For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 65.830 — Hazardous waste processing facility

Saint Paul Legislative Code (Supp. No. 133, Update 1: codified through Ordinance No. 26-26, adopted May 13, 2026) · Saint Paul Legislative Code § 65.830

Corpus is an independent public-information project, not the official City of St. Paul website. Stable reference: corpuslaw.us/code/49b80758-cd0d-47bb-ab2a-d3775ab9e0b8

Sec. 65.830. - Hazardous waste processing facility.

Any commercial facility, as defined in Minnesota Rules 7045.0020, for which a Minnesota Pollution Control Agency (MPCA) permit is required, treating hazardous waste generated at any off-site location, that is designed and operated to modify the chemical composition or chemical, physical or biological properties of a hazardous waste by means such as reclamation, distillation, precipitation or other similar processes, which neutralizes the waste or renders it nonhazardous, safer for transport, amendable for recovery, storage or reduced in volume, excepting "elementary neutralizing units" and "pretreatment units," as defined in Minnesota Rules, chapter 7045.0020. Hazardous waste processing does not include incineration or disposal. Standards and conditions: (a) The facility shall be located within an area of the city included in the Minnesota Waste Management Board's "Inventory of Preferred Areas for Processing Facilities," dated August 1983, and subject to the facility proposer receiving all applicable permits and approvals, and meeting all conditions. (b) The minimum distance between structures housing hazardous waste processing facilities and residentially zoned property shall be one thousand (1,000) feet measured from the closest point of the structure to the zoning district boundary. (c) An environmental assessment worksheet (EAW) and environmental impact statement (EIS) shall be completed if required under environmental quality board rules. (d) Performance agreements and financial guarantees shall be provided and maintained as required by the conditional use permit. The performance agreements and supporting financial guarantees shall, at a minimum, cover the following: completion of required site improvements; emergency cleanup and mitigation activities by the operator, after which the city may initiate and complete appropriate cleanup activities; and closure activities in accordance with Minnesota Rules 7045.0498—.0524. (e) Submittal of proposer's operating credentials, including: proposer's management experience with comparable hazardous waste facility; proposer's, proposer's partners, and proposer's parent company's net worth and bonding capacity, demonstrating compliance with federal standards as set forth in Code of Federal Regulations (CFR) 40, Parts 123, 264, and 265; references from persons familiar with proposer's hazardous waste facility management experience; evidence of permit application submittal to applicable county, state and federal agencies. (f) Compliance with U.S. Environmental Protection Agency and MPCA inspection and reporting requirements in accordance with CFR 40, Parts 264 and 265 or Minnesota Rules 7045. (g) All facilities newly constructed for or modified for the purpose of processing hazardous waste materials shall be directly accessible from a primary arterial roadway as defined and designated in the transportation section of the comprehensive plan for the city. (h) There shall be a minimum setback from stormwater holding areas, natural drainage facilities, and wetlands in accordance with Minnesota Rules 7045.0460. (i) All stormwater runoff shall be managed in accordance with Minnesota Rules 7045.0526 and 7045.0528. (j) There shall be no outside storage of hazardous waste except as permitted by MPCA. (k) All loading or unloading of hazardous materials must occur in compliance with Minnesota Rules 7045. (l) A copy of the contingency plan, and all amendments and revisions, including operating log, required under Minnesota Rules 7045.0466 must be maintained at the facility and with emergency response agencies of the city. (m) The developer shall provide, at his sole expense, maintenance and continued implementation of approved emergency training programs for all employees at the time of their initial hiring and during their continued employment and for public safety personnel of the city. The training programs shall be reviewed annually for currency. (n) The developer/operator must prepare and maintain contingency plans to include provisions for alerting applicable agencies, and provision for emergency evacuation of the facility and the surrounding area, in accordance with Minnesota Rules 7045.0466. (o) Proposer's site, operating plans, contingency plans, and training programs shall conform to MPCA permit review under Minnesota Rules 7001.0001-.0730. (p) Any conditional use permit issued for facilities under this section shall be subject to an annual review by the planning commission to ascertain that operations of the facility continue to be in compliance with all conditions of the permit and the Legislative Code.

Ask a question about St. Paul law

Corpus searches the St. Paul sections it holds and shows the ones that match, with their citations. Free, no sign-in.