§ 25-183 — Publication of Users in Significant Noncompliance
Peoria, Arizona, City Code (2026 S-10: Local legislation current through Ord. 2026-20, passed 10-6-26) · Peoria, Ariz., City Code § 25-183
Corpus is an independent public-information project, not the official City of Peoria website. Stable reference: corpuslaw.us/code/46d66394-52b6-49c2-a88e-46dcdb9e72a9
Sec. 25-183. Publication of Users in Significant Noncompliance.
The Director shall publish annually, in the largest daily newspaper published in the City, a list of the Users which, during the previous twelve (12) months, were in Significant Noncompliance with applicable Pretreatment Standards and Requirements. The term Significant Noncompliance shall be applicable to all Significant Industrial Users and shall mean any one or more of the following: (a) Chronic violations of wastewater discharge limits, defined here as those in which sixty- six percent (66%) or more of wastewater measurements taken during a six (6) month period exceed a numeric Pretreatment Standard or Requirement, including Instantaneous Limits; (b) Technical Review Criteria (TRC) violations, defined here as those in which thirty-three percent (33%) or more of wastewater measurements taken for each pollutant parameter during a six (6 ) month period equals or exceeds the product of the numeric Pretreatment Standard or Requirement including Instantaneous Limits, as defined by Section 25-76 multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); (c) Any other violation of a Pretreatment Standard or Requirement (Daily Maximum, long- term average, Instantaneous Limit, or narrative standard) that the Director determines has caused, alone or in combination with other discharges, Interference or Pass Through, including endangering the health of POTW personnel or the general public; (d) Any discharge of a pollutant that has caused imminent endangerment to the public or to the environment, or has resulted in the Director's exercise of its emergency authority to halt or prevent such a discharge; (e) Failure to meet, within ninety (90) days of the scheduled date, a compliance schedule milestone contained in an individual wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; (f) Failure to provide within forty-five (45) days after the due date, any required reports, including BMRs, reports on compliance with Categorical Pretreatment Standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules; (g) Failure to accurately report noncompliance; or (h) Any other violation(s) which may include a violation of Best Management Practices, which the Director determines will adversely affect the operation or implementation of the City's pretreatment program. (Ord. No. 09-39, 10/20/09, Enacted (SUPP 2009-04))
Ask a question about Peoria law
Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.
