§ 3.3.8 — Site development permits and construction authorization

Code of Ordinances, City of Cape Coral, Florida (Supp. No. 39, Update 1; codified through Ordinance No. 45-26, enacted September 3, 2026) · Cape Coral Land Development Code § 3.3.8

Corpus is an independent public-information project, not the official City of Cape Coral website. Stable reference: corpuslaw.us/code/47e282b2-99d5-4395-9b20-ede425740dc1

Section 3.3.8. - Site development permits and construction authorization.

A. The Development Services Manager shall be authorized to approve, approve with conditions, or deny a site development permit application and construction authorization for the following improvements and installations: 1. Site Development Plan - Construction Authorization; 2. Subdivision Infrastructure - Construction Authorization; 3. Site Improvements; 4. Landscaping; 5. Full Demolition; 6. Parking lot seal coating or re-striping of existing parking lots; 7. Underground Fire Lines; 8. Utility Service Relocations; 9. Land Clearing and Fill; 10. Relocation of Residential Storm Drains; 11. Backflow Prevention; and 12. Spot Dredging. B. Review. The Development Services Manger shall act upon applications for site development permits within 10 calendar days from the date of their submission. C. Approvals. 1. All approvals will be issued in compliance with the approved plans, if applicable, and may contain relevant conditions of the associated plan approval. 2. If the proposed construction or alteration conforms with all applicable provisions of this Code and all other applicable law, the Development Services Manager shall issue a development permit or construction authorization for such construction or alteration. 3. If the proposed construction or alteration fails to conform, he shall refuse to approve and shall deliver written notice to the applicant stating the reason for the refusal. D. Effect of Approval, Expiration, and Extensions. A site development permit or construction authorization shall expire six months from the date of issuance unless the permitted improvements are under construction and have passed a required inspection within the 90 days prior to the expiration of the approval. Erosion control inspections will not extend the expiration date. An approval may be extended for an additional 90 days. Failure to either pass a required inspection or request an extension within the 90-day period provided will result in expiration of the approval. Thereafter, a new approval will be required to continue construction. E. Commencement of Construction. After approval of the plans, the applicant may construct the required improvements, subject to obtaining all required permits and written construction authorization. The Development Services Manager shall be notified in advance of the date of commencement of such construction and the applicant shall schedule a preconstruction meeting where representatives of the developer, the City, contractors, and franchise utilities shall discuss the construction of the planned improvements. No work shall take place prior to the preconstruction meeting. F. Inspections and Certification of Compliance. The developer shall retain the engineer of record or another professional engineer registered in the state of Florida and other professionals, if needed, to inspect the construction progress and certify the construction of all required improvements such as streets, parking areas, drainage structures, drainage systems, water and sewer facilities, landscaping and buffers, and all other improvements, for substantial compliance with the approved plans. G. Right to enter. The Development Services Manager or duly authorized representative shall have the right to enter upon the property for the purpose of inspecting the quality of materials and workmanship and reviewing the construction of required improvements during the progress of such construction. H. Periodic inspection required; correction of deficiencies. The Development Services Manager or his designated engineering and utility inspectors shall periodically inspect all phases of construction of streets, drainage improvements and utility installations including those improvements which are not to be dedicated to the public but are subject to this chapter. The Development Services Manager will immediately call to the attention of the developer, or the developer's engineer, any nonconforming work or deficiencies in the work. Correction of deficiencies in the work is the responsibility of the developer. It is the responsibility of the developer's contractor to schedule the appropriate inspections as identified on the approvals or permits. I. Stop work orders. The Development Services Manager shall have authority to stop work if improvements not authorized in the approved plan are being installed or upon failure of the applicant or his engineer to coordinate the construction of the required improvements so as to minimize activities which may have adverse impacts on surrounding property. 1. Authority. Whenever the Development Services Manger finds any work regulated by this code being performed in a manner either contrary to the provisions of this code or dangerous or unsafe, the Development Services Manager is authorized to issue a stop work order. In addition, the Development Services Manager is authorized to issue a stop work order for the failure to contain or remove construction refuse as required in the Code of Ordinances, Chapter 9, Health and Sanitation. 2. Issuance. The stop work order shall be in writing and shall be given to the owner of the property involved, to the owner's agent, or to the person doing the work. Upon issuance of a stop work order, all work on the construction site shall immediately cease. The stop work order shall state the reason for the order, and the conditions under which the cited work will be permitted to resume. 3. Unlawful continuance. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to penalties as prescribed by law. J. Final inspections by Engineer of Record. Upon completion of all improvements required under the approved plans or phase thereof, an inspection must be performed by the developer's engineer and the landscape architect. Upon finding the development to be completed and in substantial compliance with the approved plans, the engineer and landscape architect must each submit a letter of substantial compliance along with record drawings to the City. No final inspection will be performed by the City until the letter(s) of substantial compliance and record drawings have been accepted. The letter(s) of substantial compliance may include a description of minor changes as shown on the record drawings. Only minor changes which do not substantially affect the technical requirements of the approved plans and this code are to be indicated on the Record Drawings. 