STREETS, SIDEWALKS AND PUBLIC IMPROVEMENTS
Peoria, Ariz., City Code ch. 23
in effectPeoria, Ariz., City Code § 23-2 Reserved. (Ord. No. 91-45, 11/12/91, enacted as section 2-102; Ord. No. 96-17, 4/2/96, enacted and recodified from Sec. 2-106; Ord. No. 97-38, 7/15/97, Repealed; Ord. 02-41, 6/4/02, Renumbered to Sec. 23-2 (SUPP 2002-2))
Peoria, Ariz., City Code § 23-3 Engineering; superintendent of streets, city engineer; designation.
Sec. 23-3. Engineering; superintendent of streets, city engineer; designation.
(a) The Director of Engineering shall hold the additional office of Superintendent of Streets, and perform all duties and exercise all rights thereto, as an addition and not a limitation to the duties established in Chapter 2 of this code.
(b) The Director of Engineering shall be designated as and have all the duties and powers of the City Engineer as set forth in state law and under the Peoria City Charter and this Code.
(Ord. No. 97-38, 7/15/97, Repealed and Renumbered to Sec. 23-5; Ord. No. 97-38, 7/15/97, enacted; Ord. No. 01-170, 11/6/01, Amended (SUPP 2001-4); Ord. 02-41, 6/4/02, Renumbered to Sec. 23-3 (SUPP 2002-2))
State law reference(s)—Appointive officers, A.R.S. § 9-471.B.3.(f).
Peoria, Ariz., City Code § 23-4 Reserved. Editor's note(s)—Ord. No. 2017-35, § 1, adopted June 13, 2017, repealed § 23-4, which pertained to engineering department; establishment and derived from Ord. No. 91-45, 11/12/91, enacted as section 2-103; Ord. No. 94-65, 8/30/94, subsection (c) enacted as section 2-106; Ord. No. 95-32, 5/23/95, amended subsection (a); Ord. No. 96-17, 4/2/96, enacted and recodified from 2-103; Ord. No. 97-38, 7/15/97, Repealed; Ord. 02-41, 6/4/02, Enacted (SUPP 2002-2); Ord. No. 09-34, 08/25/09, Amended (b) and (c) (SUPP 2009-3).
Peoria, Ariz., City Code § 23-5 Obstruction of streets.
Sec. 23-5. Obstruction of streets.
(a) It is unlawful to obstruct or to permit another to obstruct any public street or alley, sidewalk or park or other public property within the City by committing any of the following:
(1) Interfering or blocking the legal access and egress to any business lawfully conducted by anyone, in or upon, or facing or fronting on any of such streets, alleys, sidewalks, parks, or other public grounds in the city.
(2) Depositing, throwing or placing any glass, tacks, nails, refuse, rocks or dirt on any street, alley or sidewalk open to the public or any public property within the City.
(3) Depositing, throwing or placing any grass, rubbish, or solid waste on any street, alley or sidewalk open to the public or on any public property within the City, except in a container designated for collection of such items by the City.
(4) Blocking or closing any street, alley or sidewalk open to the public for purpose of a public assemblage without obtaining a permit from the City. The Police Department and City Engineer or their designee are authorized to remove any such blockages or closures without notice.
(5) Sleeping on any street, alley or sidewalk open to the public or on any public property within the City, except in designated shelters and facilities
(b) It is unlawful to obstruct or to permit another to obstruct any traffic lane or any part of any public street or sidewalk on any city street by leaving or moving any traffic control device, barricade or any other item interfering with vehicular or pedestrian in place in violation of any individual permit or approved construction plans and approved Traffic Control Plans issued by the City Engineer or his designee.
(1) It is unlawful for any person or entity to install on any street or sidewalk on any city street a traffic control device, barricade or any other item interfering with the movement of vehicular or pedestrian traffic without having first obtained an individual permit or approved construction plans from the City Engineer or his designee. The City Engineer or his designee may remove summarily without notice from any city street or sidewalk any traffic control device, barricade or any other item interfering with the movement of vehicular or pedestrian traffic that has been placed in such location without an individual permit or approved construction plans. Any item summarily removed may be removed first and notice provided to the Owner by first class mail or telephone to the address on the item or the last known address on file with the City or the address within the Phoenix Metro Area Telephone Directory. The owner of such traffic control device, barricade or other item interfering with the movement of vehicular or pedestrian traffic shall be charged a storage fee of $5.00 per day per item. In the event of a conviction for violation of this section, the Court shall impose all current due and pending storage charges as restitution to the City. The lack of an individual permit or approved plans in the Office of the City Engineer or his designee shall be conclusive evidence that such traffic control device, barricade or any other item interfering with the movement of vehicular or pedestrian traffic has been placed in such location without an individual permit or approved construction plans.
(c) It is unlawful to interfere with the free movement of traffic resulting in obstructing any public street, alley, sidewalk or publicly owned parking area by engaging in the sale of merchandise or requesting gifts or donations on the public street, alley, sidewalk or public parking lot.
(d) Violations of Subsection (b) shall be subject to a minimum fine of $250.00 for an individual and $1,000.00 for an enterprise. The Court may order the revocation of any right-of- way, construction or barricade permit, traffic control plan or direct that the approval of the construction plans be revoked.
(e) Upon summary removal, if the barricading company or general contractor has not paid all accrued storage fees within thirty (30) days following notice, the property shall be presumed to be abandoned to the City. At the conclusion of the thirty (30) day period, the Public Works Director shall notify the general contractor and barricading company that the property has been abandoned to the City and will be sold as excess property or transferred to the City in exchange for all accrued storage fees owed to the City. Notice of this section shall be included in each construction permit, traffic control plan and barricading plan approved by the City.
(Code 1977, § 5-1-13; Ord. No. 91-45, 11/12/91, enacted as section 2-104, public services; Ord. No. 94-65, 8/30/94, enacted as section 2-107, engineering; Ord. No. 96-17, 4/2/96, enacted and recodified from 2-104; Ord. No. 97-38, 7/15/97, Repealed and former Sec. 23-1 enacted; Ord. No. 01-181, 12/11/01, Amended (SUPP 2001-4))
State law reference(s)—Obstructing a highway or public thoroughfare, A.R.S. § 13-2906.
Peoria, Ariz., City Code § 23-6 Digging ditches across streets.
Sec. 23-6. Digging ditches across streets.
It is unlawful for any person to make any ditch or to convey any water in or across any street, alley, right-of-way or easement in the City, except with the written approval of and in conformance with the plans approved by the Director of Engineering or designee.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-7 Protection of excavations, summary action by City, lien upon property; violations; classification.
Sec. 23-7. Protection of excavations, summary action by City, lien upon property; violations; classification.
(a) It is unlawful to make any excavation or dig any hole, drain or ditch in any highway or thoroughfare without providing a sufficient light at night and a temporary fence or suitable obstruction in accordance with the barricading standards adopted by city or promulgated by the Engineering Director, around or in front of such excavation during the day.
(b) It is unlawful to maintain a well, cellar, pit, or other excavation of more than (2) feet in depth on any unenclosed lot, without substantial curbing, covering or protection.
(Code 1977, § 5-1-4; Ord. No. 97-38, 7/15/97, Renumbered from Sec. 13-42 and subsection (a) amended; Ord. No. 01-181, 12/11/01, Amended (SUPP 2001-4); Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-8 Dangerous construction practices.
Sec. 23-8. Dangerous construction practices.
(a) It is unlawful to maintain or allow any signs, billboards, awnings, and other similar structures over or near rights-of-ways, easements, streets, sidewalks, public grounds or places frequented by the public, so situated or constructed as to endanger the public safety. It shall be presumed that any signs located within the vision triangle at any intersection or driveway as defined in accordance with the Zoning Ordinance of the City of Peoria, Arizona endangers the public safety, unless authorized by this Code or the City Zoning Ordinance.
(b) It is unlawful for any person to engage in any construction project on an arterial roadway in the City lasting longer than a period of One Week without posting signage in a form approved by the City Engineer or his designee indicating the dates of such construction and a telephone number where the person responsible for the construction project on behalf of the person or contractor may be contacted. The permit, plan approval or authorization by the City shall indicate the authorized time for the construction and shall govern the requirements of this subsection. Notwithstanding the foregoing, in the case of construction projects on arterial roadways as defined in the adopted General Plan of the City, the City Engineer or his designee may require additional notification to the public, including but not limited to advance public meetings, additional postings and written notice left at each residence and business within the area deemed impacted by the City Engineer or his designee.
(c) It is unlawful for any person, firm or corporation laying or replacing pavement on a street, sidewalk or other public place or making an excavation in the same, to fail to maintain suitable barricades in accordance with the adopted barricading standards and pursuant to an individual permit, traffic control plan or approved construction plans issued by the City to prevent injury of any person or vehicle by reason of the work; such barricades shall be protected by a light at nighttime.
(d) It is unlawful for any person, entity or firm to drop, place or leave any barricade or traffic control device used for temporary traffic or pedestrian control on any sidewalk or street of the City for a period of more than two (2) working days following the completion of construction, or to remove such barricades or traffic control devices from the street and store them in such a manner as to block the sidewalk. The City Engineer or his designee is authorized to summarily remove such barricades and impose a storage fee of $5.00 per day per item. No barricades or traffic control devices shall be returned without payment of the fee. Upon summary removal, the City Engineer or his designee shall notify the barricading company and the general contractor by telephone, facsimile or in writing of the summary removal. If the barricading company or general contractor has not paid all accrued storage fees within thirty (30) days following notice, the property shall be presumed to be abandoned to the City. At the conclusion of the thirty- (30) day period, the City Engineer or his designee shall notify the general contractor and barricading company that the property has been abandoned to the City and may be sold as excess property or transferred to City Use. Notice of this section shall be included in each construction permit and barricading plan approved by the City.
(e) For purposes of this ordinance, completion of construction shall be deemed to be the approval and acceptance of the work by the City Engineer or his designee upon inspection.
(f) Notwithstanding action taken pursuant to subsection (d) of this section, violation of this section shall be a class (1) misdemeanor. Upon conviction of a violation under this Section, the Court shall impose a fine of not less than One Thousand Dollars ($1,000.00) upon an individual and not less than Two Thousand Five Hundred Dollars ($2,500.00) upon an enterprise, together with restitution for any costs incurred by the City under this section.
(Code 1977, § 5-1-1; Ord. No. 97-38, 7/15/97, Renumbered from Sec. 13-43 and amended; Ord. No. 01-181, 12/11/01, Amended (SUPP 2001-4))
Peoria, Ariz., City Code § 23-9 Building material on streets and sidewalks.
Sec. 23-9. Building material on streets and sidewalks.
(a) It shall be unlawful for any person to drop, place or leave any brick, stone, gravel, sand or building material of any kind or nature on any public right-of-way, easement, street, alley or sidewalk in the City or to permit any person in his employ to drop, place, or leave any brick, stone, sand, gravel or building material of any kind whatsoever upon any public street, alley or sidewalk without immediately removing the same except upon the permission of the Director of Engineering or designee. For purposes of construction, the Engineering Director or designee may grant waivers of this section for a limited period.
(b) Violation of subsection (a) shall be a class one misdemeanor. Each day of violation of subsection (a) shall constitute a separate and distinct offense. For any person or company found guilty of violation of subsection (a), where such violation occurred on an arterial roadway in the City as defined in the City's adopted General Plan, in addition to any fine imposed by the Court, a surcharge of One Thousand Dollars shall be imposed as restitution to the City for the Traffic Congestion resulting from such violation.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-11 Street naming; street name changes.
Sec. 23-11. Street naming; street name changes.
A developer/subdivider may propose the street names (i.e., identification/designation) subject to the final approval by the City Council. The street names on plats are tentative and the Engineering Department shall assign the final street names as part of the final plat or right-of- way deed approval process. The final street name approval shall be authorized by the City Council via resolution, plat or right-of-way approval.
The City shall set up Administrative Procedures for establishing and changing street names. The Administrative Procedure shall establish rules and guidelines for the City to implement with respect to establishing and changing street names. Additionally, such Administrative Procedures shall be updated when, in the opinion of the City Engineer, the conditions of the current procedures have changed so as to necessitate such update. Requests for street naming or changing a street name shall comply with the City's Administrative Procedures. The Administrative Procedures shall be available at the City Clerk's office and the City Engineering Department during normal business hours.
Street names will be consistent with the natural alignment and extension of existing streets, the Maricopa Association of Governments Address and Street Alignment Policy, and other constraints and considerations the City deems necessary. New Street names shall not duplicate in whole or in part, or be confusing with existing street names. The Engineering Department reserves the right to modify street names to conform to City standards.
Changes to street names (i.e., renaming streets) on an approved and recorded plat shall require a re-plat.
(Ord. No. 03-179, 11/04/2003, Enacted (SUPP 2003-4))
Peoria, Ariz., City Code § 23-12 House and building numbers to be displayed.
Sec. 23-12. House and building numbers to be displayed.
Property owners within the City must obtain the correct residence, business or other building numbers as assigned to the property from the City. When the property owner requests four or more separate addresses for a single project/parcel in a commercial development, a fee shall be paid as set forth in Chapter 2 of the city code.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-13 Streets; mandatory minimum development requirements.
Sec. 23-13. Streets; mandatory minimum development requirements.
Any parcel of land in the city being developed shall comply with the following minimum street standards, these minimum standards shall not preclude the Engineering Director or designee from imposing additional and or increased standards as may be provided in the City's comprehensive plan, specifications, standards and guidelines.
(a) Access to a dedicated public right-of-way.
(b) Dedication of minimum required city right-of-way of 25 feet from center line or the minimum required under the city's subdivision regulations.
(c) Installation of paving, curb, gutter, required street, safety and regulatory signs and sidewalk abutting property to city specifications, standards and guidelines, unless the Engineering Director or designee authorizes development of the street to the city's rural standard, in which case the minimum rural standards for the street shall be complied with. In lieu of requiring the improvements under this section, the city manager or his designee may enter into a development agreement to provide that the improvements may be made in conjunction with other improvements or through participation in an improvement district or under such other requirements as deemed acceptable to the city manager or his designee and approved by the city attorney or his designee.
(d) Prepaid maintenance for the street based on a front footage basis unless waived by the Engineering Director or designee.
(e) Design and construct required street lights and dedicate street lights to the city in Arizona Public Service areas. In Salt River Project service areas, the owner or developer shall pay the investment fee charged by the Salt River Project for the street lights.
(f) Participate in the construction of required piping, box culverts and drainage facilities required by the road improvements made by developer to convey existing sheet flows from the property as determined by the public works director or his designee.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-14 Streets; dedication and improvement requirements; initial analysis.
Sec. 23-14. Streets; dedication and improvement requirements; initial analysis.
Notwithstanding the provisions of section 23-13, the Engineering Director or his designee may require an initial analysis of any parcel of land to determine if the city should require additional right-of-way dedications and street improvements.
(a) The initial analysis shall consist of the following:
(1) A trip generation study performed by a registered engineer in this state acceptable to the Engineering Director or his designee at applicant's expense, taking into account existing capacity of roadway and impacts of the proposed project on access, visibility, traffic load and turning movements, or such other study that is acceptable to the Engineering Director or his designee.
(b) Based on the initial analysis, the Engineering Director or his designee may impose the following additional requirements.
(1) Additional right-of-way dedication up to the maximum provided under the city's comprehensive plan.
(2) Additional building restricted areas for vision corridors.
(3) Additional walls and building restricted areas for truck traffic mitigation.
(4) Deceleration lanes and dedicated turn lanes.
(5) Bus bays and bus shelters.
(6) Additional paving and paving repairs.
(7) Traffic signals.
(8) Additional street lighting on major and minor arterial roadways.
(9) Restrictions on access to roadway and/or traffic medians to restrict left hand turning movements.
(10) Drainage facilities for street drainage.
(11) Any other requirement that the Engineering Director or his designee determines necessary to provide for traffic safety, pedestrian and vehicular access and to mitigate impacts on street capacity and maintenance.
(c) The Public Works Director or his designee shall base the initial analysis on the following factors:
(1) The connection between the city requirements and the impact resulting from the development, and
(2) Whether the nature of the city required action is proportional to the development impact.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-18 Streets; establishment or alteration.
Sec. 23-18. Streets; establishment or alteration.
(a) The city council may establish or alter streets in the city and acquire real property for such purposes by purchase, donation, dedication, eminent domain or other lawful means. Alternatively a street may be established or altered through the platting process as provided in the Subdivision Regulations.
(b) Only those streets designated as public streets as of the date of the enactment of this section and those streets established after the date of the enactment of this section as public streets in accordance with this section shall be public streets under the control of the city.
(c) The establishment of a public street pursuant to this section shall require:
(1) The city council by resolution shall designate the routing for the proposed public street, establishing its general course and direction.
(2) For any street established in accordance with this section, the city may acquire and accept the dedication of real property for street purposes.
(3) Upon recommendation of the Engineering Director or designee, the city council may approve the establishment of the street and accept the street for inclusion in the city street system and designate the street for inclusion on the street classification map required by this chapter.
(d) The city may accept the dedication of rights-of-way and easements for future public streets in advance of establishing such public streets. The acceptance of dedication of rights-of- way and easements shall not be construed as establishing a public street.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-19 Street Classification Map.
Sec. 23-19. Street Classification Map.
(a) A street classification map for the city shall be prepared by the Director of Engineering and approved and amended by the city council by resolution. The street classification map shall designate all parkways, major arterial roadways, minor arterial roadways and collector streets, including routing for proposed public streets, not established and approved by the city council.
(b) The initial street classification map for the city shall be prepared and submitted to the city council on or before March 31, 1998. Upon adoption by the city council, three copies of the map shall be on file in the city for public inspection in the offices of the city clerk, city attorney and engineering department.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-20 Reserved. (Ord. No. 97-38, 7/15/97)
Peoria, Ariz., City Code § 23-21 Reserved. (Ord. No. 97-38, 7/15/97, Repealed)
Peoria, Ariz., City Code § 23-22 Scallops; street construction; definitions.
Sec. 23-22. Scallops; street construction; definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
(a) Change of use means the change of zoning on an existing parcel, lot or piece of property from an agricultural or single family residential use to any other zoning classification.
(b) Cost means the actual cost of:
(1) Construction of the public street improvements as determined by the construction contract price.
(2) Inspection and permit fees.
(3) Engineering fees required for the preparation of plans and specifications.
(4) Other incidental fees required to complete the improvements.
