other communications, electric and other permanent services to structures, unless to do so would be economically infeasible. Except as federal law may grant them other rights, developers of new residential buildings or mobile homes within a new or undeveloped subdivision, new residential units within new multiple occupancy residential developments, and new commercial and industrial buildings and structures shall treat cable television facilities as they treat other communication facilities, utilities and other underground facilities, in regards to availability and cost of trenching for undergroundings. (7) Absent a showing by licensee to the manager of circumstances beyond licensee's reasonable control, an extension of service pursuant to subsections (2), (3), (4), or (5) of this section shall be accomplished within 120 days of the developer's or resident's request. (8) Licensee shall not be required to install the cable system or conduit in the joint trench of a new subdivision or to provide cable service to residents of the subdivision when the developer or homeowner's association of the subdivision has entered into an agreement in which another party has agreed to provide cable television or other comparable video services to all residents of the subdivision and in which the subscribers fees for such services are paid to the provider from collection of homeowners association fees. However, upon termination of such agreement, the line extension required by this section shall apply. (9) When a drop or linear trench or aerial strand footage enters or crosses a designated future freeway corridor shown on the map maintained by the town engineer under subsection 10-5(d)(15) of this Code, the routs from the nearest existing technically feasible point of connection in the cable system shall be measured in permitted crossings established by the town engineer under that subsection. This subsection also applies to subsection 18-42(b). (b) Commercial service. After completion of construction in an area pursuant to a construction schedule, a licensee shall make cable services available to commercial establishments as follows, except licensee shall not be required to make service available to commercial establishments where the owner of the property has not granted licensee reasonable access to the property: (1) When requested by the owner of a commercial establishment, provided that no plant extension and nothing more than a standard drop is required to make cable services available or provided that the building is located within 225 feet of the nearest technically feasible point of connection on the cable system. (2) When the owner of a commercial or industrial establishment within the town requests an extension of service that does not meet a minimum 225 foot distance requirement or 100 hook ups per cable plant mile, licensee shall be required to comply with such request only if such owner pays to licensee an amount equal to the reasonable actual labor and material costs incurred by licensee over and above the cost of a standard drop in making cable services available. Absent a showing by licensee to the manager of unusual circumstances, including without limitation street crossings, an extension of service shall be accomplished within 120 days of owner's execution of any necessary easement documents and capital contribution agreements. (3) A license may provide for different line extension requirements from that required in subsections (1) and (2). (c) Service drops. (1) Licensee shall make service available to any single family residence or any commercial establishment within the town at applicable standard connection charge if the connection requires a standard drop. (2) If making service available requires more than a standard drop, licensee shall not be required to make such service available unless the person requesting service pays to licensee (i) the standard connection charge and (ii) an amount equal to the reasonable actual labor and material costs incurred by licensee for the additional facilities and work. (3) Licensee may offer bulk billing service, but shall not require a bulk billing agreement as a condition of providing service. (4) Absent a showing by licensee to the manager of unusual circumstances, including without limitation street crossings, (i) any standard drop to a single family residence or dwelling shall be accomplished within TEN business days after an order has been placed, and (ii) any drop that is not a standard drop shall be accomplished within a reasonable time under the circumstances. Line extensions shall be done as provided in subsection 18-42(a). (5) Absent a showing by licensee to the manager of unusual circumstances, including without limitation street crossings, (i) any standard drop to a commercial establishment shall be accomplished within ten days after the owner of such commercial establishment executes any necessary easement documents and capital contribution agreements, and (ii) any commercial drop that is not a standard drop shall be accomplished within a reasonable time under the circumstances. (d) If a licensee elects to extend cable service to a customer in a licensed area which does not meet the density requirements of this section, the licensee shall not refuse to extend service to any other customer in the same area solely on the grounds that service to the first customer was not in the area required under the density requirements set forth in this section. (e) The line extension requirements set forth in this section shall not apply to any area covered by a construction phase described in the construction schedule until the construction phase for that area has been completed. (f) Discrimination prohibited. No person, firm or corporation in the existing cable service area of the licensee shall be arbitrarily refused cable services; provided, however, that the licensee shall not be required to provide cable services to any subscriber who does not pay the applicable line extension connection fee and/or cable service charge(s). (g) Annexed territory. Newly annexed territory shall be subject to the terms of this chapter and this section.
(Ord. No. 1137, § I, 12-15-98; Ord. No. 2452, § I, 10-3-13)
Ask a question about Gilbert law
Corpus searches the Gilbert sections it holds and shows the ones that match, with their citations. Free, no sign-in.