Sec. 18-296. - Adjustment of stormwater utility fees.
(a) Requests for adjustment of the stormwater utility fee shall be submitted through the director of the department of resilience and public works, herein referred to as director, who shall be given authority to administer the procedures and standards and review criteria for the adjustment of fees as established herein. The following procedures shall apply to all adjustment requests of the stormwater utility fee: (1) Any owner, tenant or occupant who has paid his/her stormwater utility fees and who believes the contribution rate component of his/her stormwater utility fee to be unjust or inequitable may, subject to the limitations set forth in this article, submit his/her adjustment request to the director. (2) Adjustment requests for stormwater utility fees paid by an owner, tenant or occupant making the request shall be in writing and set forth, in detail, the grounds upon which relief is sought. (3) Adjustment requests made during the first calendar year that the stormwater utility fee is imposed will be reviewed by the director within a one-year period from the date of filing of the adjustment request. Adjustments resulting from such request shall be retroactive to the beginning of billing, but shall not exceed three years. (4) All adjustment requests for the stormwater utility fee shall be reviewed by the director within a four-month period from the date of filing of the adjustment request. Adjustments resulting from such requests shall be retroactive to the date of filing of the request. Under no circumstances will the city be financially liable beyond the time limits set forth herein. (5) The owner, tenant or occupant requesting the adjustment may be required, at his/her own cost, to provide supplemental information to the department of resilience and public works including, but not limited to, survey, data and engineering reports, approved by either a registered professional land surveyor (R.P.L.S.) or professional engineer (P.E.). Failure to provide such information may result in the denial of the adjustment request. (6) Adjustments to the stormwater utility fee will be made upon the granting of the adjustment request, in writing, by the director. All adjustments will be prorated in accordance with the established procedures of the Miami-Dade Water and Sewer Department. Denials of adjustment requests shall be made in writing by the director. (b) The following standards and review criteria shall apply to all adjustment requests of the stormwater utility fee: (1) Existing or special characteristics of the site or parcel for which the adjustment request is made will be considered. (2) The amount of on-site impervious area. (3) The design storm frequency and storm duration criteria currently in use by the department of resilience and public works at the time of the adjustment request will be the minimum accepted and the standard recognized by the director for stormwater management systems draining the public right-of-way. (4) Ponds, exfiltration systems or positive drainage facilities accepting stormwater from the public right-of-way must meet applicable city, state, and federal requirements including groundwater protection devices and outfall treatment and conveyance systems required by all governing bodies. (5) Ponds, exfiltration systems or positive drainage facilities accepting stormwater from the public right-of-way must be maintained according to city standards and must function in accordance with required city design standards. (6) Adjustments will not be granted for swimming pools, reflecting pools, existing open ditch systems, and swales. (7) Adjustments will not be granted for compliance with on-site storm drainage/retention rules and regulations for private property development. (c) Upon receipt of the written denial of the adjustment request, the owner, tenant or occupant who initially requested the adjustment may, within 30 days of receipt of such denial, apply to the director for review of the denial. (1) The director, exclusive of his/her designee, shall complete his/her review within 60 days of receipt of said request for review. The director's determination on the review shall be in writing and set forth, in detail, the reasons for his/her decision. (2) In reviewing denials of adjustment requests, the director, exclusive of his/her designee, shall apply the standards and review criteria contained in this section. In the event of a hardship the director, exclusive of his/her designee, may base his/her determination on written grounds other than those contained herein. (3) All determinations of the director arising out of this section will be final.
(Ord. No. 10395, § 6, 3-10-88; Ord. No. 11076, § 1, 7-22-93; Code 1980, § 53.5-26; Ord. No. 13366, § 2, 3-14-13; Ord. No. 13676, § 2, 4-27-17; Ord. No. 13792, § 1, 10-11-18)
Ask a question about Miami law
Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.