§ 16.5-26 — Design storm frequency
Code of Ordinances, City of Biloxi, Mississippi (Supp. No. 63, Update 1: codified through Ordinance No. 2607, enacted July 28, 2026) · Biloxi Code of Ordinances § 16.5-26
Corpus is an independent public-information project, not the official City of Biloxi website. Stable reference: corpuslaw.us/code/49c982de-6f98-4daf-ad5e-b55b8496eb84
Sec. 16.5-26. - Design storm frequency.
The minimum design frequency for drainage facilities and structures shall be a 100-year, 24-hour storm occurrence. Drainage calculations shall be submitted to the engineering division evaluating stormwater runoff pre- and post- development. Post-development peak stormwater runoff from a 100-year, 24-hour storm event shall not exceed the same storm event pre-construction. At a minimum the first one-inch of runoff from the 100-year, 24-hour storm event shall be detained onsite for water quality. Residential single family homes are exempt from this requirement.
(Ord. No. 2215, § 1, 10-16-12; Ord. No. 2290, § 1, 12-29-2015; Ord. No. 2570, § 1, 10-22-24)
Ask a question about Biloxi law
Corpus searches the Biloxi sections it holds and shows the ones that match, with their citations. Free, no sign-in.
