For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Use—Surface and Underground

30 C.F.R. Part 57, Use—Surface and Underground
in effect

30 C.F.R. § 57.6300 Control of blasting operations.

30 C.F.R. § 57.6301 Blasthole obstruction check.

30 C.F.R. § 57.6302 Separation of explosive material.

30 C.F.R. § 57.6303 Initiation preparation.

30 C.F.R. § 57.6304 Primer protection.

30 C.F.R. § 57.6305 Unused explosive material.

30 C.F.R. § 57.6306 Loading, blasting, and security.

30 C.F.R. § 57.6307 Drill stem loading.

30 C.F.R. § 57.6308 Initiation systems.

30 C.F.R. § 57.6309 Fuel oil requirements for ANFO.

30 C.F.R. § 57.6310 Misfire waiting period.

30 C.F.R. § 57.6311 Handling of misfires.

30 C.F.R. § 57.6312 Secondary blasting.