(c) Development shall mean the issuance of building permits for the construction of residential, commercial or industrial buildings and structures or major additions or alterations to existing structures, and includes new buildings or structures on property having existing buildings or structures situated on such property. When such property is zoned for agricultural or single family residential use at the time of the assessment, development shall also require a change of use or purpose.
(d) Major addition or alteration means the construction, reconstruction, addition to, improvement of, or alteration to an existing structure in excess of the greater of five thousand dollars ($5,000.00) or five (5%) percent of its full cash value as shown on the most recent tax roll of the Maricopa County Assessor.
(e) Property owner means the individual, corporation, partnership, trust or other legal entity that owns property adjacent to the street right-of-way.
(f) Right-of-way means land which by deed, conveyance, agreement, easement, dedication, usage or process of law is reserved for or dedicated to the general public for street, highway, alley, public utility, pedestrian, walkway, bikeway or drainage purposes.
(g) Single family residential use means property which is currently zoned to permit the construction of detached single family residences. Single family residential use does not include mobile home parks or multifamily housing units, whether single or detached.
(h) Street Improvements include portland cement or asphaltic concrete surfacing, aggregate base, curb and gutter, valley gutter, concrete sidewalk, water facilities, wastewater facilities, street lights, landscaping and tiling of an irrigation ditch and storm drainage facility if required.
(i) Streets means the full width of the right-of-way of any road, street, highway, alley, land or sidewalk used by or for the general public, whether or not said road, street, highway, alley, land or pedestrian right-of-way has been improved or accepted for maintenance by the City.
(Code 1977, §§ 17-1-1, 17-1-4; Ord. No. 90-57, 11/13/90; Ord. No. 97-38, 7/15/97, Repealed existing section and Sec. 23-25 renumbered and amended)
Cross reference(s)—Definitions and rules of construction generally, § 1-2.
State law reference(s)—Construction of Streets and Sidewalks, A.R.S. § 9-243.
Peoria, Ariz., City Code § 23-23 Scallops; street construction; appeals.
Sec. 23-23. Scallops; street construction; appeals.
The determination of necessity by the council resulting in the assessing of property under this chapter may be appealed by any aggrieved party to the superior court.
(Code 1977, § 17-1-61; Ord. No. 97-38, 7/15/97, Repealed existing section and new section enacted)
Peoria, Ariz., City Code § 23-24 Scallops; construction of streets; limitations on non-improvement district assessments.
Sec. 23-24. Scallops; construction of streets; limitations on non-improvement district assessments.
(a) The assessment of property, if adjacent arterial streets are involved, shall not exceed the cost of improving more than one-half of the width and more than one thousand (1,000) lineal feet of such adjacent arterial street, except that if any parcel of land is presently being used for single- family residential use and the width of such does not exceed two hundred (200) lineal feet, such property shall not be assessed greater than one-half the cost of the average residential property within the city.
(b) The assessment of property shall not exceed the actual expense incurred by the city at the time of construction.
(c) Any assessment under this section shall abate if the property has not been developed within ten (10) years of the assessment.
(d) Upon payment of any assessment under this section, the Engineering Director may record a satisfaction of assessment with the Maricopa County Recorder.
(Code 1977, § 17-1-6; Ord. No. 97-38, 7/15/97, Repealed existing section and new section enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-25 Reserved. (Ord. No. 97-38, 7/15/97)
Peoria, Ariz., City Code § 23-26 Scallops; Resolution of Intention to Order Improvements.
Sec. 23-26. Scallops; Resolution of Intention to Order Improvements.
(a) Upon the determination of the Engineering Director that the public health, safety, welfare and convenience requires the construction of streets prior to the development of the adjacent property, a resolution of intention to order the improvement shall be submitted to the City Council.
(b) Each property owner which may be subject to any assessments under this chapter shall receive written notice of the council action at least ten (10) days prior to the date of the hearing. An affidavit of mailing of such notice shall be filed in the office of the City Clerk.
(c) If the council receives any written objections, prior to acting on the resolution of intention to order improvements, the City Council shall hold a public hearing. The public hearing shall be for the purpose of receiving comment on whether the proposed improvements are required for the public health, safety, welfare and convenience.
(d) After the public hearing is concluded, the city council shall determine whether the public health, safety, welfare and convenience require the street improvements. If the City Council so determines, then the City Council shall adopt the resolution of intention to order the improvement. The determination shall include that the street improvements shall be constructed or improved at City expense. Such expense shall be assessed against the property owner in accordance with the provisions of this article.
(e) The resolution of intention to order the improvement shall contain:
(1) A description of the street, road or highway to be improved.
(2) A general description of the proposed improvements, including the estimated total cost and cost per linear foot.
(3) The estimated cost of assessment for each affected parcel of property.
(f) The City Council's decision on necessity for street improvements and construction shall be final and conclusive, and if such decision results in the assessment of property under this chapter, it may be appealed as provided in this chapter.
(Ord. No. 90-57, 11/13/90; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-27 Scallops; Notice of Assessments.
Sec. 23-27. Scallops; Notice of Assessments.
(a) Not less than ten (10) days after the City Council adopts the resolution of intention to order improvements, the Engineering Director shall serve upon each owner of real property adjacent to the improvement and subject to assessment a written notice of assessments.
(b) The notice of assessments shall contain:
(1) The name, address and tax parcel number of each property owner.
(2) The total assessment against the property for the proposed improvement.
The notice of assessments shall advise the property owner of their right to submit written objections to the amount of assessment to the city or to appear in person at a public hearing to object to the amount of assessment. Objections shall be filed within fifteen days after receipt of the notice of assessments. Upon receipt of an objection, a public hearing shall be scheduled before the city council on the objections and confirming of assessments. The public hearing shall be at least ten (10) days after notice was mailed to each property owner.
(Ord. No. 90-57, 11/13/90; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-28 Scallops; Adoption and Imposition of Assessments.
Sec. 23-28. Scallops; Adoption and Imposition of Assessments.
(a) The City Council shall hold a public hearing on all objections to the assessments.
(b) At the public hearing or at any time thereafter to which the hearing may be continued, the City Council shall hear and rule upon all objections. The decision of Council shall be final and conclusive as to all errors, informalities and irregularities which the council might have remedied or avoided at any time during the progress of the proceedings. If the council determines that the objections should be granted, the Engineering Director shall reissue the notice of assessment. If the Council determines that the objections shall be overruled, the Council shall adopt an order and resolution overruling all objections and confirming the assessments established by the Engineering Director.
(c) The order and resolution confirming the assessments and describing the property against which the assessments are imposed shall be recorded in the office of the Maricopa County recorder, together with a specific written notice of the assessment containing:
(1) The amount of the assessment.
(2) The legal description of and the tax parcel number of the subject property.
(3) The name of the property owner.
(4) The conditions which require payment of the assessment.
(d) Upon recording of the order and resolution and notice of assessment, the amount so assessed shall be lien upon the property assessed for ten (10) years thereafter or until such assessments are paid and such recording shall be notice to all persons interested in the contents of the record.
(e) Assessments levied against property containing multiple leaseholds may be subdivided by the City Engineer to apply against each leasehold based on the amount of the leasehold interest compared to the total interest.
(Ord. No. 90-57, 11/13/90; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-29 Scallops; Limitation on Assessments.
Sec. 23-29. Scallops; Limitation on Assessments.
(a) The assessment of property, if adjacent arterial streets are involved, shall not exceed the cost of improving more than one-half of the width and more than one thousand (1,000) lineal feet of such adjacent arterial street, except that if any parcel of land is presently being used for single family residential use and width of such does not exceed two hundred (200) lineal feet, such property shall not be assessed greater than one-half the cost of the average residence within such city or town.
(b) The assessment of property shall not exceed the actual expense incurred by the city at the time of construction.
(c) Any assessment under this chapter shall abate if the property has not been developed within ten (10) years of the council order and resolution adopting and confirming the assessment.
(Ord. No. 90-57, 11/13/90; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
Peoria, Ariz., City Code § 23-30 Scallops; Street Construction; Collection; Payment and Satisfaction of Assessments.
Sec. 23-30. Scallops; Street Construction; Collection; Payment and Satisfaction of Assessments.
(a) The city manager or his designee shall collect any unpaid assessments prior to issuing a building permit for development of any assessed property.
(b) The city manager or his designee shall collect any unpaid assessments prior to the city council, planning and zoning commission or planning and zoning director approving any request for rezoning or site plan for development of any assessed property.
(c) Assessments levied under this chapter against real property having multiple lease hold interests may be payable in part by each leasehold interest at the time of application for a building permit, conditional permit or special use permit.
(d) The Engineering Director or his designee shall collect any unpaid assessment prior to the City Council's approval of any final subdivision plat which plat will result in a subdivision of property assessed under this chapter.
(e) The Engineering Director or his designee shall collect any unpaid assessment prior to final of any grading permit required by the Peoria City Code for any assessed property.
(f) Upon payment of the assessment in full or in part, a full or partial satisfaction evidencing payment shall be recorded in the office of the Maricopa County Recorder.
(g) When it is necessary to improve a full street and sufficient right-of-way is not available, the Engineering Director may obtain the right-of-way upon terms that are just to the property owner and the City, including assumption by the City of all or part of the costs of street improvements.
(Ord. No. 90-57, 11/13/90; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-31 Scallops; street construction; appeals.
Sec. 23-31. Scallops; street construction; appeals.
The determination of necessity by the City Council resulting in the levying of assessments upon any property under this article may be appealed by the aggrieved part to the Superior Court of Arizona, Maricopa County. In the event any part or portion of this ordinance is declared unenforceable by any court of competent jurisdiction, all other portions of this article not declared unenforceable shall be deemed separate and apart and shall continue to be in full force and effect.
(Ord. No. 90-57, 11/13/90; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
Peoria, Ariz., City Code § 23-32 Public Improvement Repayments; Definitions.
Sec. 23-32. Public Improvement Repayments; Definitions.
The following words, terms and phrases, when used in sections 23-32 through 23-39 shall have the meanings set forth below, unless the context clearly indicates a different meaning:
(a) Benefitted party means the person or entity creating a demand for or otherwise utilizing special public improvements resulting in a special benefit for which the benefitted party has not specifically contributed to the costs in providing such special public improvements.
(b) City means city of Peoria, Arizona.
(c) Costs means the actual cost of:
(1) Right-of-way or easement acquisition;
(2) Construction of the special public improvements as determined by the construction contract price or by the actual costs, such construction to include, but shall not be limited to construction and installation of water pipes and lines, sanitary, irrigation and storm sewer lines and systems, asphaltic and concrete paving, curb, gutter and sidewalks, street lights, traffic signals and public landscaping.
(3) Inspection, testing and permit fees;
(4) Engineering and design fees required for preparation of plans and specifications;
(5) Administrative charges paid to the city by the developer or owner;
(6) Incidental fees, expenses and charges, including but not limited to capitalized interest required to complete the improvements.
(d) Development agreement means an agreement between one or more parties and the city pursuant to A.R.S. § 9-500.05.
(e) General public benefit means that portion of the expense of the special public improvement that is for general public benefit and does not specially benefit the property subject to reimbursement for special public improvements.
(f) Reimbursement amount means the charge which must be paid to the city and imposed upon the owner or developer of property which has or will receive the benefit of special public improvements benefitting their property.
(g) Special benefit means a benefit to a specific parcel of real property from a special public improvement based on a calculation of traffic generated as the result of the special public improvement; volume generated as the result of the special public improvement, cost per frontage foot of the special public improvement or cost apportioned per acre of the special public improvement.
(h) Special public improvements means any publicly dedicated rights-of-way, any street, drainage, water or sewer improvements or facilities or any other improvements financed by bonds, general funds, water utility funds or sewer utility funds and are completed after the effective date of this ordinance.
(Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
State law reference(s)—A.R.S. § 9-500.05.
Peoria, Ariz., City Code § 23-33 Public Improvement Repayments; Policy.
Sec. 23-33. Public Improvement Repayments; Policy.
Sections 23-32 through 23-39 intend to provide for the extension of special public improvements into undeveloped areas of the city by encouraging the extension of such improvements and providing for the reimbursement of the costs of such improvements other than those costs which are for general public benefit by the owners of parcels which specifically benefit from such improvements and which are not subject to any other special assessments or special charges for the benefit which they receive from the special public improvement.
(Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
Peoria, Ariz., City Code § 23-34 Public Improvement Repayments; Construction of special public improvements.
Sec. 23-34. Public Improvement Repayments; Construction of special public improvements.
Prior to a permit being issued for construction of special public improvements for which repayment of reimbursement amount is being requested, the following requirements shall be met:
(a) A diagram describing all property which will be benefitted by any special public improvements to be installed shall be provided to the Engineering Director or designee.
(b) The field engineering, plans and specifications required for the special public improvement may be prepared by the owner or the city. If prepared by the owner they must be approved by the Engineering Director or designee prior to construction. The engineering costs for preparation of plans and staking of the special public improvements only, which are incurred by the person, may be included as determined by the public works director or his designee in the agreed construction costs as provided in this section.
(c) For any special public improvements which are constructed, the owner shall furnish and install to city specifications all facilities within the boundary of the designated area of the development.
(d) Detailed plans and specifications for special public improvements which are extensions to existing public facilities must be approved by the Engineering Director prior to construction. The costs for the preparation of plans and specifications, diagrams and other information required by the owner to comply with sections 23-32—23-39 shall be assumed by the owner.
(e) The project shall be bid in accordance with the provisions pertaining to public works projects contained in A.R.S. Title 34. The bids shall be opened by the city on a pre-determined date agreeable to the owner and the city. The city and the owner reserve the right to reject any or all bids. The construction costs shall be determined prior to the commencement of construction and shall be approved by the city. In the event that the agreed upon construction costs increase, the repayment agreement may be amended upon approval of the additional construction costs by the city.
(f) The city will perform the inspection during construction and shall charge the owner for the inspection of the special public improvements. The costs of such inspections may be included in any repayment agreement.
(g) The ownership of all special public improvements upon inspection and acceptance as meeting city standards shall be vested in the city.
(Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
State law reference(s)—A.R.S. § 34-201.2.
Peoria, Ariz., City Code § 23-35 Public Improvement Repayments; Authorization of repayment agreements.
Sec. 23-35. Public Improvement Repayments; Authorization of repayment agreements.
(a) Upon development of any property within or outside of the city limits for which a special public improvements project will be constructed, the developer or owner paying the cost of the special public improvements may request the city manager or his designee on behalf of the city to enter into a reimbursement agreement to collect reimbursement amounts from the developers and owners of parcels specially benefitted by the project located within or outside the city.
(b) Upon construction of special public improvements the cost of which were financed by bonds issued by the city, including improvement or assessment bonds, the city may impose upon and collect reimbursement amounts pursuant to the terms of section 25-37.
(c) The city manager shall be authorized to enter into repayment agreements under this chapter. Such agreements shall be recorded in the office of the Maricopa County Recorder.
(d) Any improvements constructed pursuant to sections 23-21—23-31 of this code shall not be subject to repayment agreements under this chapter in addition to assessments pursuant to sections 23-21—23-31.
(e) Those portions of special public improvements constructed under this chapter which are for general public benefit shall not be subject to repayment under the provisions of this chapter.
(Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
Peoria, Ariz., City Code § 23-36 Public Improvement Repayments; Repayment agreements; terms; collections; and costs.
Sec. 23-36. Public Improvement Repayments; Repayment agreements; terms; collections; and costs.
(a) The repayment agreement shall designate the parcels and persons who are entitled to reimbursement amounts and shall include a diagram of the properties and respective amounts from which reimbursement amounts may be collected. In the event bonds of the city, including improvement district or assessment bonds, have been issued to finance the construction of the special public improvements and related facilities, the city shall receive all reimbursement amounts and apply such amounts to the debt service funds of the applicable bond issue.
(b) The repayment agreement shall set forth the total of the reimbursement amount to be paid to the city, which agrees to repay such reimbursement amounts to the owner. The total of such reimbursement amounts shall not exceed that portion of the agreed construction costs of the special public improvement allotted to property outside the area of the owner. The repayment agreement shall terminate in ten (10) years or when the total amount provided for by this chapter is repaid, whichever is earlier.
(c) The approved construction costs as described in section 23-32 will be used for calculation of all reimbursement amounts.
(d) Upon entry into a repayment agreement with the city, the owner shall have the right to connect into the special public improvement in consideration for their entry into the repayment agreement.
(e) The field engineering, plans and specifications required for a special public improvement shall be prepared by the developer and approved by the city prior to construction. The engineering costs for preparation of plans and staking of the special public improvements on the property which are incurred by the owner may be included as determined by the city in the agreed construction costs as provided in this section. The city will perform the inspections during construction.
(f) The city shall have sole and exclusive control of connections to the special public improvement. Connections to the special public improvement may only be made upon issuance of a written permit from the city. It shall be unlawful to make a connection to a special public improvement without a permit. Such connections may be removed by the city and the costs of removal assessed to the party making the connection.
(g) Prior to the inspection and acceptance of the special public improvement by the city, all reimbursement amounts due by a owner for repayment of the benefit which their property received from the special public improvement shall be paid to the city.
(h) An annual charge will be assessed by the city for the administration of each repayment agreement. The annual charge shall be calculated based on actual cost incurred by the city for the administration of the agreement, however, the annual charge shall not be less than five hundred dollars ($500.00) Per year.
(i) Any owner may assign the benefits arising out of any reimbursement agreement with the city. Such assignments shall not relieve the owner from their duties and obligations under the agreement. The assignment shall require written approval of the city.
(Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
Peoria, Ariz., City Code § 23-37 Public Improvement Repayments; Reimbursement amounts payable to city.
Sec. 23-37. Public Improvement Repayments; Reimbursement amounts payable to city.
(a) When a special public improvement is constructed by the city or its contractors to provide service or benefit to a parcel of an owner, which owner or their predecessors in interest did not pay for any of the costs of the special public improvement, the city may impose and collect a reimbursement amount. The reimbursement amount shall be based on the benefitted parcel's share of the benefit received as compared to the total cost of the special public improvement. The reimbursement amount shall be paid to the city prior to the issuance of a building permit or the issuance of an encroachment permit to access city right-of-way for the purpose of connecting to the special public improvement.
(b) It shall be unlawful for any person to extend service from a special public improvement to their property for which a reimbursement amount has been imposed without first paying the reimbursement amount and obtaining a permit issued by the engineering division.
(c) The repayment obligation under this section shall terminate in ten (10) years or when the total amount provided for by this chapter is repaid, whichever is sooner.
