§ 135.08 — Right-of-way patching and restoration

Saint Paul Legislative Code (Supp. No. 133, Update 1: codified through Ordinance No. 26-26, adopted May 13, 2026) · Saint Paul Legislative Code § 135.08

Corpus is an independent public-information project, not the official City of St. Paul website. Stable reference: corpuslaw.us/code/44b1dc98-bcb7-49ba-baec-81da2e3e3603

Sec. 135.08. - Right-of-way patching and restoration.

The work to be done under the permit, and the patching and restoration of the right-of-way as required herein, must be completed within the dates specified in the permit, increased by as many days as work could not be done because of circumstances constituting force majeure or when work was prohibited as unseasonal or unreasonable under this chapter. In addition to patching its own work, the permittee must restore the general area of the work, and the surrounding areas, including the paving and its foundations, to the same condition that existed before the commencement of the work. In its application for an excavation permit, the permittee may choose either to have the city restore the right-of-way or to restore the right-of-way itself. (1) City restoration. If the city restores the right-of-way, permittee shall pay the costs thereof within thirty (30) days of billing. If, following such restoration, the pavement settles due to permittee's improper backfilling, the permittee shall pay to the city, within thirty (30) days of billing, all costs associated with correcting the defective work. (2) Permittee restoration. If the permittee restores the right-of-way itself, it shall at the time of application of an excavation permit post a performance bond. The permittee shall perform excavation, backfilling, patching and restoration according to the standards and with the materials specified by the director. The director shall have the authority to prescribe the manner and extent of the restoration, and may do so in written procedures of general application or on a case-by-case basis. The director in exercising this authority shall be guided by Minnesota Rules 7819.1100. Methods of restoration may include, but are not limited to, patching, replacement of the right-of-way base, and milling and overlay of the entire area of the right-of-way affected by the work. The permittee shall correct defects in patching, or restoration performed by permittee or its agents. Permittee, upon notification from the department, shall correct all restoration work to the extent necessary, using the method required by the department. Said work shall be completed within five (5) working days of the receipt of the notice from the department, not including days during which work cannot be done because of circumstances constituting force majeure or days when work is prohibited as unseasonal or unreasonable under Chapters 116 and 135. If the permittee fails to restore the right-of-way in the manner and to the condition required by the department, or fails to satisfactorily and timely complete all restorations required by the department, the department at its option may do such work. In that event the permittee shall pay to the city, within thirty (30) days of billing, the cost of restoring the right-of-way. If the permittee elects not to restore the public right-of-way, the director shall impose a degradation fee. However, the right-of-way user shall remain responsible for patching, and the degradation fee shall not include the cost to accomplish these responsibilities.

(C.F. No. 96-1371, § 1, 12-11-96; C.F. No. 00-268, § 2, 4-19-00)