§ 8.70.035 — Surface parking lots
Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 8.70.035
Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/4a7fd3e7-1bb6-4ee5-bbda-9d24caef5efa
8.70.035 - Surface parking lots.
A. Surface parking lot requirements. Documentation must be submitted with the permit application or permit renewal describing the physical improvements, operating plans, and security measures that will be implemented on the premises to protect patrons from harm, to protect vehicles and property inside vehicles on the parking station from theft, vandalism or other damage, and to protect the public from incidents that threaten public health, safety and welfare the Building Commissioner may waive one (1) or more of the surface parking lot requirements described in this section if he concludes that the parking lot owner can show that the requirements impose a hardship due to an inability to make reasonable use of the property for parking, or impose a hardship on adjacent properties, or that they eliminate access to a public right-of-way. Hardship should be unique to the affected parking lot, not just due to ordinary inconvenience, difficulty, or maximizing the number of parking spaces, and should not generally apply to other properties. All permit applications for surface parking lots must include a site plan or other documentation to demonstrate compliance with the following requirements: 1. A perimeter fence extending along abutting public streets/alleys between every vehicle entry/exit and pedestrian ingress/egress opening. Vehicle entry/exit must be no wider than twenty (20) feet each. Pedestrian ingress/egress must be no wider than six (6) feet. Perimeter fences must have a height of at least four (4) feet, open at least eighty (80) percent (i.e., no more than twenty (20) percent opaque), and constructed of aluminum, steel or other decorative metal. Other permitted options shall include a continuous masonry barrier, or bollards spaced no more than twelve (12) inches apart, or landscaped mounds. Permitted options must be at least three (3) feet in height and capable of deterring trespassing vehicles and pedestrians. For any new surface parking lot constructed after the effective date of this chapter, or any existing surface parking lot that currently has no perimeter fence in compliance with this chapter, no chain link fencing is permitted along any public street or alley except for temporary lots adjacent to an active construction project. No additional barrier higher than six inches is allowed along or adjacent to a perimeter fence. 2. No surface parking lot may operate outside of hours of operation approved by the Building Commissioner. 3. Landscaping shall be free of weeds, trash and debris and be well maintained at all times. 4. Paving and striping must be in good condition. 5. Security lighting must be present and functioning during all non-daylight hours. A perimeter fence extending along abutting public streets/alleys between every vehicle entry/exit and pedestrian ingress/egress opening. 6. Surfaces shall be free of potholes, large cracks, and standing water. 7. Signage must have the address of the surface parking lot, the hours of operation for the surface parking lot, the phone number of its management company and/or owner, and the amount to be charged for parking. A local contact must be provided, in addition to the address and phone number of any out-of-town owner/operator. 8. The property owner/lessee must have an occupancy permit and a business license. The occupancy permit will list the approved hours of operation. 9. All lots must be cleaned of trash, glass, and other debris before opening the following day. An owner, operator, or lessee applying for a temporary construction surface parking lot permit is not required, for the purposes of a temporary permit, to meet requirements 2, 3, 4, 5, 6, 7, 8, 9, and 10. 10. The property owner/lessee must provide a certificate of insurance showing at least one million dollars ($1,000,000.00) of commercial general liability insurance (updated copy sent to the Building Division annually). 11. Security video surveillance system capable of producing retrievable images and videos, and positioned to view the surface parking lot's points of vehicular entrance, exit, and able to view all parked vehicles. 12. Entry and exit by vehicles shall only be possible: a) when an attendant on duty allows entry or exit, or b) by means of a security gate that is part of an automated payment system, or c) mobile phone payment system. B. Permit required for surface parking lot. 1. As of the effective date of the ordinance from which this chapter derives, it shall be unlawful for any individual, firm, association, corporation, partnership, or organization: (a) To operate or maintain a surface parking lot unless the owner, operator, or lessee thereof has applied for and obtained a surface parking lot permit from the City; or (b) To operate such business after such permit has expired or has been revoked or suspended by the City. 2. A surface parking lot permit shall be required for each surface parking lot location, even a location within another business operation. This permit shall be in addition to any other permit or license required by other local, state, or federal government agencies. No permit shall be issued for any business seeking to operate at a location prohibited by any applicable local, state, or federal law, statute, ordinance, rule, or regulation. Every individual, firm, corporation, partnership, organization, or association holding a surface parking lot permit as required under this chapter shall post the permit in a conspicuous place and manner on the premises. 