(d) The city shall collect reimbursement amounts for any special public improvements financed by improvement district or assessment district bonds, water utility funds, sewer utility funds, development fee funds and general obligation bond funds which were specifically designated as subject to reimbursement from special public improvement repayments. Any owner who has paid all or part of the debt service upon any bonds, the proceeds of which were used to finance special public improvements shall have no claim to the reimbursement amounts repaid to the city under this chapter.
(e) Those portions of special public improvements constructed under this chapter which are for general public benefit shall not be subject to repayment under the provisions of this chapter.
(Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
Peoria, Ariz., City Code § 23-38 Public Improvement Repayments; Notice of Intention to Approve Special Public Improvements.
Sec. 23-38. Public Improvement Repayments; Notice of Intention to Approve Special Public Improvements.
(a) Upon the determination of the Engineering Director or designee that the public health, safety, welfare and convenience requires the construction of special public improvements prior to the development of the adjacent property but for which the adjacent property will be specially benefited, a map establishing the boundaries of the zone and indicating the amount of charges for special public improvements on each parcel shall be prepared by the Engineering Director and filed in the office of the city clerk. The map for the special public improvement shall contain:
(1) A description of the special public improvement.
(2) A general description of the estimated total cost and cost per frontage foot or cost per acre of the proposed special public improvement.
(3) A description of the special public improvement project area and a map and list of all owners of real property who will be receiving a special benefit from the construction of the special public improvement.
(4) A determination of that portion of the special public improvement which is for general public benefit and that portion which is for special benefit of the owner.
(5) A preliminary estimate of the portion of the special public improvement which will be financed with general obligation bonds, special assessments or improvement district assessments and the portion which will be financed with repayments for special public improvements.
(b) Those owners of real property within the area subject to repayment for special public improvements shall receive notice in writing of the proposed charges for special public improvements.
(c) The map for the special public improvement (inclusive of parcel numbers) shall be recorded with the Maricopa County Recorder concurrently with the owners of the real property within the area subject to repayment for special public improvements receiving written notice of the proposed charges for special public improvements.
(Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2); Ord. No. 05-50, 9/6/05 Repealed and reenacted (SUPP 2005-3))
Peoria, Ariz., City Code § 23-39 Public Improvement Repayments; Assessment districts, improvement districts; general obligation bond projects; cost apportionment.
Sec. 23-39. Public Improvement Repayments; Assessment districts, improvement districts; general obligation bond projects; cost apportionment.
(a) Upon collection of reimbursement amounts pursuant to any special public improvement ordered under section 23-38, which is located in a municipal improvement district and financed by assessments, such funds shall be deposited with the director of management services. The funds shall be applied against the outstanding indebtedness for which improvement district bonds were issued.
(b) Reimbursements for special public improvements pursuant to section 23-38 may be used in combination with a general obligation bond issue, provided that the general obligation bond issue question submitted to the qualified electors indicates that such reimbursements may be required of benefited property owners. All amounts collected from such reimbursements shall be deposited in the general obligation bond fund from which the special public improvement project is financed.
(Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
State law reference(s)—A.R.S. § 48-571.
Peoria, Ariz., City Code § 23-40 Sidewalks; duty to maintain sidewalks, streets and alleys; abatement; penalties.
Sec. 23-40. Sidewalks; duty to maintain sidewalks, streets and alleys; abatement; penalties.
(a) The owner or the lessee of any lot or parcel abutting upon any sidewalk now or hereafter constructed in the City shall keep and maintain such sidewalk in good repair in such a manner as to permit pedestrian use and access.
(b) The owner, lessee or other person in control of any land abutting a sidewalk, alley or street shall maintain such sidewalk, alley or street on which such land abuts in a clean condition in such a manner as to be free from:
(1) Litter, garbage, debris, rubble.
(2) Insect and rodent infestation.
(3) Overgrown vegetation, dead trees, brush and weeds.
(4) Other conditions that present a health, fire or safety hazard.
(c) Areas required to be maintained pursuant to this section are as follows:
(1) Any portion of a street, which has been opened for public use, between the curb line and the abutting property line including sidewalks; provided that the owner, lessee or other person in control of any land utilized for single-family or multi-family dwelling(s) shall be required to only maintain areas not within major arterial, minor arterial streets and those collector streets designated by the director of public works or his designee, as shown on the city's comprehensive plan.
(2) One-half of the width of abutting alleys from the property line to the center line of the alley.
(3) Any portion of a street that has not been dedicated to the City, accepted by the City Council and established as a public roadway in the manner provided by this Chapter, shall be maintained by those persons who dedicated the street or their successors in interest; provided that if the abutting land on either side of such street is owned by different person and each person has an obligation to maintain the street hereunder, then the owner, lessee or other person in control of the land shall only be required to maintain one half of the width of the street abutting their land.
(d) Any person who fails to comply with the provisions of this section is subject to one of the following sanctions or penalty. It is the city's sole election on the sanction or penalty that it may seek to impose.
(1) The owner, lessee or other person in control of abutting land in violation of this section may be subject to a civil sanction of not less than fifty ($50.00) dollars nor more than two thousand five hundred ($2,500.00) dollars.
(2) Failure to comply with the provisions of this section shall be unlawful and is deemed to be a class one misdemeanor.
(e) Jurisdiction of all proceedings to enforce the provisions of this section shall be in the Municipal Court of the City of Peoria before a civil hearing officer or a municipal judge. the city attorney may enforce and prosecute actions under this section.
(Ord. No. 90-57, 11/13/90; Ord. No. 92-03, 2/11/92, Renumbered; Ord. No. 97-38, 7/15/97, Enacted)
Peoria, Ariz., City Code § 23-41 Sidewalks; Liability of abutting property owners for defects.
Sec. 23-41. Sidewalks; Liability of abutting property owners for defects.
Any owner of any lot or parcel of land abutting on any sidewalk of the City who fails to keep the same in repair shall be liable for any damage on account of any injury that may be occasioned by reason of the defective condition or failure to repair any sidewalk within the City.
(Ord. No. 97-38, 7/15/97, Repealed; Ord. No. 97-38, 7/15/97, New section enacted)
Peoria, Ariz., City Code § 23-42 Sidewalks; damage during construction.
Sec. 23-42. Sidewalks; damage during construction.
If damage to sidewalks is found after the construction of a new structure, no authorization for permanent power to such property will be given until the damage is repaired. Security for such repairs shall be given in the same form as required under the provisions of the Subdivision Regulations, Chapter 24 of the Peoria City Code (1992) as it may be in effect at such time as the security required hereunder is given.
(Code 1977, § 17-2-2; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
Peoria, Ariz., City Code § 23-43 Sidewalks; Repair by property owner - Generally.
Sec. 23-43. Sidewalks; Repair by property owner - Generally.
(a) If the Engineering Director or designee, after due inspection, finds that any sidewalks adjacent to any buildings or grounds are not in good repair because of damages caused by the owner and/or occupant or by their contractors, the Engineering Director shall notify in writing the owner and/or occupant of the buildings or grounds to which the sidewalks are adjacent that such sidewalks are not in good repair from damage other than normal deterioration and the sidewalk reaching the end of its useful life. The director of public works shall specify therein what needs to be done to place them in good repair. Such notice shall be deemed given when mailed to the occupant or owner of the property at the address of such building or grounds and to the owner of the building or grounds at the address last shown on the records of the assessor for the county, first class U.S. mail, postage prepaid.
(b) If an owner or occupant fails to complete the repairs to the sidewalk adjacent to the building or grounds occupied or owned by him or filed an appeal within sixty (60) days after such notice is mailed by the Engineering Director, the owner and/or occupant shall be deemed in default of his obligation to keep such sidewalks in good repair.
(c) In those cases where the sidewalk has deteriorated due to normal wear and tear and has in the judgment of the Engineering Director or designee reached the end of its useful life, the city shall identify such sidewalks and include replacement at city expense of such sidewalks in the annual capital improvement program to be presented to the city council.
(Code 1977, §§ 17-2-3, 17-2-4; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-44 Sidewalks; failure to repair.
Sec. 23-44. Sidewalks; failure to repair.
(a) Upon default by the occupant and/or owner of the building or grounds to which the sidewalk is adjacent to perform his obligations under section 23-43:
(1) The city may make the needed repairs to the sidewalk at the expense of the owner and/or occupant and recover such costs, together with an administrative charge of fifteen percent, from the said owner or occupant together with city's fees and costs in collecting the same, including its reasonable attorney's fees.
(2) The Engineering Director may file a notice of lien on behalf of the city with the recorder's office in the county for the costs incurred by the city to repair such sidewalk. The lien shall constitute a lien against the property for a period of ten (10) years from the date the last of such costs are paid or earlier payment by the owner or occupant whichever occurs first. The lien shall not have priority over any mortgage or deed of trust against the subject building or grounds which has been duly recorded prior to the recording of the lien.
(3) The owner or occupant shall be guilty of an offense.
(b) All of the remedies in subsection (a) of this section are cumulative and separate and distinct remedies or penalties available to the city. The fact that the city avails itself of any one (1) of them does not prohibit the city from asserting any other remedy or penalty.
(Code 1977, § 17-2-5; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-45 Sidewalks; appeals.
Sec. 23-45. Sidewalks; appeals.
Any person who has a duty to repair a sidewalk shall have the right to file an appeal to the city manager by filing a written application with the city manager specifying why it would be inequitable for him to bear the cost of maintenance or repair. Upon receipt of this written appeal, the city manager or his designee shall investigate and decide the matter.
(Code 1977, § 17-2-6; Ord. No. 97-38, 7/15/97, Repealed and reenacted)
Peoria, Ariz., City Code § 23-46 Sidewalks; construction.
Sec. 23-46. Sidewalks; construction.
(a) The proprietor of any block, lot or part of a lot within the City of Peoria, Arizona shall construct a sidewalk in front thereof upon written request of the Engineering Director or his designee of a width, line and grade approved by the Engineering Director or designee using generally accepted engineering standards and conforming to sidewalks already constructed within the City of Peoria, Arizona and in accordance with the specifications for such work approved and adopted by the city and any standards and guidelines promulgated under this chapter.
(b) Upon failure of the proprietor to commence construction of the sidewalk within 60 calendar days after written notice to the proprietor from the Engineering Director or designee mailed in the United States Mail, postage prepaid, and addressed to the proprietor at the last address listed as shown on the tax records in the Maricopa County Assessor's Office for the block, parcel or lot in front of which the sidewalk is to be located, the City may proceed to construct such sidewalk. If the City constructs the sidewalk, the expense of constructing the sidewalk and any related expenses shall be assessed against the block, lot or parcel thereof for which the sidewalk is required. The City Council, shall at the time of the assessment is made, by ordinance and after notice to the proprietor order the recording of the assessment and determine the manner of collecting the assessment.
(Code 1977, §§ 17-1-2, 17-1-3; Ord. No. 90-57, 11/13/90 Renumbered from Section 23-24 to 23-20; Ord. No. 97-38, 7/15/97, Repealed and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-47 Sidewalks; specifications.
Sec. 23-47. Sidewalks; specifications.
(a) It shall be unlawful for any person, whether owner, contractor or otherwise to lay or cause to be laid any sidewalk on any public street or alley unless such sidewalk shall be laid according to the plans for such work as approved by the city and in accordance with the specifications approved by the city and such standards and guidelines promulgated under this chapter and under permit and inspection by the city.
(b) Notwithstanding subsection (a) of this section a party who has constructed a sidewalk that is under warranty to the city may replace damaged or broken sections of the warrantied sidewalk in accordance with the previously approved plans and specifications.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-50 Standard specifications for public works.
Sec. 23-50. Standard specifications for public works.
(a) The Uniform Standard Specifications for Public Works Construction from the Maricopa Association of Governments, as amended are adopted by reference. Three copies of the Uniform Standard Specifications for Public Works and their adopted amendments shall be on file with the city clerk, city attorney and engineering department respectively for public inspection.
(b) The transportation element of the Peoria Comprehensive Master Plan, as amended shall be adopted as additional standard specifications for public improvement projects. Three copies of the Comprehensive Master Plan shall be on file with the city clerk, city attorney and engineering department respectively for public inspection.
(c) The City Manager or his designee may promulgate standards and guidelines for interpretation of standard specifications. Three copies of the standards and guidelines shall be on file with the city clerk, city attorney and engineering department respectively for public inspection.
(Code 1977, §§ 8-5-1; Ord. No. 97-38, 7/15/97, renumbered from Sec. 5-5 and reenacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Charter reference(s)—Adoption by reference, art. VII, § 14.
State law reference(s)—Adoption by reference, A.R.S. § 9-801 et seq.
Peoria, Ariz., City Code § 23-51 Construction; public works; permit required.
Sec. 23-51. Construction; public works; permit required.
(a) It shall be unlawful for any person to make, build, construct or remove any pavement or pavement widening, driveway, sidewalk, curb, gutter, pipe line, except pipe lines provided for in the plumbing code, or grade, oil or gravel any public street of the City, without having first received a written permit from the city and the plans having been approved by the City. Work completed in violation of this section shall be subject to investigative and remediation fees set forth by the City in Chapter 2 of this Code.
(b) Notwithstanding subsection (a) of this section, for any pavement or pavement widening, driveway, sidewalk, curb, gutter that is under warranty and has not received final acceptance, repairs may be made by the original party constructing the improvements or their successors in interest in accordance with the plans and specifications approved by the Engineering Director or designee.
(c) The City may enforce this section by the imposition of civil penalties. For each violation of this section a civil penalty may be imposed of not less than two hundred dollars nor more than two thousand, five hundred dollars.
(Ord. No. 97-38, 7/15/97, repealed and renumbered to Sec. 23-69; Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-52 Construction; permit application; fees.
Sec. 23-52. Construction; permit application; fees.
(a) All applications to the city for a permit to construct driveways, streets, sidewalks, curbs, gutters, traffic signals, street lights, traffic signs, pipe lines, to widen the paved roadway, to cut pavement, sidewalks, curbs, gutter or to repave pavement cuts, shall be in writing on a form promulgated by the city and shall be accompanied by at least one copy of a plot plan showing the size of the property, the location with reference to lot and street lines of existing proposed buildings, driveways, curbs, sidewalks, trees, poles or other objects that might affect the work.
(1) The application shall include a Traffic Control Plan that shall identify whether Traffic Control will be necessary by police assistants or certified peace officers and shall be submitted to the Police Department for review. Any individual providing traffic control in a City of Peoria right-of-way, street, road, parkway or easement shall be clearly identified in the uniform of a law enforcement officer. The application shall indicate if reserve or posse officers are proposed to be used. The Police Department may prohibit the use of reserve or posse personnel on any project. Violations of this prohibition shall result in immediate revocation of the permit by the City. This provision shall be included in each permit issued by the City.
(b) All applications shall include a permit and plan review fee to cover the city's cost of plan review, inspection and issuing the permit. The fee shall be in the amount set forth in Chapter 2 of this code. No part of the permit and plan review fee shall be refundable.
(Ord. No. 97-38, 7/15/97, repealed and renumbered to Sec. 23-70; Ord. No. 97-38, 7/15/97, enacted; Ord. No. 09-38, 10/20/09, amended (SUPP 2009-4))
Peoria, Ariz., City Code § 23-53 Construction; financial assurance.
Sec. 23-53. Construction; financial assurance.
(a) The city shall require each applicant referred to in this Chapter, before granting a permit under section 23-52 to deposit with the city a financial assurance equal to the cost of the work proposed in the application, as determined by the Engineering Director or his designee. The financial assurance shall constitute a guarantee that the work shall be done in accordance with the permit and the city specifications, standards and guidelines. The applicant shall be given a receipt for the financial assurance.
(b) If a surety bond is posted, it shall be executed by the applicant as principal, with a corporation duly authorized to transact surety business in the State of Arizona. The bond shall be in favor of the City, shall be continuous in form and shall be conditioned that the total aggregate liability of the surety for all claims shall be limited to the fact amount of the bond, irrespective of the number of years the bond is in force. The bond shall be released upon satisfactory performance and acceptance of the work, or may be cancelled after the applicant has provided other security satisfactory to the city that will cover obligations that remain.
(c) If the Engineering Director determines that the amount of financial assurance required is less than five hundred dollars, the requirement for financial assurance may be waived.
(d) This bond or financial assurance shall not be required where the improvements and the cost of work proposed in the application are also covered by the provisions of the Peoria Subdivision Regulations, Chapter 24 of the Peoria City Code (1992).
(Ord. No. 97-38, 7/15/97, repealed and renumbered to Sec. 23-71; Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-54 Construction; pavement cuts.
Sec. 23-54. Construction; pavement cuts.
(a) Any public service corporation as defined in A.R.S. Title 40, and any holder of a Telecommunications license or franchise from the city shall be permitted to pay the city on a monthly basis the amount billed for city inspection, review and plan review services provided to public service corporations and telecommunications licensees due to construction activities in the public right-of-way during the prior month. The amount shall be due within thirty days of the date of the billing and if unpaid shall accrue interest from the due date at the rate of 1½ percent per month, not to exceed eighteen percent per annum. A public service corporation or telecommunications licensee shall have the right during regular business hours upon reasonable notice to examine and make copies of the city's records pertaining to costs for inspection, review and plan review services.
(b) The city finds and determines that pavement cuts cause early deterioration of streets and imposes the following surcharge fees to cover damages and early deterioration. These surcharge fees are assessed in addition to the regular permit fees and are over and above any special backfill, compaction and pavement replacement stipulations that may be imposed as a condition of permitting. All surcharge fees shall be deposited in the city's street fund.
(1) Cuts in new paving less than 12 months old. Openings less than 9 square feet or 9 linear feet of trench - $1,000.00 surcharge. Trenches over 9 feet long - $2,500.00 surcharge for every 50 feet or fraction thereof.
(2) For pavement 12 to 24 months old, Openings less than 9 square feet or 9 linear feet of trench - $750.00 surcharge. Trenches over 9 feet long - $1,875.00 for every 50 feet or fraction thereof.
(3) For pavement 24 to 36 months old, Openings less than 9 square feet or 9 linear feet of trench - $375.00 surcharge. Trenches over 9 feet long - $935.00 for every 50 feet or fraction thereof.
(c) The pavement cut surcharge fee may be waived by the City Manager or his designee upon a finding by a preponderance of the evidence that all of the following conditions have been met:
(1) The pavement cut is not the result of improper planning or a lack of diligence on the part of the applicant.
(2) The pavement cut could not have been made prior to the installation of new paving.
(3) The cut can not be avoided by routing the line in a different manner or taking any other action.