1. Letters of substantial compliance shall be digitally signed and sealed in PDF format. Substantial compliance requires that the development, as determined by an on-site inspection by a professional engineer, is completed to all the specifications of the approved plans and that any deviation between the approved plans and actual as-built construction is so inconsequential that, on the basis of accepted engineering practices, it is not significant enough to be shown on the Record Drawings. 2. The respective professionals shall prepare and submit to the City digitally signed and sealed Record Drawings, in PDF format, of the completed project improvements. Record drawings shall be provided for the complete civil engineering and landscape features of the project. 3. Record drawings shall be the complete set of approved plans which show strikethrough and markup of the as-built information obtained from direct field observation, survey, or contractor "as-built" drawings. Topographic surveys will not be accepted. K. Final Inspections by the City. Upon acceptance of the letter of substantial compliance and record drawings, the Development Services Manager will perform final inspections. 1. If the final inspections reveal that the development or phase is in substantial compliance with the approved plans, a certificate of completion will be issued. A certificate of completion is required prior to the issuance of a certificate of occupancy from the building division for any buildings associated with the project. 2. If the final inspections reveal that the development or phase thereof is not in substantial compliance with the approved plans, a list of all deviations will be forwarded to the engineer. All deviations must be corrected prior to reinspection. A new letter of substantial compliance may be required prior to reinspection. Reinspection fees will be charged for each reinspection in accordance with the adopted fee schedule and must be paid prior to receiving a Certificate of Completion. 3. Projects involving permits or approvals issues by County, State, or Federal agencies shall provide evidence that the respective agencies have approved, accepted, or certified that the improvements or work subject to their review have been satisfactorily completed and are ready for use or to be placed into service. L. Turnover of developer installed improvements. Projects that include construction of improvements that will be turned over to the City for ownership and maintenance must also provide a complete package of turnover documents, acceptable to the City, as required by the Director. 1. Improvements shall be conveyed to the City by bill of sale in a form satisfactory to the City Attorney, together with such other evidence as may be required by the City that the improvements proposed to be transferred to the City are free of all liens and encumbrances. 2. Turnover documents must be provided to the Development Services Manager with the submittal of the Certification of Substantial Completion and Record Drawings. 3. Improvements constructed pursuant to this Section may not be placed into service or otherwise utilized until the required certificate of compliance has been issued. M. Ongoing compliance. A development project must remain in compliance with the approved SDP or SCP, including all conditions, after a letter of substantial compliance, certificate of compliance, or certificate of occupancy has been issued by the City. This requirement applies to any property covered by the SDP or SCP, whether or not it continues to be owned by the original developer. For purposes of determining compliance, the SDP or SCP as approved and constructed, or subsequently amended in accordance with this section, will control. The standards applicable to review for compliance purposes will be based upon the regulations in effect at the time the plan approval, any applicable amendment, or revision was constructed. N. Violation of an approved SDP or SCP. 1. Where construction is commenced for improvements not authorized by a SDP or SCP, the applicant will be issued a stop work order until an application to amend or correct the respective plan approval has been submitted and approved. 2. An application to amend or correct a SDP or SCP after construction has commenced in violation of the original approval will be charged an application fee equal to four times the original application base fee. 3. Submittal of the application and payment of the application fee does not protect the applicant from the remedies described in Article 1, Section 1-6 of this Code. Any of these forms of relief can be sought or maintained by the City until the problem is abated. 4. Failure to maintain a development in compliance with a SDP or SCP issued and approved by a certificate of completion constitutes a violation of this Code. O. Phased Projects. Development projects may be split into phases to accommodate the development plans and schedules of the developer. 1. Site Development Plans. The phasing plan shall show all required facilities, infrastructure, and buildings, if applicable, on the entire parcel that is covered by the SDP approval. a. If more than one building is covered by the SDP and the developer does not intend to receive certificates of occupancy (CO) for all the buildings at one time, a separate Site Development Permit or written construction authorization will be required for each build or buildings to receive a CO apart from the other buildings. b. A certificate of compliance for streets, utilities, parking areas, and drainage serving each building(s) will be required from the engineer of record prior to the City performing final inspection and closing that phase of the project and prior to receiving a certificate of occupancy from the Building Division. c. If a final inspection is requested for only a portion of a development, that portion must be an approved phase of the development in accordance with the approved SDP. 2. Subdivision Construction Plans. Phasing of the SCP shall be in accordance with the PSP approval as established in Article 10.