Sec. 30-47. - Construction provisions.
(a) Initial Geographical Coverage. The Wireline Telecommunications System shall be installed initially in accordance with the general route maps included in the Franchise Application. Prior to construction in areas not specified in the Franchise Application, Grantee shall notify the Director of the planned construction and obtain necessary permits from the City. Upon receipt of all necessary permits, Grantee shall notify the Director that it has obtained all necessary permits, and shall request that the Director approve an amendment to the route maps included in the Franchise Application. The Director shall determine whether there is sufficient capacity in the Rights-of-Way to accommodate Grantee's proposed expansion. The Director shall have 30 days from the receipt of such request to approve or disapprove the proposed amendment to the route maps. Such approval or disapproval shall be determined in a reasonable manner. (b) System Construction Schedule. (1) Initial Service and Expenditures. The Grantee shall begin construction within six months after acceptance of its Franchise. The Grantee shall complete installation of the Wireline Telecommunications System in accordance with plans submitted by Grantee at the time of Application and approved by Grantor pursuant to Section 30-55(b). (2) Detailed Plans and Schedules. Prior to construction, the Grantee shall provide a detailed construction plan including a progress schedule, area construction maps, test plan, and projected dates for offering service. In addition, the Grantee shall provide the Director with evidence whether schedules are being met and the reasons for any delay. (3) Failure to Begin or Complete Construction. Grantee's failure to begin System construction within six months after its acceptance of the Franchise and/or Grantee's failure to complete construction as agreed will be grounds for termination of the Franchise, at the option of the Grantor. (c) Penalties for Delay in Construction. The Grantor may, at its sole discretion, apply penalties in connection with delays in System construction and operation but not limited to: (1) Reduction in the duration of the Franchise on a month-for-month basis for each month of delay exceeding three months beyond the schedules set forth herein; (2) Termination of the Franchise for delays exceeding 18 months beyond the schedules set forth herein; and/or (3) Other remedies or penalties provided by law. (d) Undergrounding of Cable. (1) Wireline Telecommunications Systems shall be installed underground at Grantee's cost where existing utilities are already underground. The utility owning the underground facilities shall make a reasonable determination as to whether space is available to accommodate the Wireline Telecommunications System cables or Equipment and Plant. A negative determination shall not relieve the Grantee of the responsibility to underground its Telecommunications System in underground utility areas. Previously installed aerial facilities shall be placed underground in concert, and on a cost-sharing basis, with other utilities when such other utilities may convert from aerial to underground construction. (2) No Wireline Telecommunications System shall be installed aerially in the "underground area" as stated in Ordinance No. 13,838 C.S. and Ordinance 4001 M.C.S. (Section 146-359 of the City Code). (3) Whenever technically feasible, underground conduits and ducts shall be installed in the street between the adjacent property line and the curb line. (4) Whenever technically feasible conduits and ducts for Wireline Telecommunications Systems shall be installed parallel with the curb line and cross the Rights-of-Way perpendicular to the Rights-of-Way centerline. (5) Whenever technically feasible, ducts and conduits shall be installed by trenchless excavation or directional boring for Rights-of-Way crossings to avoid motor vehicle or public transportation interruptions. (e) Construction. (1) Industry Practices. Wireline Telecommunications Systems constructed pursuant to Franchises granted hereunder shall be in accordance with generally accepted telecommunication industry practices and the Grantee's Franchise, and relevant LPSC regulations. (2) As Built Drawings. Grantee shall furnish Grantor "as built" drawings not later than 120 days after construction has been completed. Drawings shall show ownership of conduits, ducts, poles and cables used for the Wireline Telecommunications System. Drawings shall be drawn to a scale of one inch equals 100 feet using the standard format adopted by the Finance Department. Grantee shall provide one set of such diskettes and one set of blue or black line "as built" drawings to the Director, and one set of drawings and diskettes to the Director of the Department of Public Works. State plane coordinates shall be shown for benchmarks, curb lines and structures. Drawings shall show horizontal dimensions from the curb line and elevations. (f) Construction Codes. The Grantee shall strictly adhere to all building, safety and zoning codes currently or hereafter in force. The Grantee shall arrange its lines, cables, and other appurtenances so as to cause no unreasonable interference with the use of public property by any person. In the event of such interference, the Grantor may require the removal of the Grantee's lines, cables, and appurtenances from the property in question with costs borne by the Grantee. (g) Erection of Additional Poles. Grantee is prohibited from erecting new poles unless Grantee procures approval for such erection from the appropriate City agency or department in accordance with all applicable rules, regulations and laws, including but not limited to all applicable zoning and land use regulations. If Grantee requires additional poles in an existing aerial utility route, Grantee shall negotiate with the utility company for the installation of the needed poles in accordance with existing statutes and regulations. (h) Restoration of Rights-of-Way. (1) Whenever the Grantee shall disturb the surface or ground of any Rights-of-Way for any purpose mentioned herein, it shall restore the same to the condition in which it existed prior to the disturbance, and when any opening is made by the Grantee in any hard surface pavement in any Rights-of-Way, the Grantee shall promptly refill the opening and restore the pavement. The Grantor may refill and/or repave, in case of neglect of the Grantee, upon failure of Grantee to refill or repave after 10 days notice. The reasonable cost thereof, including the cost in inspection