(d) For those streets that have been subject to pavement maintenance within the last three years, the applicant shall provide the same type of maintenance on the half street where the cut is made for a distance of 50 feet from each end of the pavement cut.
(e) For all other streets, the applicant shall provide the same type of maintenance on the half street where the cut is made for a distance of 50 feet from each end of the pavement cut.
(Ord. No. 97-38, 7/15/97, repealed and renumbered to Sec. 23-72; Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-55 Right of City to repair street cuts.
Sec. 23-55. Right of City to repair street cuts.
If an applicant for a pavement cut has unsatisfactorily repaired one or move pavement cuts in the determination of the Engineering Director or designee, the City may condition the issuance of a permit to make a pavement cut upon the City repairing the pavement cut. In the event the city repairs the pavement cut, the city will charge the pavement cut surcharge, the city's estimated repair fee and an administrative charge of 15% of the estimated repair fee. In the event final construction cost is less than the estimated repair fee, the difference of the fee and the difference of the administrative charge shall be refunded.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2)
Peoria, Ariz., City Code § 23-56 Duty of person to repair street.
Sec. 23-56. Duty of person to repair street.
It shall be the duty of every person working in the public right-of-way who causes any damage to the public street to repair the street in accordance with city standards, specifications and guidelines, under city permit, review and inspection and in such manner that it is returned as nearly as practicable to its original condition and maintain the repair for a period of time of not less than one year after repairing the street.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-57 Street name; regulatory and warning sign installation fee.
Sec. 23-57. Street name; regulatory and warning sign installation fee.
The city may charge an applicant at the time of requesting a permit a sign installation fee to cover the cost of installing street name, regulatory and warning signs in an amount provided by Chapter 2 of this code.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-58 Construction; permits; qualifications of applicant.
Sec. 23-58. Construction; permits; qualifications of applicant.
(a) Applicants for permits may be either an owner or a contractor. If the improvement to be constructed under the permit is not to become the property of the city and if the applicant is someone other than the owner, the owner shall also sign the permit form, indicating that they agree to the conditions of the permit.
(b) It shall be unlawful to perform construction work in the public right-of-way, except as permitted under this section. The work under a permit issued by the city may be performed only by:
(1) Licensed Contractors;
(2) Public Service Corporations and Telecommunication Licensees;
(3) Governmental agencies; or
(4) Resident owner of residential property where the property owner proposes to do work between his property line and the back curb line, with the exception of sidewalk unless approved by the Engineering Director or designee
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-59 Driveways; rules and regulations.
Sec. 23-59. Driveways; rules and regulations.
(a) The city manager or his designee may authorize vehicular access to private property from streets and alleys in accordance with this section. Such access will be granted only upon due consideration of pedestrian and vehicle safety, the resulting interference with the movement of vehicular traffic, interference with existing public improvements, unreasonable interference with the rights of the public in the adjacent street and alley and whether other access exists to the private property. The city manager or his designee may limit vehicular access to right entry and right exit. Vehicular access to private property may be prohibited on designated parkways, except at designated access points.
(b) It shall be unlawful to construct a curb cut or driveway crossing for vehicular access to private property except as permitted by the city.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-60 Driveways; construction standards.
Sec. 23-60. Driveways; construction standards.
(a) The city shall not plan new capital improvement construction or issue a permit for private development construction unless all of the following requirements are complied with.
(1) The required plans for construction of a driveway or curb cut have been approved by the Engineering Director or designee.
(2) The spacing standards as required in Table D.3-7 of the Peoria Comprehensive Master Plan are complied with.
(3) The standards and guidelines promulgated by the Engineering Department are complied with.
(b) On any driveway to be constructed into a vacant lot, a site plan shall first be filed and approved by the City showing the proposed use of the land. Such plan shall show the location of future building or buildings, the parking plan and driveway locations and their widths.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2)
Peoria, Ariz., City Code § 23-61 Variances from driveway and alley standards.
Sec. 23-61. Variances from driveway and alley standards.
(a) The city manager or his designee is authorized to grant variances from the provisions of this chapter prescribing construction design standards for driveways and alleys, alley access requirements to private development projects and construction design standards for driveways, and alleys and alley access requirements as to capital improvement projects. An applicant for a variance shall file a written application showing that undue and extreme hardship would result from:
(1) Unusual conditions specific to the property, or
(2) Literal enforcement of the provisions of this chapter.
(b) Applications for variances shall be decided within 30 days of the date of filing or within such longer period of time agreed upon by the applicant and city. The decision of the city manager or his designee shall be final.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-62 Compliance with standard details and specifications.
Sec. 23-62. Compliance with standard details and specifications.
All work done under permits granted by authority of this chapter shall be completed within the time set by the city manager or his designee and shall be done in accordance with the official grades, specifications, standards and guidelines of the city.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-63 Restoration of street pavement, curb, gutter and sidewalk.
Sec. 23-63. Restoration of street pavement, curb, gutter and sidewalk.
When the improvements on or the use of property which is served by an access on the a public street, is so changed that the access, in the opinion of the City Manager or his designee is no longer needed, the owner of the property shall be notified to restore the street pavement, curb, gutter, sidewalk and landscaping to the same condition as the adjoining street pavement, curb, gutter, sidewalk and landscaping as provided in this section. Shall the owner fail to comply within ninety days after receipt of such notice, the City shall proceed to make the repairs and shall bill the cost, together with an administrative charge of fifteen percent to the owner. Shall the owner fail to pay, the City Manager or his designee may add the amount as a charge to the utility bill and treat the charge in the same manner as other utility charges or may record a lien in the office of the Maricopa County Recorder, or both.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-64 Liability of persons repairing street for defective repair.
Sec. 23-64. Liability of persons repairing street for defective repair.
(a) Any person who fails, neglects or refuses to repair or maintain the repair to a public street as required this chapter shall be given a written notice from the City Manager or designee to repair the public street. Such notice shall contain a brief statement of the violation and the name, address and phone number of a city representative who may be contacted for further information. The notice shall further inform such persons that failure to comply with the notice within the stated time will cause the City to perform the work and that all charges, plus a fifteen percent administrative fee will be billed to the person.
(b) The Engineering Director or designee shall have the authority to determine the date of completion of the initial repair and whether or not the repair has been satisfactorily maintained for a period of one year. In determining whether or not a repair has been satisfactorily maintained, the Engineering Director shall apply normal engineering practices for the type of street in question and such other applicable specifications, standards and guidelines as adopted by the City.
(c) When any persons to whom notice has been given, fails, neglects or refuses to repair or maintain the public street by the date set for compliance within the notice, the Engineering Director or Designee shall repair or maintain the public street and do such other action as necessary to abate the failure to repair the public street. Upon completion of the work, the person who was given notice and failed to repair or maintain the public street within the time period set in the notice shall pay the city its entire cost, including design, engineering and incidentals, together with a fifteen percent administrative charge. The City Manager or his designee shall bill the cost and administrative charges. Shall the owner fail to pay, the City Manager or his designee may add the amount as a charge to the utility bill and treat the charge in the same manner as other utility charges or may record a lien in the office of the Maricopa County Recorder, or both.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-65 Revocable Permits; authorization to issue.
Sec. 23-65. Revocable Permits; authorization to issue.
(a) The Engineering Director or his designee is authorized to assess non-refundable fees for plan review and inspection services and issue revocable right-of-way permits to persons, associations or corporations, for the purpose of temporarily making use of the public rights-of- way for "minor" encroachments within said public right-of-way. Minor encroachments are herein defined as those underground facilities whose cross sectional areas are less than two feet across; and those encroachments whose surface and aerial uses are easily removed from the right-of-way as determined by the Engineering Director.
Revocable right-of-way permits require submittal of an application together with the required number of complete construction plans (i.e., drawing, details, notes, etc.). Upon City receipt of the application and plans, the City will perform a technical review. Upon completion of the technical review, either a permit will be issued to the applicant or the application will be returned for addition modifications. If additional modifications or corrections are required, the applicant will be notified and must resubmit the application and plans after the required changes have been made.
(b) Plan review fees are due and will be collected at the time of the submittal of the application and submittal of the required number of plans or the utility company may be billed as determined by the City. Revocable right-of-way permit fees are due and will be collected at the time of the issuance of the permit. Revocable right-of-way permits shall not be charged where there is a valid franchise or license and the franchise and license fees are in lieu of the payment of permit fees.
(c) Revocable permits authorized pursuant to this section shall be subject to the following stipulations:
(1) Property zoning regulations are not to be violated; rather the intent of the zoning regulation is to be applied to uses in the public right-of-way.
(2) City codes are not to be violated unless permitted by law or variance.
(3) All minimum street right-of-ways have been dedicated to the public.
(4) The proposed use of the public right-of-way does not conflict with existing or proposed uses of the right-of-way.
(5) Right-of-way selected for federal funding must be clear of all encroachments.
(6) The use of the right-of-way will be further restricted by general and special conditions as determined upon review by the Engineering Director or designee.
(7) The revocable right-of-way permit will contain standard and special conditions and terms and will be kept on file in the Engineering Department.
(d) All revocable right-of-way permits authorized herein shall be evidenced by a separate written revocable right-of-way permit, that permit shall be subject to the general and special conditions as determined necessary by the Engineering Director or designee.
(e) The Engineering Director or designee may require special conditions deemed necessary due to a particular type of encroachment or otherwise necessary to control use of the public right- of-way.
(f) Applicants for revocable permits (with the exception of persons, associations or corporations with a valid franchise or license and the franchise and license fees are in lieu of the payment of permit fees) shall pay all application fees and permit fees required by this code and shall secure all permits necessary to build their project.
(g) Revocable right-of-way permits authorized by the Engineering Director or designee are subject to revocation at any time in the discretion of the Engineering Director. Appeals may be made to the City Manager in the manner provided by section 23-80 of this code.
(h) If a revocable right-of-way permit project has not been completed prior to the permit expiration date, the applicant shall pay a renewal fee as established in Table 27-7 before resuming work or continuing work.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2); Ord. No. 2016-04, § 1, 3-15-16)
Peoria, Ariz., City Code § 23-66 Revocable permits; application fee.
Sec. 23-66. Revocable permits; application fee.
(a) The applicant shall pay an application fee for processing a revocable right-of-way permit for the use of the dedicated public right-of-way, as set for in chapter 2 of this code.
(b) Annual use fees shall be required for revocable right-of -way permits issued for all uses of public right-of-way except for:
(1) Governmental branches/agencies;
(2) Private sewer lines;
(3) Minor treatments to building facades
(c) The use fee shall be set forth in chapter 2 of the City Code.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-67 Revocable permits; modification or waiver of fee.
Sec. 23-67. Revocable permits; modification or waiver of fee.
The fees established herein may be waived or reduced by the City Manager or his designee to the extent that a benefit occurs to the City due to the encroachment.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-68 Revocable permits; failure to pay.
Sec. 23-68. Revocable permits; failure to pay.
All revocable right-of-way permits are issued subject to the payment of the annual use fee, except where waived as provided by this chapter. Failure to pay the use fee shall result in the automatic termination of the revocable permit.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-69 Street lighting; requirements.
Sec. 23-69. Street lighting; requirements.
(a) All residential and commercial developments require the installation and energizing of street lighting on public streets within and adjacent to the project in accordance with standards established pursuant to this section.
(b) The City Manager or his designee shall promulgate written standards for the intensity of street lighting, acceptable fixtures and poles, acceptable locations, installation practices and such other related matters as the city manager or his designee determine to be appropriate.
(Ord. No. 96-15, 2/20/96, Enacted as Sec. 23-51; Ord. No. 97-38, 7/15/97, Repealed and renumbered from Sec. 23-51)
Peoria, Ariz., City Code § 23-70 Street lighting system, electric utility companies, standards.
Sec. 23-70. Street lighting system, electric utility companies, standards.
(a) The City of Peoria is serviced by two electric utility companies; Arizona Public Service Company and the Salt River Project. Different standards for installation and design apply in each service area.
(1) Arizona Public Service Company (APS) Service Area - This area includes that portion of the City of Peoria in which APS has been granted a certificate of convenience and necessity to provide electric utility service by the Arizona Corporation Commission (ACC). The street lighting in this area shall be designed by the owner's engineer and the plans submitted to the City for review and approval. The City may impose a charge on the owner for each review and approval of the plans. Upon approval of the plans by the City, the street lighting system shall be installed by APS. The developer shall pay the design and installation costs directly to APS. The street lighting system will be inspected by the city and/or APS prior to final plat approval. If the City determines that the street lighting system meets city standards, the street lighting system will be dedicated to the City in conjunction with the final plat approval. Ownership of the street lighting system will be conveyed to the city by dedication on the final plat, which upon recording with the Maricopa County Recorder shall constitute acceptance of the dedication by the City. If the project is not a subdivision, ownership of the street lighting system shall be conveyed to the city by an instrument acceptable to the City Attorney and recorded in the office of the Maricopa County Recorder.
(2) Salt River Project (SRP) Service Area - This includes that portion of the City of Peoria in which the Salt River Agricultural and Power Improvement District in furtherance of its water delivery functions provides electric utility service. The street lighting in this area shall be designed and installed by SRP. The developer shall pay the design, installation and energizing costs charged by SRP to the developer to the City of Peoria and these costs will then be forwarded to SRP.
(Ord. No. 96-15, 2/20/96, Enacted as Sec. 23-52; Ord. No. 97-38, 7/15/97, Repealed and renumbered from Sec. 23-52)
Peoria, Ariz., City Code § 23-71 Street lighting systems: design, plans, installation and dedications.
Sec. 23-71. Street lighting systems: design, plans, installation and dedications.
(a) Developers of residential and commercial property located within the Arizona Public Service (APS) Utility Service Area are responsible for all design, installation, plan review and approval and energizing costs of street lighting on public streets within their project and all adjacent minor and major arterial fronting their project and upon which the project has an access point.
(1) If a developer of a residential or commercial property contends that the requirement to install street lighting adjacent to their site is excessive, an appeal may be filed in writing with the City Manager or his designee. The determination of the City Manager or his designee upon the appeal shall be final.
(b) The design, plans and installation shall be in accordance with the standards established by the City and the applicable utility service provider.
(c) The developer shall retain a Professional Engineer registered in the State of Arizona, to prepare the lighting system design and appropriate calculations relative to illumination levels. Illumination design shall follow the recommendations of the American National Standard Practice for Roadway Lighting, Illuminating Engineering Society of North America, and City of Peoria street lighting standards.
(Ord. No. 96-15, 2/20/96, Enacted as Sec. 23-53; Ord. No. 97-38, 7/15/97, Repealed and renumbered from Sec. 23-53)
Peoria, Ariz., City Code § 23-72 Streetlight improvement districts.
Sec. 23-72. Streetlight improvement districts.
(a) The cost of the electricity, operation and maintenance of the street lighting system shall be assessed by the city against the owners of the real property as follows:
(1) Within a residential subdivision, the cost of the electricity, operation and maintenance of all street lights on streets within the subdivision, excepting major arterial, minor arterial and collector streets shall be charged to the property owner(s) through creation of a street light improvement district. The developer shall initiate the formation of the street light improvement district prior to the final plat approval by executing a petition for formation of a street light improvement district in a form acceptable to the City Attorney.
(2) Within a commercial subdivision, the cost of the electricity, operation and maintenance of all street lights on streets within the subdivision, including major arterial, minor arterial and collector streets on which access is provided to the commercial subdivision shall be charged to the property owner through creation of a street light improvement district. The developer shall initiate the formation of the street light improvement district prior to the final plat approval by executing a petition for formation of a street light improvement district in a form acceptable to the City Attorney.
(3) The City shall require each party dedicating the street lights to the City to warranty the street lights against defects in design, installation and operation for a two year period commencing on the date of dedication. Normal wear and tear arising from the operation of the street lights shall be excepted from the warranty requirement.
(4) For any other property, the cost of the electricity, operation and maintenance of all street lights fronting the property or on any street for which access is provided to the property may be charged to the property owner at the discretion of the city.
(b) Any owner of real property upon presentation of a petition signed by a majority of the owners of real property within the area may request that the city install additional street lights. Upon review of the petition by the city, a public hearing shall be held upon the request, following the public hearing, upon presentation of a petition for formation of a street light improvement district in a form acceptable to the city attorney, the city council may commence improvement district proceedings to form a street light improvement district and to assess the cost of the electricity, operation and maintenance of additional street lights against the property within the street light improvement district.
(Ord. No. 96-15, 2/20/96, Enacted as Sec. 23-54; Ord. No. 97-38, 7/15/97, Repealed and renumbered from Sec. 23-54)
State law reference(s)—A.R.S. § 48-572, et seq.
Peoria, Ariz., City Code § 23-73 Easements; reservation; extinguishment.
Sec. 23-73. Easements; reservation; extinguishment.
(a) Right-of-way or easements of existing sewer, water, gas or similar pipelines and appurtenances, telecommunications facilities and for canals, laterals, or ditches and appurtenances and for elect and similar lines and appurtenances shall continue as they existed prior to the abandonment thereof, unless extinguished as provided by this section.
(b) If the city owns no title to a roadway, but holds right-of-way easements, only, such easements may be extinguished by the City Council's resolution. If facilities of any other political subdivision, public service corporation or telecommunications licensee are located within a city easement, the easement shall only be extinguished upon the written consent of such political subdivision, public service corporation or telecommunications licensee.
(Ord. No. 97-38, 7/15/97, enacted)
Peoria, Ariz., City Code § 23-74 Easements; rights-of-way on Federal Patent Lands; applications; fees.
Sec. 23-74. Easements; rights-of-way on Federal Patent Lands; applications; fees.
(a) Any person, including the city may file an application for abandonment of the city's interest for roadways and city utility easements on federal patent land rights-of-way. The City Manager or his designee shall promulgate an application form for this purpose and an application fee shall be charged as provided in Chapter 2 of this code, unless the application is filed by the City.
(b) The City Engineer shall review and act on the application. If the City determines that the right-of-way or easement granted by the Federal Patent is no longer needed for city use, The Engineering Director may recommend to the City Manager or his designee the execution of a disclaimer of the city's interest. The decision of the City Manager or his designee shall be final.
(c) The City may condition the execution of a disclaimer of the city's interest upon the dedication of other rights-of-way by the applicant necessary for public roadway and/or public utility purposes. Such exchanges shall be authorized by resolution of the Council providing for acceptance of the new dedication and authorizing the execution of the disclaimer.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-75 Parking Lots; Unpaved Roads; Vacant Lots; definitions; minimum standards; dust control, notice.
