Method of connection.
Huntsville Code of Ordinances § 21-125
in effectSec. 21-125. - Method of connection.
The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city.
(Code 1982, § 20-155)
Source: City of Huntsville, Alabama, publisher code (Municode) + enacted ordinances (City Council/Legistar)URL: https://library.municode.com/al/huntsville/codes/code_of_ordinances?nodeId=COOR_CH21SESEDIOTWADI_ARTIISESEDI_DIV4BUSECO_S21-125MECOFetched: 11/6/2026
