For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 60-170 — Monitoring, inspection and sampling

Code of Ordinances of Kansas City, Missouri (Supp. No. 140, Update 1: codified through Ordinance No. 260692, enacted August 13, 2026) · Kansas City Code § 60-170

Corpus is an independent public-information project, not the official City of Kansas City website. Stable reference: corpuslaw.us/code/46a842ce-3f2a-41a1-a2a9-3c2e6edbe602

Sec. 60-170. - Monitoring, inspection and sampling.

(a) The director shall cause periodic inspections to be made of premises to secure compliance with the requirements of this article. (b) The director shall have the right to collect samples from any point in industrial user's processes, and of any chemicals or hazardous waste stored at the industrial user's facility. (c) The director shall have the right to set up on the industrial user's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the industrial user's discharge. (d) The director may require the industrial user to install sampling and monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the industrial user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated periodically to ensure their accuracy.

(Ord. No. 120551, § 1, 6-28-12)

Ask a question about Kansas City law

Corpus searches the Kansas City sections it holds and shows the ones that match, with their citations. Free, no sign-in.