3. Notwithstanding any provision to the contrary, any property owner or lessee, may apply for a temporary construction surface parking lot permit for a property that is temporarily being used for parking in connection with an adjacent construction project, as determined by the Building Commissioner, for which a valid building permit with an estimated cost greater than three hundred thousand dollars ($300,000.00) has been issued. Such temporary construction surface parking lot permits shall be valid for six (6) months at a time and can be renewed up to two (2) times during active construction of an adjacent project. In no event can a temporary construction surface parking lot be permitted for longer than a total of eighteen (18) months unless the Building Commissioner approves an extension. The application for a temporary construction surface parking lot permit must address and meet the requirements for a temporary construction surface parking lot shown in subsection A titled "Surface parking lot requirements" except for subsections 1, 2, 3, 4, 5, 6, 7, and 8. The temporary construction surface parking lot permit shall expire thirty (30) days after substantial completion of the construction project. C. Inspections. Pursuant to Section 8.70.090 of the Revised Code, the Building Commissioner shall make or cause to be made an inspection at least once a year of every surface parking lot. The Building Commissioner is hereby empowered to make such inspections, to appoint designated inspectors to make said inspections, and all surface parking lots shall be open to the inspections of the Building Commissioner or the Building Commissioner's designees, as well as any member of the Police Department, or Neighborhood Improvement Specialist, at any time during the hours allowed by business and other reasonable times. The Building Commissioner shall maintain a record of security incidents taking place on the lot and include it with the inspection report. D. Revocation or Denial of Renewal. The Building Commissioner may revoke an existing permit if any of the following deficiencies or conditions exist: 1. The property is included on the City's list of nuisance properties. 2. The surface parking lot is not being operated in compliance with the surface parking lot requirements described in subsection A of this section. 3. The physical improvements to the surface parking lot have deteriorated or are damaged and no longer function properly. If any of the above deficiencies or conditions have been determined to exist by the Building Commissioner, a letter of warning shall be sent to the permit holder for the surface parking lot no later than sixty (60) days prior to a proposed revocation or denial of renewal of the permit. In the event that the permit holder fails to adequately address the deficiencies or conditions described in the letter of warning, the Building Commissioner shall hold an administrative hearing to determine if the permit shall be revoked or renewal should be denied. E. Permit Revocation, Suspension, or Denial. Following a decision of the Building Commissioner to revoke or suspend a permit, or to disapprove a new or renewal application, such permittee or applicant may seek review in a manner provided by law in Section 8.70.060 and 8.70.070 of the Revised Code of the City of St. Louis. If a permit is revoked by the Building Commissioner, the permit holder may not apply for a new permit for the same surface parking lot for a period of three months. F. Other Code Provisions. All other sections of Chapter 8.70 of the Revised Code of the City of St. Louis that do not contradict this chapter's provisions shall apply to Surface parking lots. G. Authority to Prescribe Additional Rules and Regulations. The Building Commissioner shall have the power to promulgate regulations as may be necessary and feasible for the carrying out of the intent of this chapter and the duties of the Commissioner that are not inconsistent with the provisions of this chapter. The rules and procedures shall be in writing and kept on file in the Building Commissioner's Office and posted to the City's website. In addition, all current surface parking lot permit holders will be promptly notified by certified mail and email of any changes. H. Enforcement. This chapter shall be enforced by the Police Division in conjunction with the Building Commissioner. Consistent with Chapter 8.70 of the Revised Code of the City of St. Louis, the Building Commissioner may order barricades for any or all surface parking lots not in material compliance with the terms of this chapter. I. Contracts Authorized. The Building Commissioner is hereby authorized to enter into contracts or add change orders to existing contracts to carry out the process authorized herein, and is hereby authorized to expend funds thereunder, with no other review, signature, or approval from any other City agency, board or department, except as provided by Charter, for website programming, and other such necessary related work, for the process created under this chapter. J. Severability. If any provisions of this chapter shall be held to be invalid or unconstitutional, the remainder of this chapter shall not be affected thereby but shall remain in full force and effect.
(Ord. No. 71834, §§ 5—14, 4-6-2024, eff. 4-26-2025.)
Ask a question about St. Louis law
Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.