Sec. 23-75. Parking Lots; Unpaved Roads; Vacant Lots; definitions; minimum standards; dust control, notice.
(a) For purposes of Sections 23-75 through 23-78 of this code the following terms shall have the following meanings:
(1) Disturbed Surfaces shall mean any portion of the earth's surface, or materials placed thereon, which has been physically moved, uncovered, destabilized or otherwise modified from its undisturbed natural condition, thereby increasing the potential for emission of fugitive dust.
(2) Driveway shall mean a facility for ingress and egress from a parcel or property to a public or private street.
(3) Chemical/Organic Stabilizer shall mean any non-toxic chemical or organic dust suppressant other than water that meets any specifications, criteria, or tests required by any federal, state, or City agency and is not prohibited for use by any applicable law, rule or regulation.
(4) Dust Control shall mean an environmentally safe dust palliative approved by the Engineering Director or designee for control of the release of particulate matter. Dust Control shall include a schedule for the application of the dust palliative approved by the Engineering Director or designee.
(5) Dust Suppressants shall mean water, hygroscopic materials, solution of water and chemical surfactant, foam, or non-toxic chemical/organic stabilizers not prohibited for use by any applicable law, rule or regulation, as a treatment material to reduce fugitive dust emissions.
(6) Fugitive Dust shall mean the powdery earth the particulate matter entrained in the ambient/surrounding air, which is caused from man-made and natural activities such as, but not limited to, movement of soil, vehicles, equipment, blasting, and wind.
(7) Gravel shall mean the application of a rock product approved by the Engineering Director for designated low vehicular use Parking Lots as determined by the City.
(8) Lot shall mean a parcel of land separated from every other piece or parcel by description and identified on a final parcel map recorded in the Maricopa County Recorder's office.
(9) Low Use Unpaved Parking Lot shall mean a lot on which vehicles are parked no more than thirty-five (35) days a year, excluding days where the exemption in paragraph (e) of this section applies.
(10) Motor Vehicle shall mean an automotive vehicle, self-propelled for use on the public roads and highways of the State of Arizona and required to be registered under the Arizona State Uniform Motor Vehicle Act, including any non-motorized attachments, such as, but not limited to trailers or other conveyances which are connected to or propelled by the actual motorized portion of the vehicle.
(11) Off-Road Motor Vehicle shall mean any wheeled vehicle that is used off paved roadways including, but not limited to motor cycles or motor-driven cycles, sand or dune buggies, or all terrain vehicles.
(12) Owners/operators shall mean any person who owns, leases, operates, controls, maintains or supervises a fugitive dust source subject to the requirements of this section.
(13) Non-Attainment Area shall mean those portions of the City of Peoria that are within an area designated by the United States Environmental Protection Agency as being a Non- Attainment Area for air quality standards (as defined in 40 CFR 81.303).
(14) Parking Lots shall mean an area provided by the owner, lessee or operator of a non- residential property, including churches, schools and public buildings and facilities to be used for the parking of motor vehicles used to bring invitees, licensees, patrons or users to the non- residential property.
(15) Paving shall mean the application of concrete, asphaltic concrete, asphalt or some other petroleum or rock based application resulting in a permanent surface.
(16) Private Streets shall mean those roadways providing access to the general public for one or more parcels of property and which are not accepted for maintenance by the City or other governmental entity.
(17) Public Streets shall mean those roadways providing access to the general public for one or more parcels of property and which are designated public streets on approved city street classification maps or have been accepted by the city for maintenance for inclusion in the city street system.
(18) Stabilized Surface/Surface Stabilizer shall mean a surface, which has been treated with an environmentally safe chemical or gravel, periodically maintained to regulate/control the release of particulate matter in accordance with this code and approved by the Engineering Director or designee.
(19) Unpaved Parking Lot shall mean an area provided by the owner or lessee or operator of a privately or publicly owned area utilized for parking of motor vehicles that is not paved and is not a low use unpaved parking lot.
(20) Unpaved Roads shall mean any road/street, equipment path or driveway that is not paved that is open for public access and owned/operated by any federal, state, county, municipal or other governmental or quasi-governmental agencies.
(21) Vacant Lots shall mean a tract, lot or parcel of improved or unimproved land, residential, industrial, institutional, governmental or commercial that contains no approved or permitted buildings or structures of a temporary or permanent nature.
(b) Within thirty days after the effective date of this Ordinance, the City Clerk shall post in all designated posting locations of the city and shall publish in the official newspaper of the city, Notice of the Passage of this Ordinance and where copies of the full text may be obtained.
(c) All owners/operators of an unpaved parking lot shall stabilize the surface area(s) of the lot on which vehicles enter and park by implementing one of the following measures after first obtaining approval of the Engineering Director or designee:
(1) Pave; or
(2) Apply chemical/organic stabilizers in sufficient concentration and frequency to maintain a stabilized surface; or
(3) Apply and maintain surface gravel uniformly to stabilize the surface.
(d) The surface of parking lots used no more than thirty-five (35) days a year, shall be stabilized on any days when over one hundred (100) vehicles enter the lot, such that the surface area(s) on which vehicles enter and park is/are stabilized throughout the duration of time that vehicles are parked.
(e) Parking Lots that are less than five thousand (5,000) square feet or are low usage (ten (10) or fewer cars per day) are exempt from paragraph (c) of this section.
(f) From and after June 10, 2000, all owners/operators of existing unpaved roads with average daily trips of 250 vehicles or more (as determined by the Institute of Transportation Engineers Trip Generation Report (6th edition, 1997 as amended) or tube counts) which cross the surface during a twenty-four (24) hour time period, shall stabilize the entire surface area of the road or road segment which is located within the Phoenix Non-Attainment Area by implementing one of the following measures:
(1) Pave; or
(2) Apply chemical/organic stabilizers in sufficient concentration and frequency to maintain a stabilized surface; or
(3) Apply and maintain surface gravel uniformly to stabilize the surface.
(g) No owner, occupant, tenant or person shall construct, open or create a Private Street/Road within any portion of the City that is within a Non-Attainment Area without posting at each junction with a public roadway sign in conformance with the Uniform Arizona Manual on Traffic Control Devices indicating a speed limit of 15 miles per hour. The Engineering Director or designee may sell speed limit signs to owner, occupant, tenant or person at 125% of the City's cost.
(h) All owners/operators of an urban or suburban open area vacant lot of which any portion has a disturbed surface within any portion of the City (a Non-Attainment Area) which remain(s) unoccupied, unused, vacant or undeveloped for more than fifteen (15) calendar days shall implement one of the following measures by June 10, 2000, or within sixty (60) calendar days following the disturbance, whichever is later:
(1) Revegetate, establish ground cover vegetation on all of the disturbed surface in a sufficient quantity to maintain a stabilized surface; or
(2) Apply water or chemical/organic stabilizers (a dust suppressant(s)), to all the disturbed surface areas in a sufficient quantity and frequency to maintain a stabilized surface; or
(3) Restore to a natural state (i.e. as existing in or produced by nature without cultivation or article influence in such manner that all disturbed surface areas are stabilized; or
(4) Apply gravel uniformly to the surface and maintain the gravel surface such that all disturbed surface areas are stabilized.
(i) All vacant lots with less than 0.5 acre (21,780 square feet) of disturbed surface are exempt from paragraph (h) of this section.
(j) All owners/operators of a urban or suburban open area vacant lot with any portion having a disturbed surface due to motor vehicle (trespass) or off-road motor vehicle use, shall at all times implement one of the following by June 10, 2000, or within sixty (60) calendar days following a disturbance, whichever is later:
(1) Maintaining the premises from being used by motor vehicle and off-road vehicular traffic as roadway or to cut through to bypass existing roadways by placing fencing, trees, barriers or other effective measures to prevent vehicle access; or
(2) The installation of signage acceptable to the Engineering Director and the closure of existing ingresses and egresses from the property on to the public roadway; or
(3) Apply gravel or chemical/organic stabilizers uniformly to the surface and maintain the gravel surface or chemical stabilizers such that all disturbed surface areas are stabilized.
(k) All vacant lots of 5,000 square feet or less with disturbed surface due to motor vehicle (trespass) or off-road motor vehicle use may be exempt from paragraph (j) of this section.
(l) All owners/operators that are subject to the provisions of this section shall compile and keep all records that provide evidence of adherence to the requirements of this section, including the type of treatment or measure, the extent of coverage and the date(s) applied, vendor name (if applicable) and the method, frequency, concentration and quality of application. Copies of the aforementioned records and dust control plans along with supporting documentation shall be retained for at least three (3) years.
(Ord. No. 97-38, 7/15/97, section reserved; Ord. No. 98-20, 4/7/98, enacted; Ord. No. 00-14, 3/7/00, amended entire section (SUPP 2000-1); Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-76 Parking Lots; Unpaved Roads; Vacant Lots; particulate reduction; nuisance, abatement.
Sec. 23-76. Parking Lots; Unpaved Roads; Vacant Lots; particulate reduction; nuisance, abatement.
(a) From and after June 10, 2000, the existence of any Parking Lot, Unpaved Road or Vacant Lot within any portion of the City that is within a Non-Attainment Area that is not paved in compliance with Section 23-75 or been approved by the Engineering Director or designee for use of an alternative dust control or gravel particulate reducing measure is deemed to be a public nuisance subject to abatement pursuant to Article I, Section 3 (14) of the Peoria City Charter.
(b) The unlawful maintenance of a Parking Lot, Unpaved Road or Vacant Lot in violation of Section 23-75 is declared to be a nuisance. The City Attorney, on behalf of the City or any person affected by the nuisance, may bring a civil action in the municipal court to abate the nuisance and to enforce or recover penalties for violations thereof.
(c) It shall be unlawful for any owner or person in control of any parcel or property to permit or continue to permit the parcel or property to be used as a parking lot, unpaved road, vacant lot with a disturbed surface area or vacant lot with a disturbed surface area due to vehicle trespass without compliance with the provisions of Section 23-75. If the Engineering Director or designee determines that such parcel of property is being used without compliance with the provisions of Section 23-75, the City may order the property owner to install signs indicating that parking is prohibited, install such barriers as approved by the Engineering Director or designee to prevent access to any public or private Street, and or apply a surface stabilizer (i.e. pave or apply an alternative dust control or gravel particulate reducing measure). It shall be unlawful for any person to refuse to comply with an order issued by the City under this section, however the issuance of such an order may be appealed in the manner provided by Sections 23-82 through 23-83 of this code.
(Ord. No. 97-38, 7/15/97, section reserved; Ord. No. 98-20, 4/7/98, enacted; Ord. No. 00-14, 3/7/00, Amended (SUPP 2000-1); Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-77 Parking Lots; Driveways; Private Streets; violations; penalties.
Sec. 23-77. Parking Lots; Driveways; Private Streets; violations; penalties.
(a) The city shall enforce the provisions of this chapter by the imposition of civil sanctions. Civil sanctions may not exceed the maximum amount of fine for a class one misdemeanor. If an alleged violator is served with a notice of civil violation pursuant to this chapter, he shall not be subject to a criminal charge arising out of the same facts.
(b) Civil sanctions shall be enforced as provided in chapter 5 of this code.
(c) Any person who violates section 23-75 shall be responsible for a civil violation and shall be subject to a civil penalty of not less than Two Hundred and Fifty ($250.00) Dollars for the first offense and Five Hundred ($500.00) Dollars for the second and subsequent offense.
(d) Each day any violation of the provisions of section 23-75 or the failure to perform any act or duty required by section 23-75 is a separate violation.
(e) In addition to any other relief provided by this section, the city attorney may apply to a court of competent jurisdiction for an injunction to prohibit the continuation of any violation of this ordinance. Such application for relief may include seeking a temporary restraining order, temporary injunction and permanent injunction.
(f) Nothing in this section shall prohibit the City from exercising its remedies pursuant to section 23-76(b).
(Ord. No. 97-38, 7/15/97, section reserved; Ord. No. 98-20, 4/7/98, enacted; Ord. No. 00-14, 3/7/00, Amended (c) and (d) (SUPP 2000-1))
Peoria, Ariz., City Code § 23-78 Parking Lots; Unpaved Roads; Vacant Lots; withholding of permits; approvals; utility services.
Sec. 23-78. Parking Lots; Unpaved Roads; Vacant Lots; withholding of permits; approvals; utility services.
(a) From and after June 10, 2000, any parcel or property located within any portion of the City that is within a Non-Attainment Area in which a Parking Lot, Unpaved Road or Vacant Lot is not paved or been approved by the Engineering Director or designee for use of a surface stabilizer alternative dust control or gravel particulate reducing measures, shall not be rezoned without a condition of such rezoning being to bring the Parking Lot, Unpaved Road or Vacant Lot into compliance with Section 23-75.
(b) The City shall not approve any minor land division, site plan, final plat or issue any building permit, grading permit or any other type of development permit for any parcel or property located within any portion of the City that is within a Non-Attainment Area that is not paved or been approved by the Engineering Director or designee for use of a surface stabilizer alternative dust control or gravel particulate reducing measures, without a condition of such approval or permit issuance being that the Parking Lot, Unpaved Road or Vacant Lot be brought into compliance with Section 23-75.
(c) The City shall not permit any connection to the municipal water distribution system or the municipal wastewater collection system from any parcel or property located within any portion of the City that is within a Non-Attainment Area that is not paved or been approved by the Engineering Director or designee for use of a surface stabilizer alternative dust control or gravel particulate reducing measures without a condition of such connection being that the Parking Lot, Unpaved Road or Vacant Lot be brought into compliance with Section 23-75.
(Ord. No. 97-38, 7/15/97, section reserved; Ord. No. 98-20, 4/7/98, enacted; Ord. No. 00-14, 3/7/00, amended (SUPP 2000-1); Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2)
Peoria, Ariz., City Code § 23-79 Reserved. (Ord. No. 98-20, 4/7/98, renumbered to Section 23-82; Ord. No. 98-20, 4/7/98, enacted; Ord. No. 00-14, 3/7/00, repealed and reserved (SUPP 2000-1))
Peoria, Ariz., City Code § 23-80 Reserved. (Ord. No. 98-20, 4/7/98, renumbered to Section 23-83; Ord. No. 98-20, 4/7/98, enacted; Ord. No. 00-14, 3/7/00, repealed and reserved (SUPP 2000-1))
Peoria, Ariz., City Code § 23-81 Reserved. (Ord. No. 97-38, 7/15/97, section reserved; Ord. No. 98-20, 4/7/98, enacted; Ord. No. 00-14, 3/7/00, repealed and reserved (SUPP 2000-1))
Peoria, Ariz., City Code § 23-82 Streets and Utilities; dedication and improvement requirements.
Sec. 23-82. Streets and Utilities; dedication and improvement requirements.
The following street and utility requirements apply:
(a) A zoning compliance certificate shall not be issued for any lot or parcel which abuts any existing or future street and/or utility right-of-way and/or easement unless the one-half of such abutting right-of-way that is located on the same side of the center of the street as such lot or parcel of land has been dedicated and improved, or installation of improvements have been assured in a manner satisfactory to the City Manager or his designee.
(b) No building permit shall be issued for new construction or for enlargement of existing structures greater than one hundred percent of the existing floor space on any existing lot or parcel of land, which abuts any existing or future street and/or utility right-of-way and/or easement unless the one-half of such abutting right-of-way that is located on the same side of the center of the street as such lot or parcel of land has been dedicated and improved, or installation of improvements have been assured in a manner satisfactory to the City Manager or his designee.
(c) A zoning compliance certificate shall not be issued for any lot or parcel of land for which access to the public sewer system or water supply is available, unless such property is connected to the public sewer system and/or water supply system. Available shall be as defined in this code or as by Maricopa County. In the event of a conflict with definitions between the city and the county, the most restrictive definition shall apply.
(d) The means of wastewater disposal and water supply on lots and parcels for which access to the public sewer system and/or water supply system is not available shall be indicated on the plot plan or site plan submitted to the City and shall be approved by Maricopa County. In the event of a conflict with definitions between the city and the county, the most restrictive definition shall apply.
(e) Improvements and assurances of construction shall be as required by this chapter or by the subdivision regulations, currently, Chapter 24 of the Peoria City Code (1992).
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 98-20, 4/7/98, renumbered from Section 23-82)
Peoria, Ariz., City Code § 23-83 Appeals and Modifications; streets and utilities; dedication and improvement requirements.
Sec. 23-83. Appeals and Modifications; streets and utilities; dedication and improvement requirements.
(a) A decision under section 23-79 of this code shall be appealed to the City Manager or his designee. The party appealing must demonstrate the existence of extraordinary conditions of topography, land ownership, adjacent development, hardship unique to the property in question, or other circumstances not provided for in this chapter. The City Manager or his designee shall issue a written finding and may modify the requirements of this chapter to such extent that they deem appropriate in the public interest.
(b) In modifying the requirements of this Chapter, the City Manager or his designee may make such additional requirements as appear necessary to secure the objectives of the requirements so modified.
(c) The Engineering Director may modify the requirements of the Chapter upon finding extraordinary conditions of topography, land ownership, adjacent development, hardship unique to the property in question, or other circumstances not provided for in this chapter. The Engineering Director shall provide the modification in writing and may modify the requirements of this chapter to such extent that they deem appropriate in the public interest.
(Ord. No. 97-38, 7/15/97, enacted; Ord. No. 98-20, 4/7/98, renumbered from Section 23-80; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-89 Telecommunications; Wireless communication equipment in the right-of-way.
Sec. 23-89. Telecommunications; Wireless communication equipment in the right-of-way.
The City shall allow and charge a wireless provider and other communications service providers a rate and/or fee for the use of the City's right-of-way for the construction, installation, maintenance, modification, operation or replacement of a utility pole in the right-of-way or the collocation of a small wireless facility in the right-of-way.
For the purpose of this Section, the following words, terms and phrases shall have the following meaning ascribed to them, except where the context clearly indicates a different meaning:
Collocate or collocation means to install, mount, maintain, modify, operate or replace wireless facilities on, within or adjacent to a wireless support structure or utility pole.
Communications service provider means a cable operator, a provider of information service as defined in 47 United States Code § 153 (24), a telecommunications carrier as defined in 47 United States Code § 153(51) or a wireless services provider.
Fee means a one-time charge.
Rate means a recurring charge.
Right-of-way means the area on, below or above a public roadway, highway, street, sidewalk, alley or utility easement within the jurisdiction of the City of Peoria. Right-of-way does not include a federal interstate highway or state highway or state route under the jurisdiction of the department of transportation, a private easement, property owned by a special taxing district, or a utility easement that does not authorize the deployment sought by the wireless provider.
