§ 11 — Provisions to vest properties for use of convenience stores with fuel pumps and/or truck stops for the avoidance of requirements to obtain a conditional use permit and the locational criteria and design specifications to operate an existing facility, construct a new facility, or to expand an existing facility

Code of Ordinances, City of Olive Branch, Mississippi (Supp. No. 14: codified through Ordinance of June 17, 2025) · Olive Branch Code of Ordinances, App. A, art. IX, § 11

Corpus is an independent public-information project, not the official City of Olive Branch website. Stable reference: corpuslaw.us/code/45db0873-380a-4aa1-a3d1-fc9dc6d383da

Sec. 11 - Provisions to vest properties for use of convenience stores with fuel pumps and/or truck stops for the avoidance of requirements to obtain a conditional use permit and the locational criteria and design specifications to operate an existing facility, construct a new facility, or to expand an existing facility.

A. Existing convenience store with fuel pumps and truck stop 1. All existing convenience stores with fuel pumps and truck stops referred to in this Article are defined as those currently in operation having obtained a certificate of occupancy and business license as of January 17, 2025. 2. Existing convenience stores with fuel pumps and truck stops meeting the requirements of Article V, Section 16 Special Regulations for Convenience Stores with Fuel Pumps and Truck Stops shall be considered a conforming use, or otherwise may be considered a legal nonconforming use subject to Article IX., Sections 1-10. 3. Any existing convenience stores with fuel pumps and truck stops shall be required to obtain a conditional use permit and meet locational criteria and design specifications to enlarge or expand, unless the vesting provisions (Sec. 11. B. 1-5) are otherwise met. B. It is recognized that there are convenience stores with fuel pumps and truck stops that are proposed to be newly built or seeking to expand in stages of planning, review, permitting, or construction as of January 17, 2025, which are henceforth referred to as "projects." To vest a project from the requirement to obtain a conditional use permit and to meet locational criteria and design specifications, the following steps are mandated. 1. Project shall be on a lot that has received Preliminary Plat approval by June 30, 2025 and Final Plat approval and lot recordation by September 30, 2025. 2. Project shall have obtained administrative approval of Final Civil Site and Landscape Plans, Architectural Elevations and a Lighting Plan issued by the City's Planning and Engineering Departments by December 31, 2025. 3. Project shall have obtained a Building Permit by March 31, 2026. 4. Upon obtaining a Building Permit and commencing construction, projects shall be completed by passing a Final Building Inspection and obtaining a Certificate of Occupancy by March 31, 2027. 5. Effective January 17, 2025, any Building Permit that has expired for a project due to either failure to commence construction, or failure of construction to sufficiently progress as measured by not having a passed building inspection within a six (6) month period shall be subject to double permitting fees for renewal.

(Ord. of 12-17-24(1))