and supervision, shall be paid by the Grantee. All excavations made by the Grantee in the Rights-of-Way shall be properly safeguarded for the prevention of accidents. The work hereby required shall be done in strict compliance with the rules, regulations and ordinances of the Grantor as now or hereafter provided. (2) The surface, base, and landscape treatment of any Right-of-Way disturbed by the Grantee in the construction or maintenance of its Wireline Telecommunications System shall be restored in accordance with existing standards of the Grantor in effect at the time of the work. Should the Grantor determine, within two years from the date of such restoration, that such surface, base, or landscape treatment requires additional restoration work to meet existing standards of the Grantor, the Grantee shall perform such additional restoration work at its expense to the reasonable satisfaction of the Grantor. (i) Reservation of street rights and nonliability of grantor. Nothing in the Franchise shall be construed to prevent the Grantor from constructing sewers and drains, grading, paving, repairing and/or altering any street, alley, public highway, or municipal structure, or laying down, repairing or removing water mains or constructing or establishing any other public work. All such work shall be done, insofar as practicable, in such a manner as not to obstruct, injure or prevent the free use and operations of Grantee's telecommunications system. If any such property of the Grantee shall interfere with the construction or repair of any street or public improvement, whether it be construction, repair or removal of a sewer or water main, the improvement of a right-of-way or any other public improvement, all the Grantee's telecommunications system shall be removed or replaced in such a manner as shall be directed by the Grantor so that the same shall not interfere with such public work of the Grantor, and such removal or replacement shall be at the expense of the Grantee. Grantor shall not be liable to Grantee or third parties for any damage, breakage or repair, or any claims for loss of use, business interruption, claims by users, repair or replacement cost to any third party in connection with the removal of any of Grantee's telecommunication systems. In any event, the Grantor shall not be liable for any damage occurring to the Grantee's system caused by the Grantor, its officers, agents, employees, or independent contractors, in the performance of their duties in connection with public works, nor shall the Grantor be held liable for the interruption of service by actions of the Grantor, its officers, agents, employees, or independent contractors, in the performance of their duties in connection with public works. When reasonably possible, the Grantee shall be consulted prior to any public work affecting its telecommunications system, but the Grantor shall have no liability to the Grantee in the event it does not so consult the Grantee. (j) Trimming of Trees. Tree cutting or trimming on public property shall be performed in accordance with Ordinance No. 365 M.C.S. (Chapter 106 of the City Code). (k) Street Vacation or Abandonment. In the event any Rights-of-Way or portion thereof occupied by the Grantee shall be vacated by the Grantor, or the use thereof discontinued by the Grantee during the term of the Franchise, the Grantee shall remove its facilities therefrom unless specifically permitted to continue the same, and on the removal thereof shall restore, repair or reconstruct the street area where such removal has occurred, and place such street area in such condition as may be required by the Grantor. In the event of the failure, neglect or refusal of the Grantee, after 30 days notice by the Grantor to repair, improve or maintain such street portion, the Grantor may do such work or cause it to be done, and the reasonable cost thereof as determined by the Grantor shall be paid by the Grantee and collection may be made by court action or otherwise. (l) Movement of Facilities. In the event it is necessary temporarily to move or remove any of the Grantee's wires, cables, poles or other facilities placed pursuant to the Franchise, in order lawfully to move a larger object, vehicle, building or other structure over the Rights-of-Way of the Grantor, Grantee upon reasonable notice shall move, at the expense of the person requesting the temporary removal, such of its facilities as may be required to facilitate such movements. (m) Safety. (1) Standard of Care. The Grantee shall, at all times, employ the standard of care attendant to the risks involved and shall install and maintain in use commonly accepted methods and devices for preventing failures and accidents which are likely to cause damage, injury, or nuisance to the public or to employees of the Grantee. (2) National Electrical Safety Code. The Grantee shall use, install, maintain, repair and/or operate its wires, cables, fixtures, and other Equipment and Plant in accordance with the requirements of the National Electrical Safety Code and the requirements of any utility providing pole or conduit space and in such manner that Grantee will not interfere with any installations of the Grantor or any public utility. (3) Maintenance. All of Grantee's lines, equipment, and connections in, over, under, and upon the Rights-of-Way, wherever situated or located, shall at all times be kept and maintained in a safe and suitable condition, and in good order and repair. (4) Louisiana One Call. No Franchise shall be granted hereunder for a Wireline Telecommunications System using underground Equipment and Plant within the Rights-of-Way unless and until the Grantee becomes a member of, participates in, and shares the cost of the Louisiana One Call System, as required in R.S. 40:1749.11 et seq. Written evidence of compliance with this section shall be provided to Grantor before a Franchise is granted. Compliance with this section must be maintained throughout the term of the Franchise. (5) Participation in Geographic Information System. No franchise shall be granted hereunder for a Telecommunication System unless Grantee participates in the City's Geographic Information System administered by the New Orleans City Planning Commission (the "Commission") in an electronic form acceptable to the Commission.
(M.C.S., Ord. No. 17,560, § 1, 6-6-96; M.C.S., Ord. No. 19,150, § 1, 3-31-99; M.C.S., Ord. No. 21480, § 1, 4-1-04)
Ask a question about New Orleans law
Corpus searches the New Orleans sections it holds and shows the ones that match, with their citations. Free, no sign-in.