Small wireless facility means a wireless facility that meets both of the following:
(i) All antennas are located inside an enclosure of not more than six (6) cubic feet in volume or, in the case of an antenna that has exposed elements, the antenna and all of the antenna's exposed elements could fit within an imaginary enclosure of not more than six (6) cubic feet in volume.
(ii) All other wireless equipment associated with the facility is cumulatively not more than twenty-eight (28) cubic feet in volume, or fifty (50) cubic feet in volume if the equipment was ground mounted before June 31, 2017. The following types of associated ancillary equipment are not included in the calculation of equipment volume:
• An electric meter.
• Concealment elements.
• A telecommunications demarcation box.
• Grounding Equipment.
• A power transfer switch.
• A cutoff switch.
• Vertical cable runs for the connection of power and other services.
Utility pole means a pole or similar structure that is used in whole or in part for communications services, electric distribution, lighting or traffic signals. Utility pole does not include a monopole.
Wireless facility means:
(a) Equipment at a fixed location that enables wireless communications between user equipment and a communications network, including both of the following:
(i) Equipment associated with wireless communications.
(ii) Radio transceivers, antennas, coaxial or fiber-optic cables, regular and backup power supplies and comparable equipment, regardless of technological configuration.
(b) Includes small wireless facilities.
(c) Does not include the structure or improvements on, under or within which the equipment is collocated, wireline backhaul facilities, coaxial or fiber-optic cable that is between wireless support structures or utility poles or coaxial or fiber-optic cable that is otherwise not immediately adjacent to, or directly associated with, an antenna.
(d) Does not include wi-fi radio equipment described in A.R.S. § 9-506 (i) or microcell equipment described in A.R.S. § 9-84(E).
Wireless services means any services that are provided to the public and that use licensed or unlicensed spectrum, whether at a fixed location or mobile, using wireless facilities.
The fees for wireless communication equipment in the right-of-way are found on Table 27-7 of the City Code.
Each wireless provider desiring to use the City's right-of-way for the construction, installation, maintenance, modification, operation or replacement of a utility pole associated with the collocation of a small wireless facility shall have a fully executed Notice of Antenna Site Standard Terms & Conditions document before submitting plans and specifications for a proposed site.
The City Engineer or designee is authorized to execute the Notice of Antenna Site Standard Terms & Conditions on behalf of the City and to authorize minor deviations thereto upon a showing of good cause.
(Ord. No. 2016-05, § 1, 2-16-16; Ord. No. 2017-39, § 1, 8-15-17; Ord. No. 2018-01, § 1, 1-19-18)
Peoria, Ariz., City Code § 23-90 Telecommunications; license, revocable permit or franchise required; proposal.
Sec. 23-90. Telecommunications; license, revocable permit or franchise required; proposal.
(a) No Telecommunications Corporation shall install, maintain, construct or operate telecommunications facilities in Public Highway of the City, or provide telecommunications service by means of such facilities installed, maintained or constructed in the city's rights-of-way, unless a license to use the highways to provide telecommunications services, has first been granted by the city under the charter or code, a revocable permit issued in accordance with this code or a franchise awarded by the electors pursuant to the Arizona Constitution and the city charter to such telecommunications corporation.
(b) Any license, revocable permit or franchise awarded, granted or issued to a telecommunications corporation shall not be exclusive.
(c) Any person desiring a license, revocable permit or franchise proposal to occupy the streets and other rights-of-way of the city to provide telecommunications services shall file an application with the Engineering Director in the form prescribed by the City and shall pay a filing fee as set forth in this code.
(d) Notwithstanding subsection (a), any telecommunications corporation that was providing telecommunications service within the State of Arizona as of October 31,1997 pursuant to a grant made to it or its lawful predecessors prior to the effective date of the Constitution of the State of Arizona, may continue to provide telecommunications services pursuant to that state grant, until and unless the state grant is lawfully repealed, revoked or amended, and need not obtain any further grant from the city to provide telecommunication services; provided, however, that such telecommunications corporation must in all other respects comply with the requirements applicable to telecommunications corporations as provided in A.R.S. Title 9, Chapter 5, Article 7.
(e) A franchise, license or revocable permit to any telecommunications corporation to use the highways to install, maintain, construct or operate telecommunications facilities or to provide telecommunications services under this chapter shall not authorize the use of the highways to provide any other service; nor shall the issuance of the same invalidate any franchise, license or permit that authorizes the use of the highways for such other services; nor shall the fact that a telecommunications corporation holds a franchise, license or permit to make any other use of the highway or to provide any other service, authorize installation, maintenance, construction or operation of telecommunications facilities in any highway in the city, or permit such telecommunications corporation to provide telecommunications services by means of such facilities without obtaining a license or franchise hereunder.
(f) Nothing in this ordinance shall be deemed to affect the terms or conditions of any franchise, license or permit issued by the City prior to the effective date of the amendments of this ordinance or to release any party from its obligations thereunder. Those franchises, licenses or permits shall remain fully enforceable in accordance with their terms. The City Manager, with the consent of the City Council, may enter into agreements with franchise holders, licensees or permittees to modify or terminate an existing franchise, license or agreement.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, amended (SUPP. 1999-1); Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
State law reference(s)—Grant of Franchise, A.R.S. § 9-501.
Peoria, Ariz., City Code § 23-91 Telecommunications; revocable permits; authorized.
Sec. 23-91. Telecommunications; revocable permits; authorized.
(a) The Engineering Director may issue revocable permits as provided by Sec. 23-65 of this code for Telecommunication providers that meet the standards of Chapter 23. Such licenses shall provide for quarterly payments to the city of a right-of-way occupancy fee for each lineal foot of installation on the basis for fair market value and cost as determined by the public works director and adjusted periodically at the City's discretion.
(b) A revocable permit for a telecommunications facility may provide for:
(1) Wireless telecommunication facilities such as antennas;
(2) Transmitting traffic license for the purpose of providing telecommunications service where no sale or exchange of service originates in the city.
(3) Interstate Fiber-Optic Facilities, where such facilities do not exceed ten lineal miles in total length of installation and connect only to interstate telecommunication carrier points of presence, and to not other connection within the city.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
State law reference(s)—A.R.S. § 9-561 et seq.
Peoria, Ariz., City Code § 23-92 Telecommunications; rights-of-way; definitions.
Sec. 23-92. Telecommunications; rights-of-way; definitions.
For the purposes of this chapter, unless the context otherwise requires, the following terms, phrases, words, and their derivatives shall have the meanings given herein. When not inconsistent with the context, words used in the present tense include the future, words in the plural number include the singular number, and words in the singular number include the plural number. The word "shall" is mandatory, and "may" is permissive.
Cable Services and Cable System shall have the same meaning as defined in Chapter 19 of the Peoria City Code (1992).
Commercial Mobile Radio Services means two-way voice commercial mobile radio services as defined by the federal communications commission in 47 United States Code Section 157.
Facilities means the plant, equipment, and property, used in the provision of telecommunications services and not owned by the City, including but not limited to poles, wires, pipe, conduits, pedestals, antenna, and other appurtenances placed in, on, or under public highways
Person includes any individual, partnership, association, corporation, legal entity or organization of any kind. Whenever used in any clause prescribing a penalty, the term "person" as applied to partnerships or associations includes partners or members thereof, and if applied to corporations, the officers thereof.
Provider means a telecommunications corporation who constructs, installs, operates or maintains telecommunications facilities in the City public highways.
Public Highway or Highway means all roads, streets and alleys and all other dedicated public rights-of-way and public utility easements of the City.
Rights-of-Way shall have the same meaning as public highway or highway.
Telecommunications means the transmissions between or among points specified by the user, of information of the user's choosing, without change in the form or content of the information as sent and received. The term does not include commercial mobile radio services, pay phone services, interstate services or cable services provided by a cable system.
Telecommunications Corporation means any public service corporation to the extent that it provides telecommunications services in the state of Arizona.
Telecommunications Services means the offering of telecommunications for a fee directly to the public, or to such users as to be effectively available directly to the public, regardless of the facilities used.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, amended (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-93 Telecommunications, coverage; exemptions.
Sec. 23-93. Telecommunications, coverage; exemptions.
(a) Any public agency, other than the City, providing telecommunications services using any public highway in the City shall obtain the applicable license, revocable permit or enter into an intergovernmental agreement as provided in A.R.S. §§ 11-951 to 11-954. Nothing in this ordinance shall be construed to require the city to obtain a license or revocable permit under any circumstances for use of its own rights-of-way.
(b) A cable franchise or license shall not be treated as a telecommunication service license, franchise, or permit.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, amended (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-94 Telecommunications corporations; compensation.
Sec. 23-94. Telecommunications corporations; compensation.
(a) The city shall not levy a tax, rent, fee or charge to a telecommunications corporation for the use of a public highway to provide telecommunications services, or levy a tax, fee or charge upon the privilege of engaging in the business of providing telecommunications services, except that, in connection with its provisions of telecommunications services and its use of the highways to provide the same, each telecommunications corporation shall:
(1) Pay a transaction privilege tax on the business of providing telecommunications services or applicable use tax, as may be specified from time to time in Chapter 12 of the Peoria City Code (1992).
(2) Pay public highway construction permit fees established from time to time by the City.
(3) Pay all reasonable costs associated with the construction, maintenance and operation of its facilities in the public highways used to provide telecommunications services, including reasonable costs associated with damage caused to the public highways.
(b) The Engineering Department is authorized to review the costs associated with construction, maintenance and operation of facilities in the public highways to provide telecommunications services, to establish any fee required to recover those costs, and to provide for changes to fees established in the manner provided by this code.
(c) Nothing in this section is intended to limit the obligation of any person to pay amounts owed under any franchise or license provided that, for franchises or licenses issued after the effective date of this ordinance, payments required under such franchise or license for the provision of telecommunications services shall comply with the provisions of A.R.S. § 9-581.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, amended (SUPP. 1999-1); Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-95 Telecommunications; rights-of-way; rights reserved to City.
Sec. 23-95. Telecommunications; rights-of-way; rights reserved to City.
Without limitation upon the rights which the city might otherwise have, the city does hereby expressly reserve the following rights, powers and authorities:
(a) To exercise its governmental powers now or hereafter to the full extent that such powers may be vested in or granted to the city.
(b) To determine any question of fact relating to the meaning, terms obligations, or other aspects of this ordinance and the permit.
(c) To grant multiple, nonexclusive licenses, franchises or permits within the city to other persons for the operation of telecommunication systems.
(Ord. No. 97-115, 12/9/97, enacted)
State law reference(s)—A.R.S. § 9-276.A.(1), (2)
Peoria, Ariz., City Code § 23-96 Telecommunication corporations licenses; length.
Sec. 23-96. Telecommunication corporations licenses; length.
Any license granted by the City to a telecommunications corporation pursuant to this chapter shall commence upon adoption of the license and acceptance of the license by the provider within thirty (30) days of the grant. The license shall be effective for a period determined by the City Council, but not to exceed five (5) years, and subject to the conditions and restrictions provided in the instrument and this chapter.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, amended (SUPP. 1991-1)
Peoria, Ariz., City Code § 23-97 Telecommunications; License or Franchise application.
Sec. 23-97. Telecommunications; License or Franchise application.
(a) Any telecommunications corporation desiring a license or franchise under this chapter to occupy the highways of the City to provide telecommunications service shall file an application with the City Manager requesting at the applicant's election either a franchise or license, in the form prescribed by the city manager, and shall pay a filing fee determined by the City Manager that recovers all reasonably related costs directly incurred by the city to process the application. The amount of the filing fee can be appealed to the city manager or his designee.
(b) Each application shall (i) show where the facilities the applicant will use will be located, or contain such other information as the city may deem necessary in order to ensure that the applicant will comply with requirements for use of and location of facilities in the highways; (ii) identify the applicant, its name, address and telephone number, (iii) describe the services to be provided; and (iv) describe any agreement with any other entity that permits such entity to use the facilities.
(c) Upon receiving an application for a franchise or license that satisfies the conditions of section (b), the City shall promptly proffer a telecommunications franchise or license to the applicant for its review, and may inquire into matters relevant to the issuance of the license or franchise. If the applicant agrees to the terms and conditions of the franchise or license, and otherwise satisfies the conditions set forth herein, the request shall be submitted to City Council with a recommendation for approval (in the case of a license) or scheduled for a franchise election (in the case of an application for a franchise). notwithstanding the foregoing, the City need not issue or renew a license, or schedule a franchise election if the applicant has previously had its telecommunications services license or franchise revoked, or for any other reason permitted under Arizona law.
(d) As a condition of issuing or renewing a license or franchise to use the public highways to provide telecommunications services, the city may require:
(1) Proof that the applicant has received a certificate of public convenience and necessity from the Arizona Corporation Commission;
(2) The applicant to agree to comply with highway use requirements that the City may establish from time to time;
(3) The applicant to agree to provide and maintain accurate maps showing the location of all its facilities and the facilities it will use in the highways within the City, and to comply with such other mapping requirements as the City may establish from time to time;
(4) The applicant to obtain the insurance, and provide proof of insurance as required by the City; to post the performance bonds and security fund required by the city; and to agree to fully indemnify the City, its officers, agents, boards and commissions, in a form satisfactory to the City; and to agree that it shall have no recourse whatsoever against the City or its officials, boards, commissions, agents or employees for any loss, costs, expense or damages arising out of any provision or requirement of the City because of the enforcement of the license or franchise or because of defects in this chapter or the license or franchise issued;
(5) The applicant to agree to comply with and be bound by the administrative and enforcement provisions as may be prescribed from time to time by the City.
(e) Every franchise or license shall be subject to the following administrative and enforcement provisions:
(1) Franchises and licenses shall be personal to the franchisee or licensee. except as provided in the license or franchise, no transfer of a franchise, franchisee, licensor or licensee, or change of control over the same (including, but not limited to, transfer by forced or voluntary sale, merger, consolidation, receivership, or any other means) shall occur unless prior application is made to the City and the City's prior written consent is obtained, which consent will not be unreasonably withheld or delayed.
In making a determination as to whether to approve a transfer the City may consider the same information and qualifications required of an original application for a license or franchise; whether the licensee or franchisee is in compliance with its license or franchise and this chapter and, if not, the proposed transferee's commitment to cure such noncompliance; whether the transfer would result in an evasion of other applicable provisions of law, or impair lawful contracts; and the effect of the transfer on the City's interests.
No application for a transfer of a license or franchise shall be granted unless the proposed transferee agrees in writing that it will abide by and accept all terms of this chapter and the license or franchise, and that it will assume all obligations, liabilities, and responsibility for all acts and omissions, known and unknown, of the previous licensee or franchisee under this chapter and the license or franchise for all purposes, including renewal.
Approval by the City of a transfer of a license or franchise does not constitute a waiver or release of any of the rights of the City under this chapter or the franchise or license, whether arising before or after the date of the transfer.
(2) Every franchisee or licensee shall be subject to the City's exercise of such police, regulatory and other powers as it now has or may later obtain, and a franchise or license may not waive the application of the same.
(3) Every franchise or license shall be subject to revocation if the franchisee or licensee fails to comply with the material terms and conditions of the license or franchise, or applicable law. provided, however, that a franchise or license shall not be revoked unless the franchisee or licensee is given written notice of the defect in performance, and fails to cure the performance within 60 days of the notice, except where the City finds that the defect in performance is due to intentional misconduct, is a violation of criminal law, or is part of a pattern of violations where the franchisee or licensee has already had notice and opportunity to cure. A hearing before a city hearing officer designated to hold such hearings shall be held before a license is revoked, if the licensee requests a hearing.
(4) Penalties for violation of franchise or license.
(5) Damages for violation of the franchise or license terms. Any remedies available to the City are cumulative, and are not limited by the recovery of any amounts pursuant to the insurance provisions of the license or franchise, or pursuant to any indemnity clause.
(6) A requirement that if the franchisee or licensee fails to pay amounts owed to the city by the time prescribed for payment, the franchisee or licensee shall pay interest on the amounts owed, at the rate of 1% per month.
(7) A requirement that franchisee or licensee shall produce books and records for the City's inspection and copying, prepare reports, respond to questions and permit the city to have access to its facilities as the City may request in order to determine whether licensee or franchisee has complied with its obligations under the franchise or license, or other applicable law.
(f) A licensee that receives a telecommunications service license pursuant to this chapter may apply for a renewal of its license, which renewal shall be reviewed in accordance with the requirement of state law.
(g) The issuance of a license, permit or other authorization by the city is not a representation or warranty that such license, permit, or authorization is a legally sufficient substitute for a franchise, and it not a representation or warranty that a franchise is not required.
(Ord. No. 99-12, 3/16/99, enacted (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-100 Telecommunications; location and relocation of facilities in rights-of-way.
Sec. 23-100. Telecommunications; location and relocation of facilities in rights-of-way.
(a) Each provider is responsible for ensuring that its facilities are installed, constructed and maintained in strict accordance with city's adopted codes, subdivision regulations, guidelines and standards; that all required licenses, franchises, and other permits are applied for and obtained before any work commences; and that the terms and conditions thereof are strictly followed. Where a facility has more than one provider, each provider is fully responsible for ensuring that all requirements are satisfied. Facilities shall be installed, constructed and maintained so that no additional costs are imposed upon the city, and so that the facility does not interfere with other uses or users of the public rights-of-way. Without limiting the requirement of any other provision of the adopted codes, subdivision regulations, guidelines and standards, or the provisions of any license, permit or franchise issued by the city, this shall require, at a minimum, compliance with the provisions of this Chapter.
(b) The facilities to be constructed, installed, operated, and maintained by the provider shall be so located or relocated as to interfere as little as possible with traffic or other authorized uses over, under, or through the rights-of-way. Those phases of construction relating to traffic control, backfilling, compaction, and paving, as well as the location or relocation of said facilities shall be subject to regulation by the city manager or his designee as authorized by the city council of the city.
(c) The provider shall keep accurate installation records of the location of all facilities in the rights-of-way and furnish them to the city upon request or at such periodic intervals as the City may require. Upon completion of new or relocation construction of underground facilities in the rights-of-way, the provider shall provide the city, if requested or as required, with installation records in a format compatible with the current city mapping format showing the location of the underground and above round facilities.
(d) Whenever the provider shall cause any opening or alteration whatever to be made for any purpose in any rights-of-way, the work shall be completed within a reasonable time, and the provider shall, without expense to the city and upon the completion of such work, restore the property disturbed in a manner consistent with the city's duly adopted standards, or as required by its permits, licenses, revocable permits or franchises.
