33.440.350 Approval Criteria
The approval criteria for a greenway review have been divided by location or situation. The divisions are not exclusive; a proposal must comply with all of the approval criteria that apply to the site. A greenway review application will be approved if the review body finds that the applicant has shown that all of the approval criteria are met. A. For all greenway reviews. The Willamette Greenway design guidelines must be met for all greenway reviews. B. River frontage sites in the River Industrial zone. In the River Industrial zone, uses that are not river-dependent or river-related may locate on a site that fronts the river when the site is found to be unsuitable for river-dependent or river-related uses. Considerations include such constraints as the size or dimensions of the site, distance or isolation from other river- dependent or river-related uses, and inadequate river access for river-dependent uses. C. Development within the River Natural zone. The applicant must show that the proposed development, excavation, or fill within the River Natural zone will not have significant detrimental environmental impacts on the wildlife, wildlife habitat, and scenic qualities of the lands zoned River Natural. The criteria applies to the construction and long-range impacts of the proposal, and to any proposed mitigation measures. Excavations and fills are prohibited except in conjunction with approved development or for the purpose of wildlife habitat enhancement, riverbank enhancement, or mitigating significant riverbank erosion. D. Development on land within 50 feet of the River Natural zone. The applicant must show that the proposed development or fill on land within 50 feet of the River Natural zone will not have a significant detrimental environmental impact on the land in the River Natural zone. E. Development within the greenway setback. The applicant must show that the proposed development or fill within the greenway setback will not have a significant detrimental environmental impact on Rank I and II wildlife habitat areas on the riverbank. Habitat rankings are found in the Lower Willamette River Wildlife Habitat Inventory. F. Development riverward of the greenway setback. The applicant must show that the proposed development or fill riverward of the greenway setback will comply with all of the following criteria: 1. The proposal will not result in the significant loss of biological productivity in the river; 2. The riverbank will be protected from wave and wake damage; 3. The proposal will not: a. Restrict boat access to adjacent properties; b. Interfere with the commercial navigational use of the river, including transiting, turning, passing, and berthing movements; c. Interfere with fishing use of the river; d. Significantly add to recreational boating congestion; and 4. The request will not significantly interfere with beaches that are open to the public. G. Development within the River Water Quality overlay zone setback. If the proposal includes development, exterior alterations, excavations, or fills in the River Water Quality overlay zone setback the approval criteria below must be met. River-dependent development, exterior alterations, excavations, and fills in the River Water Quality zone are exempt from the approval criteria of this subsection. 1. Streets, right-of-way dedications, driveways, walkways, outfalls, and utilities. For streets, right-of-way dedications, driveways, walkways, outfalls, and utilities, the applicant's impact evaluation must demonstrate that all of the following are met: a. Proposed development or right-of-way (ROW) locations, designs, and construction methods have the least significant detrimental impact to the functional values of the water quality resource area than other practicable and significantly different alternatives including alternatives outside the River Water Quality overlay zone setback; b. The location, design, and construction method of any outfall or utility proposed within a River Water Quality overlay zone has the least significant detrimental impact to the functional values of the water quality resource area than other practicable alternatives including alternatives outside the River Water Quality overlay zone setback; c. Water bodies are crossed only when there are no practicable alternatives with fewer significant detrimental impacts. Where a water body is crossed, the location, design, and construction method of that crossing has the least significant detrimental impact to the functioning of the water body and considering practicable alternatives; d. There will be no significant detrimental impact on functional values in areas designated to be left undisturbed within the River Water Quality overlay zone setback; e. All significant detrimental impacts on functional values that cannot be avoided will be mitigated by meeting the requirements of Subsection 33.440.350.H; and f. The mitigation plan ensures that the proposed development will not contribute to a cumulative loss of functional values over time. 2. Public safety facilities. For public safety facilities, the applicant’s impact evaluation must demonstrate that all of the following are met: a. Proposed development locations, designs, and construction methods have the least significant detrimental impact to functional values of the water quality resource area than other practicable and significantly different alternatives including alternatives outside the River Water Quality overlay zone setback; b. There will be no significant detrimental impact on functional values in areas designated to be left undisturbed within the River Water Quality overlay zone setback; c. All significant detrimental impacts on functional values will be offset through a mitigation plan; d. The mitigation plan meets the requirements of Subsection 33.440.350.H; and e. The mitigation plan ensures that the proposed development will not contribute to a cumulative loss of functional values over time. 3. Resource enhancement projects. In the River Water Quality overlay zone setback, resource enhancement projects will be approved if the applicant's impact evaluation demonstrates that all of the following are met: a. There will be no significant detrimental impact on functional values; b. There will be a significant improvement of at least one functional value; and c. The project is generally consistent with the recommendations of any applicable City-adopted watershed restoration plans. 