§ 18.46.090 — Installation standards
El Paso City Code (Supp. No. 95, Update 4: codified through Ordinance No. 019889, enacted June 23, 2026) · El Paso City Code § 18.46.090
Corpus is an independent public-information project, not the official City of El Paso website. Stable reference: corpuslaw.us/code/478c7711-079b-4aaf-b2af-19828db98b59
18.46.090 - Installation standards.
A. An individual with a state irrigator, irrigation technician, master plumber, or journeyman plumber license shall be on the project site during all irrigation installation work for review and inspection. B. Minor modifications (field changes) at the time of installation may be made to the landscape design (plant materials and irrigation system), by the designer, as long as the changes comply with the standards in this chapter and approved by the building official or designee. C. Installation shall be completed according to the approved permit documents prior to the building final inspection and issuance of a certificate of occupancy or completion.
(Ord. No. 019874, § 1, 5-12-2026)
Ask a question about El Paso law
Corpus searches the El Paso sections it holds and shows the ones that match, with their citations. Free, no sign-in.