(e) The installation, use, and maintenance of the provider's facilities within the rights-of-way authorized herein shall be in such a manner as not to interfere with the city's placement, construction, use, and maintenance of its rights-of-way, street lighting, water pipes, drains, sewers, traffic signal systems, or other city systems that have been, or may be, installed, maintained, used or authorized by the city. Upon the city's request, provider's facilities will be relocated at provider's expense (unless state law expressly requires otherwise). Upon the city's request, by a time specified by the City. If the provider fails to move its facilities, the City may do so and will bill the provider the costs therefore. Further the provider shall reimburse the city any additional cost the city incurs due to the location or relocation of the provider's facilities, including all design and construction costs
(f) The provider shall not install, maintain, or use any of its facilities in such manner as to damage or interfere with facilities of another located within the rights-of-way of the city will relocate its facilities, if necessary, to accommodate another facilities relocation.
(g) All installation of facilities shall be installed per plans approved by the city. Provider may install facilities on existing utility poles or in existing conduit where permission is granted by owner of the utility pole or conduit, and such permission is verified by the city except where those same poles are scheduled to be replaced with buried facilities. No new poles, or longer poles, will be permitted in the rights-of-way for any new facilities. If provider installs facilities on existing poles as provided herein, the provider shall bury its facilities if such poles are removed and not replaced in kind for any reason. If the provider makes use of existing conduit of another provider, the provider shall be subject to the provisions of this chapter in the use of such conduit in the rights-of-way.
(h) Each provider must obtain and must prove that it has obtained such insurance, bonding, and security fund requirements as specified by the City, or if no specific requirements are specified, as are required by the city for similar facilities. No work shall commence unless these requirements have been satisfied, and the City may require the provider to remove or stop work on facilities or require a provider to cease using the facility, by where insurance, bonding and security fund requirements are not satisfied. A permit shall be obtained prior to removing, abandoning, relocating, or reconstructing, if necessary, any portion of a provider's facilities. Notwithstanding the foregoing, the city understands and acknowledges there may be instances when provider is required to make repairs, in compliance with federal or state laws, that are of an emergency nature. The provider will notify the city prior to such repairs, if practicable, and will obtain the necessary permits in a reasonable time after notification.
(i) A permit shall obtained from the Engineering Director prior to a provider removing, abandoning, relocating, or reconstructing, if necessary, any portion of a provider's facilities. Notwithstanding the foregoing, the city understands and acknowledges there may be instances when a provider is required to make repairs, in compliance with federal or state laws, that are of an emergency nature. The provider will notify the City prior to such repairs, if practicable and will obtain the necessary permits in a reasonable time after notification.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, renumbered from Section 23-97 (SUPP. 1999-1); Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))
Peoria, Ariz., City Code § 23-101 Telecommunications; conflict with city/town projects.
Sec. 23-101. Telecommunications; conflict with city/town projects.
(a) If, during the design process for public improvements, the city discovers a potential conflict with proposed construction, the provider shall either:
(1) Locate and, if necessary, expose its facilities in conflict,
(2) Use a location service under contract with the city to locate or expose its facilities. The provider shall reimburse the city for the cost resulting from the use of such location service. The city shall make reasonable efforts to design and construct projects pursuant to this section so as to avoid relocation expense to the provider. Provider will furnish the location information in a timely manner, but in no case longer than fourteen consecutive days.
(b) The city reserves the prior and superior right to lay, construct, erect, install, use, operate, repair, replace, remove, relocate, regrade, widen, realign, or maintain any rights-of-way, aerial, surface, or subsurface improvements, including, but not limited to, water mains, traffic control conduits, cable and devices, sanitary or storm sewers, subways, tunnels, bridges. viaducts, or any other public construction within the rights-of-way of the city.
(c) When the city invokes its prior superior right to the rights-of-way, the provider shall move its facilities located in the rights-of-way, at its own cost, to such a location as the city directs.
(d) If, during the course of a project, the city determines provider's facilities are in conflict, the following shall apply:
(1) Prior to city notice to proceed to contractor: The provider shall, within a reasonable time, but in no event exceeding six months, remove or relocate the conflicting facility. This time period shall begin running upon receipt by the provider of written notice from the city. However, if both the city and the provider agree, the time frame may be extended based on the requirements of the project.
(2) Subsequent to city notice to proceed to contractor: The City and the provider will immediately begin the coordination necessary to remove or relocate the facility. Actual construction of such removal or relocation is to begin no later than seventy-two hours, if practicable, after written notification from the city of the conflict.
(Ord. No. 99-12, 3/16/99, renumbered from Section 23-98 (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-102 Telecommunications; damage to city rights-of-way and facilities.
Sec. 23-102. Telecommunications; damage to city rights-of-way and facilities.
(a) If, in the installation, use, or maintenance of its facilities, the provider damages or disturbs the surface or subsurface of any rights-of-way or adjoining public property, or the public improvement located thereon, therein, or thereunder, the public property, or repair or replace the public improvement thereon, therein, or thereunder, in as good a condition as before such damage or disturbance. If such restoration, repair, or replacement of the surface, subsurface, or any structure located thereon, therein, or thereunder is not completed within a reasonable time, or such repair or replacement does not meet duly adopted standards, the city shall have the right to perform the necessary restoration, repair, or replacement, either through its own forces, or through a hired contractor, and the provider shall pay the city for its expenses in so doing within thirty days after its receipt of the invoice therefor.
(b) The provider shall reimburse the city/town for all costs arising from the reduction in the service life of any public road or pavement damage, to the extent required by any of city's adopted codes, subdivision regulations, guidelines and standards, resulting from pavement cuts of the provider. The provider shall pay such costs within thirty days from the date of issuance of an invoice from the city.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, renumbered from Section 23-99 (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-103 Telecommunications; relocation of facilities.
Sec. 23-103. Telecommunications; relocation of facilities.
(a) The city shall not bear any cost of relocation of existing facilities, irrespective of the function served, where the city facilities or other facilities occupying the rights-of-way under authority of a city permit, license, revocable permit or franchise which must be relocated, are already located in the rights-of-way and the conflict between the provider's potential facilities and existing facilities can only be resolved expeditiously as determined by the city by the movement of the existing city or other approved facilities.
(b) If provider's relocation effort so delays construction of a public project causing the city to be liable for delay damages, the provider shall reimburse the city for those damages attributable to the delay created by the provider. If the event the provider should dispute the amount of damages attributable to the provider, the matter shall be referred to the dispute resolution board. The dispute resolution board shall consist of one member selected by the city, one member selected by the provider, and a third person agreed upon by both parties. The person agreed upon by both parties shall be chairperson of the dispute resolution board. Expenses for the dispute resolution board shall be shared equally by the city and the provider. The board will hear the dispute promptly, and render an opinion as soon as possible, but in no case later than sixty days after notification by the city of provider's allocated share of damages suffered by the city. All decisions of the dispute. resolution board are non-binding on either the city or the provider, however, the findings of the dispute resolution board shall be admissible in any legal action. The city and the provider shall accept or reject findings of the dispute resolution board within thirty (30) days after receipt of the findings. If damages are assessed by the dispute resolution board, the provider shall pay the city within thirty (30) days. Late charges of five percent and interest charges of one and one-half percent per month shall be added for late payment.
(c) Except as otherwise provided in a license, franchise or permit or by other provision of law, the entire cost of relocation shall be borne by the city if the provider is required by the city to relocate facilities which are located in private easements obtained by the provider prior to the dedication of the public street or easement from which the facilities must be relocated. These prior rights of the provide would also be unaffected by any subsequent relocation. A prior rights as used in this subsection, means private easement rights obtained by the provider prior to the dedication of the streets or public ways from which the facilities are requested by the city to be relocated. In the case of a facility that serves multiple purposes, the prior rights must extend to all uses for this exception to application.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, renumbered from Section 23-100 (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-104 Telecommunications; rights reserved to city.
Sec. 23-104. Telecommunications; rights reserved to city.
Without limiting the rights that the City might otherwise have, the City does hereby expressly reserve the following rights, powers and authorities:
(a) To exercise its governmental powers now or hereafter to full extent that such powers may be vested in or granted to the City.
(b) To determine any question of fact relating to the meaning, terms, obligations, or other aspects of this chapter and the instruments issued under this chapter.
(c) To grant multiple, nonexclusive licenses, franchises, or permits within the City to other persons.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, renumbered from Section 23-101 (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-105 Telecommunications; city police power; continuing jurisdiction.
Sec. 23-105. Telecommunications; city police power; continuing jurisdiction.
(a) The provider shall at all times be subject to all lawful exercise of the police power by the city, including any and all adopted codes, subdivision regulations, guidelines and standards rules, or regulations which the city has adopted or may adopt, and all laws, rules, regulations, orders, and policies of the state and the United States government. In the event of a conflict between this ordinance and other provisions of the City Code, the stricter requirement shall apply.
(b) Continuing jurisdiction. The city shall have continuing jurisdiction and supervision over any facilities located within or on city rights-of-way. However, it is recognized that the daily administrative, supervisory, and enforcement responsibilities of the provisions of this article and the permit shall be delegated and entrusted to the city manager or his designee to interpret, administer, and enforce the provisions of this chapter, and to promulgate standards regarding the construction, reconstruction, relocation, maintenance, dismantling, abandonment, or use of the facilities within the city rights-of-way.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, renumbered from Section 23-102 (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-106 Telecommunications; compliance with provisions of this chapter; penalties.
Sec. 23-106. Telecommunications; compliance with provisions of this chapter; penalties.
(a) From and after the effective date of this chapter, it shall be unlawful for any provider to occupy the streets and public ways unless the provider is in compliance with the provisions of this chapter. This chapter manages and regulates the use of facilities in the public streets and rights-of-ways by providers, it does not grant the right to occupy the streets and public rights-of- ways which authority must be obtained by separate permit, license, revocable permit or franchise or other legal authority.
(b) Any person, firm or corporation that violates any provision of Sections 23-90 through 23-102 shall be guilty of a class one misdemeanor. Each day of violation continued shall be a separate offense, punishable as described above.
(Ord. No. 97-115, 12/9/97, enacted; Ord. No. 99-12, 3/16/99, renumbered from Section 23-103 (SUPP. 1999-1))
Peoria, Ariz., City Code § 23-107 Fiber Optic Communications Systems; Purpose and finding.
Sec. 23-107. Fiber Optic Communications Systems; Purpose and finding.
(a) The purpose of this ordinance is to establish a policy governing the management of Public Highways and rights-of-way for the installation, construction, operation or maintenance of any Fiber Optic Communications Systems and the provision of Fiber Optic Communications Services. This will enable the City to:
(1) Issue Licenses to corporations who use the Public Highways and rights-of-way to provide Fiber Optic Communications Services on a competitively neutral and nondiscriminatory basis;
(2) Manage the Public Highways and rights-of-way in order to minimize the impact and cost to Peoria citizens of the placement of Fiber Optic Communications Systems within Public Highways and rights-of-way;
(3) Manage the Public Highways and rights-of-way so as to maximize their efficient use, thereby minimizing the foreclosure of future additional uses of such Public Highways and rights-of-way; and
(4) Minimize congestion, inconvenience, visual impact, and other adverse effects on the City's Public Highways and rights-of-way.
(b) Therefore, in this ordinance the City Council intends:
(1) To ensure that locally elected officials manage local Public Highways and rights-of-way consistent with their fiduciary trust obligations;
(2) To ensure compliance with public health, safety and welfare measures for Public Highways and rights-of-way;
(3) To encourage public-private partnerships to provide Fiber Optic Communications Systems needed for the most cost-effective delivery of Fiber Optic Communications Services, including interstate services;
(4) To conserve the limited physical capacity of the Public Highways and rights-of-way held in public trust by the City; and
(5) To assure that the City's current and ongoing costs of granting and regulating private access to and use of the Public Highways and rights-of-way are fully paid by the persons seeking such access and causing such costs.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-108 Fiber Optic Communications Systems; Definitions.
Sec. 23-108. Fiber Optic Communications Systems; Definitions.
In this Section 23-108, unless the context otherwise requires, the following terms, phrases, words, and their derivatives must have the meanings given herein. Unless otherwise defined in these Sections 23-107 through 23-121, the rules of construction and definitions set forth in Sections 1-2, 19-2, 23-89, and 23-92 of the Peoria City Code apply to these Sections 23-107 through 23-121 as they relate to Fiber Optic Communications Licenses and encroachment permits for Fiber Optic Communications Systems and Fiber Optic Communications Services regulated by this Chapter of the Code. When not inconsistent with the context, words used in the present tense include the future, words in the plural number include the singular number, and words in the singular number include the plural number. The words "must" and "must" are mandatory, and "may" is permissive. Notwithstanding any provision of this code, and only for the purpose of these Sections 23-107 through 23-121, the following words, terms, and phrases must have the following meaning ascribed to them, except where the context clearly indicates a different meaning:
(a) Annual Minimum Fee (AMF): Means the annual fee assessed prior to the Licensee earning revenues from the provision of Fiber Optic Communications Services, which is based on the size of Licensee's service area and impact on City's infrastructure as determined by the City Engineer.
(b) Applicant: Means a person who submits an application for a Fiber Optic Communications License to the City.
(c) Application: Means a submission or response by a Fiber Optic Communications provider in accordance with City specifications requesting the City grant a Fiber Optic Communications License.
(d) Fiber Optic Communications: Means transmitting data from one place to another by sending pulses of infrared or visible light through an optical fiber.
(e) Fiber Optic Communications Services: Means intrastate and interstate data communication services provided over a Fiber Optic Communications System. This definition includes any provision of broadband internet services and contracting or leasing of fiber optic connections, fiber optic strands, or conduit, within the Fiber Optic Communications System to third parties. This definition does not include Telecommunications and Telecommunications Services as defined in A.R.S. § 9-581, Wireless Services as defined in A.R.S. § 9-591, Cable Services, as defined in Chapter 19 of the City Code, and Video Services as defined in A.R.S. § 9-1401.
(f) Fiber Optic Communications System: Means a network of fiber optic cables and all related parts and property including, without limitation, conduit, carrier pipe, cable fibers, repeaters, power sources, and all other attachments and appurtenances designed for or used to provide Fiber Optic Communication Services whether in active use or not. Fiber Optic Communications Systems may be referred to in these Sections 23-107 through 23-121 as "Facilities." Any reference to a Licensee's Fiber Optic Communications System or Facilities refers to the Fiber Optic Communications System as a whole or any part thereof.
(g) Fiber Optic Communications License and License: Means any grant under Sections 23-107 through 23-121 of this Chapter by the City allowing such Licensee to construct, operate, use, and maintain a Fiber Optic Communications System or to provide Fiber Optic Communications Services in the City. Any such authorization, in whatever term granted, must not mean and include, and is distinct from, any license or permit required for the privilege of transacting and carrying on a business within the City in accordance with the City of Peoria Sales Tax Code or Chapter 11 of this code.
(h) Gross Revenues: means all cash, credits, property of any kind of nature, or other consideration, less related bad debts not to exceed one and one-half percent (1.5%) annually, that is received directly or indirectly by the Licensee, its affiliates, subsidiaries, parent, or any person, firm, or cooperation in which the Licensee has a financial interest or that has a financial interest in the Licensee and that is derived from or attributable to the Licensee's operation of its Fiber Optic Communications System and provision of Fiber Optic Communications Services within the City, including, but not limited to:
(1) Revenue from all charges for services provided to Subscribers;
(2) Revenue from all charges for the insertion of commercial advertising upon the Fiber Optic Communications System;
(3) Revenue from all charges for the use of, lease of, or license of fiber optic connections, fiber, or conduit.
(4) Revenue from all charges for the installation, removal, connection and reinstatement of equipment necessary for a User and/or subscriber to receive Fiber Optic Communications Services;
(5) And any other income derived from the Fiber Optic Communications System;
(6) "Gross Revenues" must not include taxes, fees, or surcharges collected by Licensee on behalf of any governmental authority; any increase in the value of any stock, security or asset; dividends or other distributions made in respect of any stock or securities; value received by a Licensee (or any of its affiliates, subsidiaries or parent) through cooperative advertising.
(i) Internet service provider (ISP): Means an entity that provides broadband services for accessing and using the internet.
(j) Laws: Means, collectively, any and all Federal, State, or local law, statute, common law, code, rule, regulation, order, or ordinance existing or heretofore enacted or established.
(k) Licensee: Means any person who has applied for and been granted a Fiber Optic Communications License pursuant to Sections 23-107 through 23-121 of this Chapter.
(l) Notice: Means mailing via USPS to the address provided by the parties on the Fiber Optic Communications License.
(m) Person: Means as defined in Section 23-92 of this code.
(n) Provider: Means a person who delivers Fiber Optic Communications Services or constructs, operates, uses, or maintains a Fiber Optic Communications System.
(o) Public Highway or Highway: Means all roads, streets, City owned property, and alleys and all other dedicated public rights-of-way and public utility easements of the City.
(p) Residential Unit: means any property used as a residence, regardless of zoning classification, which will be utilized as a basis to calculate the AMF. If Licensee has a contract to provide Fiber Optic Communications Services to a multiple dwelling unit complex, including condominiums or apartments, Licensee shall include the total number of Residential Units available within the property for calculation of the AMF.
(q) Rights-of-Way or ROW shall have the same meaning as Public Highway or Highway.
(r) User: means a recipient of Fiber Optic Communications Services provided by a Licensee.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-109 Fiber Optic Communications Systems; license to operate; required.
Sec. 23-109. Fiber Optic Communications Systems; license to operate; required.
(a) The City Council may grant a Fiber Optic Communications License to any person, whether or not such person has been granted a license pursuant to any other provision of the Peoria City Code, who offers to provide Fiber Optic Communications Services or construct, install, maintain, or operate a Fiber Optic Communications System under and pursuant to the terms and provisions of Sections 23-107 through 23-121 of this Chapter.
(b) The City Engineer or designee is authorized to approve and execute a Fiber Optic Communications License on behalf of the City and to authorize minor deviations thereto upon a showing of good cause.
(c) The City explicitly reserves the power, without limitation, to, in its sole discretion, amend any section of the City Code to require additional or greater standards of construction, operation, maintenance, or otherwise pursuant to the City's lawful police powers.