4. Public recreational facilities. Public recreational trails, rest points, view points, and interpretative facilities will be approved if the applicant’s impact evaluation demonstrates that all of the following are met: a. Proposed development locations, designs, and construction methods have the least significant detrimental impact to the functional values of the water quality resource area than other practicable and significantly different alternatives including alternatives outside the River Water Quality overlay zone setback; b. Water bodies are crossed only when there are no practicable alternatives with fewer significant detrimental impacts. Where a water body is crossed, the location, design, and construction method of that crossing has the least significant detrimental impact to the natural functioning of the water body, considering practicable alternatives; c. The public benefits of the proposal outweigh all significant detrimental impacts; d. Areas disturbed during construction that do not contain permanent development will be restored with native vegetation appropriate to the site conditions and found on the Portland Plant List; e. There will be no significant detrimental impact on functional values in areas designated to be left undisturbed within the River Water Quality overlay zone setback; f. All significant detrimental impacts on functional values that cannot be avoided will be compensated for through a mitigation plan meeting the requirements of Subsection 33.440.350.H; and g. The mitigation plan ensures that the proposed development will not contribute to a cumulative loss of functional values over time. 5. Other development, excavations, and fills in the River Water Quality overlay zone setback. Where development, exterior alterations, excavation, or fill is proposed in the River Water Quality overlay zone setback, the applicant's impact evaluation must demonstrate that all of the following are met: a. Proposed development minimizes the loss of functional values, consistent with allowing those uses generally permitted or allowed in the greenway overlay zone without a land use review; b. Proposed development locations, designs, and construction methods are less detrimental to the functional values of the water quality resource area than other practicable and significantly different alternatives including alternatives outside the River Water Quality overlay zone setback; c. There will be no significant detrimental impact on functional values in areas designated to be left undisturbed; d. Areas disturbed during construction that do not contain permanent development will be restored with native vegetation appropriate to the site conditions and found in the Portland Plant List; e. All significant detrimental impacts on functional values will be offset through mitigation; f. The mitigation plan meets the requirements of Subsection 33.440.350.H; g. The mitigation plan ensures that the proposed development will not contribute to a cumulative loss of functional values over time; and h. Where significant restoration or enhancement opportunities have been identified in City-adopted watershed restoration plans or where previous restoration projects have taken place, the proposed development will not preclude those restoration or enhancement opportunities or damage existing restoration projects. H. Mitigation or remediation plans. Where a mitigation or remediation plan is required by the approval criteria of this chapter, the applicant's mitigation or remediation plan must demonstrate that the following are met: 1. Except when the purpose of the mitigation could be better provided elsewhere, mitigation will occur: a. On site and as close as practicable to the area of disturbance; b. Within the same watershed as the proposed use or development; and c. Within the Portland city limits. 2. The applicant owns the mitigation or remediation site; possesses a legal instrument that is approved by the City (such as an easement or deed restriction) sufficient to carry out and ensure the success of the mitigation or remediation plan; or can demonstrate legal authority to acquire property through eminent domain; 3. The mitigation or remediation plan contains a construction timetable and a minimum 1 year monitoring and maintenance plan that demonstrates compliance with Subsection 33.248.090.E and includes the following elements: a. Identification of the responsible party or parties that will carry out the mitigation or remediation plan; b. Identification of clear and objective performance benchmarks that will be used to judge the mitigation or remediation plan success; and c. A contingency plan that indicates the actions to be taken in the event that performance benchmarks are not met. (Amended by: Ord. No. 171219, effective 7/1/97; Ord. No. 175837, effective 9/7/01; Ord. No. 176443, effective 5/30/02; Ord. No. 176784, effective 9/6/02; Ord. No. 177082, effective 1/20/03; Ord. No. 177368, effective 5/17/03; Ord. No. 178509, effective 7/16/04; Ord. No. 179092, effective 4/1/05; Ord. No. 182429, effective 1/16/09; Ord. No. 183534, effective 7/1/10; Ord. No. 186053, effective 1/1/15; Ord. No. 189000, effective 7/9/18; Ord. No. 189784, effective 3/1/20; Ord. No. 190023, effective 8/10/20; Ord. No. 190241, effective 3/1/21; Ord. No. 191779, effective 10/1/24.) The City of Portland is committed to providing meaningful access. To request translation, interpretation, modifications, accommodations, or other auxiliary aids or services, contact 311, Relay: 711. 503-823-4000: Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas www.portland.gov/bps/accommodation

Willamette


Willamette


Willamette


Willamette


River Industrial

Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.