Kennebec River.
33 C.F.R. § 117.525
in effectEffective The draw of the Carlton Bridge, mile 14.0, between Bath and Woolwich shall operate as follows:
(a) From May 15 through September 30 the draw shall open on signal; except that, from 5 p.m. to 8 a.m., the draw shall open on signal if a two-hour notice is given by calling the number posted at the bridge.
(b) From October 1 through May14 the draw shall open on signal; except that, from 5 p.m. to 8 a.m., the draw shall open on signal after a twenty-four hours notice is given from 8 a.m. to 5 p.m., on Saturday and Sunday, after an eight-hour notice is given by calling the number posted at the bridge.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-33.xmlFetched: 7/26/2026
