Charleston, S.C., City Code § 28-1 Specifications for design and construction of roads and drainage systems.
Sec. 28-1. - Specifications for design and construction of roads and drainage systems.
(a) No street, sidewalk or drainage system shall be accepted by the city as dedicated unless such shall be designed, constructed and/or rehabilitated in accordance with the city's standard specifications for design and construction of roads and drainage systems and the Standard Specifications for Highway Construction for the South Carolina Department of Transportation. Public acceptance of a dedication of any street, sidewalk, easement, or other ground shown upon a land development plat or a subdivision plat shall be by action of city council. All liability and maintenance for the dedicated property shall remain with the developer in accordance with the maintenance agreement until the deed transferring the property is accepted by city council and the two-year warranty period has expired.
(b) In the event of a conflict between the standards of the city and the state highway department, the city standard shall prevail.
(c) As-built certification for all dedicated public improvements, as set forth in the As-built Requirements for Final Subdivision Approval, which policy is maintained and a copy of such kept by the City of Charleston Engineering Division, shall be required prior to acceptance of the improvements by the city as dedicated.
(d) The developer shall execute a maintenance agreement guaranteeing the dedicated improvements against defect in workmanship and materials for two (2) years after construction and acceptance of such improvements by city council as documented by the minutes of city council. A letter of credit or a maintenance bond shall be provided to the city in an amount equivalent to ten (10) percent of the cost of the improvements dedicated to the city.
(Ord. No. 2006-457, § 1, 9-26-06; Ord. No. 2010-249, § 1, 11-10-10)
