20.16.060: PRELIMINARY APPROVAL STANDARDS:
A. Timing of Approval: At the conclusion of any review cycle where no further corrections or additional information is required, each city department shall indicate that the application is eligible for approval. If all the requirements of Chapter 20.14 have been satisfied, the application shall be approved upon finding it complies with all the applicable standards found in this section, Chapter 20.26, and applicable provisions of Utah Code Chapter 10-9a. For an application that does not comply with the applicable standards in this title, and the subdivider has not responded within 90 days from the date the subdivider was provided with an itemized, written notice of any deficiency or noncompliance with the standards of this title shall be sent by the city and the application may be denied by the planning director.
B. Approval Standards:
1. All preliminary subdivisions shall comply with the following standards:
a. The preliminary plat map and associated documents include all information and is properly formatted as required by this title;
b. The subdivision shall comply with all subdivision design standards or with approved modifications to the subdivision design standards in Chapter 20.26 of this title;
c. Water supply and sewage disposal including all offsite utility improvements, required easements and infrastructure upgrades shall be satisfactory to the public utilities department director;
d. The location and design of all water supply and sanitary sewer facilities are appropriately sized, connect to adequately sized infrastructure and found to be compliant with the adopted standards;
e. The location and design of drainage elements to handle stormwater, ensure compliance with floodplain regulations, prevent erosion, and minimize formation of dust has been found to be compliant with adopted city standards and if applicable, Salt Lake County Flood Control and the Utah Department of Environmental Quality;
f. The subdivision provides access and infrastructure necessary for firefighting equipment as required by the applicable fire code adopted by the city;
g. The subdivision provides adequate easements and locations for all necessary utilities that are not provided by the city;
h. All required dedications of land for streets, midblock walkways, alleys, parks, trails, and open space are provided for on the preliminary plat as indicated in the adopted general plan of the city or as agreed to as part of any land use approval or development agreement. Any exactions that are not agreed to as part of a land use approval or development agreement shall be roughly proportionate and directly related to the impact of the proposed subdivision;
i. The subdivision includes recommendations in the subdivider's traffic impact study when the transportation director indicates the recommendations are required to mitigate adverse impacts; and
j. The proposed subdivision will not create any injury or harm to any other property or persons.
2. Condominiums: The following additional standards shall apply to all condominium conversions preliminary subdivisions:
a. The building official shall identify any improvements, repairs or replacements which must be made to bring the structure into compliance with applicable building codes prior to recording the final plat. The building official may require any existing code violations identified to be corrected prior to final approval; and
b. Any existing nonconforming use or noncomplying structure that creates an immediate health or safety hazard to the public or future owners within the condominium has been brought into compliance with current standards or has been identified as a condition of approval to be addressed prior to the planning director signing the final plat.
C. Effect of Approval: The effect of preliminary subdivision approval shall authorize the subdivider to prepare the final recording documents as required by this title.
D. Approval Expiration: Preliminary approval shall expire eighteen (18) months from the date of preliminary approval unless a final plat has been submitted. If a final plat is not required, the required recording documents shall be submitted within eighteen (18) months from the date of preliminary approval. If the preliminary approval indicated that the subdivision will be divided into phases, the final plat for the first phase shall be submitted within eighteen (18) months. Future phases shall be subject to the phasing plan that was approved as part of the preliminary plat. (Ord. 73-23, 2023)