Physical control.
G.S. 102-2
in effect§ 102-2. Physical control.
Any triangulation or traverse station or monument established as described in G.S. 102-1 may be used in establishing a connection between any survey and the above-mentioned system of rectangular coordinates. (1939, c. 163, s. 2.)
Source: North Carolina General Assembly (ncleg.gov)URL: https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_102/GS_102-2.htmlFetched: 10/19/2026
