For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.04.040 — DEVELOPMENT REVIEW AND PERMITS

Anaheim Municipal Code (2026 S-28: local legislation current through Ord. 6627, passed 8-11-2026) · Anaheim Municipal Code § 15.04.040

Corpus is an independent public-information project, not the official City of Anaheim website. Stable reference: corpuslaw.us/code/47ff122d-7144-4e3a-97ee-9f4c922cf961

15.04.040 DEVELOPMENT REVIEW AND PERMITS.

.010 Before commencing any work pertaining to the erection, construction, installation, alteration or replacement of a solar energy system, a permit for such work shall be secured from the Building Official by the owner or the owner’s agent. It shall be unlawful to commence such work until and unless a permit has been obtained, or to maintain any installation of a solar energy system which was done without a permit. Any solar energy system erected, constructed, installed, altered, replaced or to which additions are made shall comply with all of the provisions of all health and safety standards and requirements of local, state and federal law. .020 Solar energy systems used for heating water in single family residences and solar collectors used for heating water in commercial or swimming pool applications shall be certified by an accredited listing agency, as defined in the Anaheim Mechanical Code and the Anaheim Plumbing Code. .030 A solar energy system for producing electricity shall also meet all applicable safety and performance standards established by the Anaheim Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability. (Ord. 6337, § 1 (part); August 18, 2015.)

Ask a question about Anaheim law

Corpus searches the Anaheim sections it holds and shows the ones that match, with their citations. Free, no sign-in.