(d) It is unlawful for any person to construct, install, maintain, or operate a Fiber Optic Communications System or any portion thereof or provide Fiber Optic Communications Services using any City right-of-way or other City owned property, unless said person has first:
(1) Applied for and been granted a Fiber Optic Communications License by the City Council pursuant to the provisions of this Chapter;
(2) Obtained all relevant permits required by the City Engineer;
(3) Posted all insurance, bonding, security, or any other requirements required by the City Engineer; and
(4) Complied with all provisions of the Peoria City Code, a Fiber Optic Communications License, the City of Peoria Engineering Standards, any other requirements of the City Engineer or designee, and all other laws, directives, and regulations.
(e) The power to grant a Fiber Optic Communications License is in the sole discretion of the City Council. Nothing in this Chapter must be deemed to require the City to grant a Fiber Optic Communications License to any person.
(f) All provisions of these Sections 23-107 through 23-121, and any Fiber Optic Communications License are binding upon each Licensee, its successors, lessees, or assignees and such responsibility may not be transferred except with the written permission of the City Engineer.
(g) Notwithstanding any language to the contrary in a Fiber Optic Communications License or elsewhere, all licenses granted pursuant to these Sections 23-107 through 23-121 are non-exclusive privileges and will never impart to the Licensee or any other party, any right of property in any City right-of-way or other City owned property.
(h) It is unlawful to provide Fiber Optic Communications Services anywhere within the City except pursuant to a Fiber Optic Communications License.
(i) A Fiber Optic Communications License granted under this Chapter must never have the power to or the effect of:
(1) Authorizing a Licensee to use the City's rights-of-way or other City owned property to provide any service other than Fiber Optic Communication Services;
(2) Invalidating any franchise, license, or permit that authorizes the use of the City's rights-of-way, or other City owned property for any other service;
(3) Authorizing any party holding any franchise, license, or permit other than a Fiber Optic Communication System License, to use the City's rights-of-way or other City owned property to provide to install, maintain, construct, or operate a Fiber Optic Communications System, or to provide Fiber Optic Communications Services without first obtaining a Fiber Optic Communications License.
(j) Nothing in this ordinance must be deemed to affect the terms or conditions of any franchise, license, or permit issued by the City prior to the effective date of this ordinance or to release any party from its obligations thereunder. The City Manager, with the consent of the City Council, may enter into an agreement with any existing franchise holder, licensee, or permittee to modify or terminate any existing franchise, license, or agreement, subject to the terms of those agreements.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-110 Fiber Optic Communications Systems; Failure to have license; violation and penalties.
Sec. 23-110. Fiber Optic Communications Systems; Failure to have license; violation and penalties.
(a) This ordinance manages and regulates Fiber Optic Communications Systems and the provision of Fiber Optic Communications Services in the City's rights-of-way and other City owned property, it does not grant any right to occupy the City's rights-of-way or other City owned property except as described herein.
(b) Any person, firm or corporation that violates any provision of Sections 23-107 through 23-121, shall be guilty of a class one misdemeanor. Each day of violation continued shall be a separate offense, punishable pursuant to City Code.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-111 Fiber Optic Communications Systems; Limitations of License.
Sec. 23-111. Fiber Optic Communications Systems; Limitations of License.
(a) The City specifically reserves the right, without limitation, to grant a Fiber Optic Communications License to any person or to authorize itself or any other governmental entity to provide Fiber Optic Communications Services without first obtaining a Fiber Optic Communications License at any time and in any area of the City in the City's sole discretion.
(b) Any right or privilege in the City's rights-of-way or any other City property claimed under any license or by any licensee is subordinate to any and all rights of the City and all other governmental entities including without limitation prior or subsequent occupancy or use thereof by the City or any governmental agency and is subordinate to any prior easements or other property interests therein; provided, however, that nothing herein must extinguish or otherwise interfere with property rights established independently of any license issued pursuant to these Sections 23-107 through 23-121.
(c) Any right, power, or duty imposed upon any officer, employee, department, or board of the City pursuant to this Chapter is subject to transfer by the City to any other officer, employee, department, or board of the City pursuant to this code, in the City's sole discretion.
(d) Licensees are subject to and must comply with all Peoria City Codes, subdivision regulations, the City of Peoria Engineering Standards, a Fiber Optic Communications License, any other requirements of the City Engineer or designee, the provisions of any license, permit, or franchise issued by the City, and all other laws, directives, and regulations.
(e) Any Fiber Optic Communications License granted under Sections 23-107 through 23-121 of this Chapter is hereby deemed to be an executory contract under the provisions of 11 U.S.C. Section 365.
(f) The City shall not issue any permits related to or otherwise authorize a person to construct, occupy, or install any portion of a Fiber Optic Communications System in the City's rights-of-way or other City property unless the person, entity, or corporation has first been granted a Fiber Optic Communications License under this Chapter.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-112 Fiber Optic Communications Systems; license application.
Sec. 23-112. Fiber Optic Communications Systems; license application.
(a) Any person, firm or corporation desiring a Fiber Optic Communications License under this Chapter may file an application with the City Engineer in a form prescribed by the City Manager and must pay an application filing fee determined by the City Manager. No Fiber Optic Communications License will be granted unless the applicant:
(1) Provides any other information that the City in its sole discretion deems necessary to ensure that the applicant will comply with requirements for use of and location of such Facilities;
(2) Identifies the person, entity, or corporation including its legal name, current address, and telephone number that connects to a live person authorized to make decisions related to the Fiber Optic Communications System and License;
(3) Thoroughly and accurately describes the services to be provided;
(4) Includes a complete copy of all agreements with all other persons, entities, or corporations that will use the Facilities to provide Fiber Optic Communications Services;
(5) Agrees, in writing provided to the City, to comply with all use requirements that the City may establish from time to time;
(6) Provides current, accurate, and detailed maps showing the locations of all of applicant's Facilities and any other Facilities the applicant may use that are located in the City rights-of-way or other City owned property, and agrees in writing to provide updated maps to the City upon request and comply with any other mapping requirements or requests as the City may make from time to time;
(7) Obtains and maintains for the duration of the License all insurance that the City deems necessary in its sole discretion, and provide proof of such insurance to the City prior to issuance of the License and upon request throughout the duration of the License;
(8) Agrees, in writing provided to the City, to post all bonds and securities as required in the sole discretion of the City Engineer;
(9) Agrees, to fully indemnify the City, its officers, employees, agents, boards, and commissions, in a form satisfactory to the City;
(10) Provides a written waiver of all recourse whatsoever against the City or its officers, employees, agents, boards, and commissions for any loss, cost, expense or damage arising out of any provision of the License, any City requirement related to the License, or because of any defects in this Chapter or the License in a form satisfactory to the City;
(11) Agrees to comply with and be bound by all City Codes, administrative and enforcement provisions as the City may establish from time to time.
(b) Upon receiving an application for a Fiber Optic Communications License that satisfies the conditions of Subsection (a) above, the City may offer a draft Fiber Optic Communications License to the applicant for review, and may inquire into any matters the City, in its sole discretion, deems relevant to the issuance of a Fiber Optic Communications License. If the applicant agrees to the terms and conditions of the License, and otherwise satisfies all relevant conditions, as determined in the sole discretion of the City Engineer, the License must be submitted for a vote by the City Council with a recommendation for approval. Notwithstanding the foregoing, the City may refuse to grant a Fiber Optic Communications License if the City determines in its sole discretion that the applicant has previously had its Fiber Optic Communications License (or any similar license) revoked in any jurisdiction, or for any other reason permitted under law.
(c) Every Fiber Optic Communications License shall be subject to the following administrative and enforcement provisions:
(1) Fiber Optic Communications Licenses are personal to the Licensee. No transfer of a License, or change of control over the person, entity, or company holding the License (including, but not limited to transfer by forced or voluntary sale, merger, consolidation, receivership, or any other means) will be valid or effective without the City's prior written consent, which consent will not be unreasonably withheld or delayed. Any attempted transfer in violation of this Section shall render the License revoked.
(2) In making a determination as to whether to approve a transfer of a Fiber Optic Communications License the City may consider without limitation: i) the same information and qualifications required of an original application for said License; ii) whether the Licensee is in compliance with the Fiber Optic Communications License, the City Code, and all relevant department guidelines; iii) whether the proposed transfer would result in an evasion of any other applicable provisions of law, or impair any lawful contracts; and iv) the effect of the proposed transfer on the City's interests and responsibilities.
(3) No application for a transfer of a Fiber Optic Communications License will be considered unless the proposed transferee agrees in writing provided to the City that it will abide by and accept all terms of the Peoria City Code, the Fiber Optic Communications License, and all relevant department guidelines and will assume all obligations, liabilities, and responsibilities for all acts and omissions, known and unknown, of the previous Licensee and the Fiber Optic Communications License for all purposes, including renewal.
(4) Approval by the City of a transfer of a license does not constitute a waiver or release of any of the rights of the City under this Chapter or the License, whether arising before or after the date of the transfer.
(5) Every License is subject to revocation if the Licensee fails to comply with any terms of the Peoria City Code, the Fiber Optic Communications License, and all relevant department guidelines. The City may revoke a Fiber Optic Communications License no less than sixty (60) days after providing notice to the Licensee according to the terms of the License of the defect in performance, and failure of Licensee to cure the defect in performance to the City's satisfaction within sixty (60) days of said notice. Except if the City finds that the defect in performance is due to intentional misconduct, is a violation of any law, or is part of a pattern of violations of which the City has previously provided notice to the Licensee according to the terms of the License and provided Licensee a reasonable opportunity to cure such pattern of violations, the City may revoke the Fiber Optic Communications License immediately. A hearing before a City hearing officer designated to hold such hearings, pursuant to Section 2-20 of the Peoria City Code, must be held before a License is revoked if the Licensee requests a hearing.
(6) Additional penalties for a violation of the terms of a Fiber Optic Communications License.
(7) Damages for violation of the License terms. Any remedies available to the City are cumulative and are not limited by the recovery of any amounts pursuant to the insurance provisions of the License, or pursuant to any indemnity clause.
(8) A requirement that if the Licensee fails to pay amounts owed to the City by the time prescribed for payment, the Licensee must pay interest on the amounts owed, at the rate of one percent (1%) per month.
(9) A requirement that Licensee must produce books and records for the City's inspection and copying, prepare reports, respond to questions and permit the City to have access to its Facilities as the City may request in order to determine whether Licensee has complied with its obligations under the license, or other applicable law.
(d) A Licensee may apply for a renewal of the Fiber Optic Communications License prior to the expiration of the License, which the City may approve or reject in accordance with the requirements of this Chapter.
(e) The grant of a license, permit or other authorization by the City is not a representation or warranty that such license, permit, or authorization is a legally sufficient substitute for a franchise, and is not a representation or warranty that a franchise is not required.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-113 Fiber Optic Communications Systems; license duration.
Sec. 23-113. Fiber Optic Communications Systems; license duration.
Any Fiber Optic Communications License granted by the City pursuant to this Chapter shall commence upon adoption of the License and acceptance of the License by the provider within thirty (30) days of the grant. The License shall be effective for a period determined by the City Council, but not to exceed five (5) years, and subject to the conditions and restrictions provided in the instrument and this Chapter.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-114 Fiber Optic Communications Systems; license fee.
Sec. 23-114. Fiber Optic Communications Systems; license fee.
(a) All Licensees must pay to the City an annual license fee as set forth in this Section 23-114 of the City Code and as codified in Table 27-7 of the City Code. The annual license fee must be paid quarterly and/or annually on the anniversary date of the issuance of the License, as set forth in this Section 23-114, and submitted to the City's Chief Financial Officer. Any annual license fee unpaid thirty (30) days after the anniversary date of the issuance of the License will accrue interest at the rate of one percent (1%) per month.
(1) Licensee shall pay an Annual Minimum Fee ("AMF") on a quarterly or annual basis until such time that Licensee begins earning revenue from the provision of Fiber Optic Communications Services, which Licensee will then transition to the fee structures set forth in Subsections 23-114(a)(2) and 23-114(a)(3) of this Section.
(2) If the Licensee is offering internet services directly to subscribers and is the Internet Service Provider (ISP), Licensee shall transition to an annual license fee of three percent (3%) of Gross Revenues when three percent (3%) of gross revenues from the sale of internet services using Licensee's Facility exceeds the AMF.
(3) If a Licensee occupies any portion of the City rights-of-way or any other City property and leases, licenses, or contracts the use of fiber-optic broadband connections, strands of fiber, or conduit to any other party in exchange for any form of compensation, Licensee shall transition to a quarterly and/or annual payment of three percent (3%) of Gross Revenues when three percent (3%) of gross revenues from the leasing, licensing, or contracting Licensee's Facilities to any other party exceeds the AMF, unless Licensee provides evidence that such use is exempt from fees by any state or federal law. Users that lease, license or contract use of the Licensee's Facilities to provide Fiber Optic Communications Services as defined in this ordinance, Telecommunications and Telecommunication Services, as defined by A.R.S. § 9-581, Wireless Services as defined in A.R.S. § 9-591, Cable Services as defined in the Peoria City Code, or Video Services as defined in A.R.S. § 9-1401, must obtain the appropriate Fiber Optic Communications License, Telecommunications, Wireless, Cable or Video Services license from the City.
(4) If a Licensee increases or decreases the size of the service area in which Fiber Optic Communications Services are provided, the AMF will be increased and/or decreased respectively.
(b) New residential subdivisions.
(1) Licensee may coordinate with a developer to install its Facilities within the rights-of-way and public highways of a new residential subdivision prior to completion of the street asphalt layer.
(2) If Licensee installs its Facilities in the rights-of-way and/or public highways of a new residential subdivision concurrent with new street construction that does not disturb the asphalt surface, Licensee will not be subject to the street restoration requirements set forth in the City's Street Cut Policy and in Section 23-63 of the Peoria City Code.
(3) Until the developer has obtained permits for fifty-one percent (51%) of the Residential Units, Facilities installed under this Subsection 23-114(b) will not be subject to an annual license fee, and any Residential Units that Licensee has passed on a local street and a collector street with its Facilities within the new residential subdivision, will be excluded from the calculation of the AMF. If the new residential subdivision is developed in phases, then the annual license fee or AMF shall be implemented when the developer has obtained permits for fifty-one percent (51%) of the Residential Units in that phase of the new residential subdivision. The Licensee must notify the City Engineer within thirty (30) days of the developer obtaining permits for fifty-one percent (51%) of the residential units in the new residential subdivision and the City Engineer shall verify the percentage of permits issued within the new subdivision.
(c) Each Licensee must reimburse the City for all additional expenses that the City incurs, in connection with the processing, evaluation and preparation of documents relating to the Fiber Optic Communications License including, without limitation, any and all administrative, engineering, publication, legal costs, and consultants' expenses. The City will document all such expenses by invoice. If expenses exceed the total amount of filing fees collected from the Applicant(s), the Licensee must pay to the City the excess amount within thirty (30) days of demand of the City. All amounts unpaid thirty (30) days after said demand will accrue interest at the rate of one percent (1%) per month.
(d) All fees described in this Section 23-114 will increase annually according to the Consumer Price Index (CPI) adjustments, to be applied annually, which will be based on the Consumer Price Index for All Urban Consumers (CPI-U) for the Phoenix area, published by the U.S. Department of Labor, Bureau of Labor Statistics. The increase will be calculated by dividing the most recent calendar year's December CPI-U by the December CPI-U in the year rates last changed. In the event that the change between December CPIs indicates an adjustment of less than one percent (1%), a rate change may not be made for the upcoming year.
(e) Each year, before the anniversary date of the effective date of the Fiber Optic Communications License, each Licensee must submit an accounting and attestation to the City Engineer and the City's Chief Financial Officer that fully sets forth the following information:
(1) The total Gross Revenue generated by all of Licensee's Facilities located in the City's rights-of-way and any other City property during the twelve (12) consecutive months prior to the anniversary date of the effective date of the Fiber Optic Communications License. Licensee must submit the Gross Revenue report to the City Engineer and the City's Chief Financial Officer annually by the anniversary date of the effective date of the Fiber Optic Communications License.
(2) Identities of all third parties to which Licensee is providing fiber connections, strands of fiber, or conduit in exchange for any form of compensation. If Licensee is not providing fiber connections, strands of fiber or conduit to any third party, Licensee must attest to such.
(3) Provide the total linear footage of fiber or conduit provided to a third party in exchange for any form of compensation. If Licensee is not providing strands of fiber or conduit in exchange for any form of compensation to any third party, Licensee must attest to such.
(f) If in any year before the anniversary of the effective date of the Fiber Optic Communications License, the City Engineer believes Licensee has not submitted a complete and accurate accounting and attestation to the City as required by Section (e) above, the City will provide written notice to the Licensee of such violation. If the Licensee has not cured the violation within thirty (30) days of the City mailing said notice, the Fiber Optic Communications License will immediately be revoked.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25; Ord. No. 2025-25, § 1(Exh. A), 8-26-25)
Peoria, Ariz., City Code § 23-115 Fiber Optic Communications Systems; Location and relocation in rights-of-way.
Sec. 23-115. Fiber Optic Communications Systems; Location and relocation in rights-of-way.
(a) Each Licensee is responsible for all work within the City's rights-of-way, or any other City owned property, or work that may affect the City's rights-of-way or any other City owned property carried out by the Licensee, its contractors, agents, and employees. Each Licensee must ensure that:
(1) All of Licensee's Facilities are installed, constructed, and maintained in strict accordance with all City Codes, subdivision regulations, the City of Peoria Engineering Standards, the Fiber Optic Communications License, any other requirements of the City Engineer or designee, the provisions of any license, permit, or franchise issued by the City, and all other laws, directives, and regulations.
(2) No work within the City rights-of-way or any City owned property, or work that may affect the City rights-of-way or any City owned property, may commence until all applicable bonds, licenses, permits, and any other requirements of the City Engineer have been satisfied and/or approved by the City.
(3) All Facilities are installed, constructed, and maintained so that no additional costs are imposed upon the City, and so that the Facilities do not interfere with other uses or users of any public right-of-way or other City owned property.
(4) All Facilities must be located (or relocated) so as to minimize interference with any City use of the City's rights-of-way, and other City owned property, including without limitation traffic control. Any construction that has the potential to affect traffic control, including without limitation, backfilling, compaction, and paving, as well as the location or relocation of said Facilities may be subject to additional regulation in the sole discretion of the City Engineer.
(b) In the event that any portion of a Licensee's Facilities are used by a provider other than the Licensee for any reason, the Licensee and every provider using said portion of the Licensee's Facilities, are jointly and severally responsible for the Facilities. Licensee and all users are jointly and severally responsible to ensure that all Facilities are installed, constructed, and maintained in strict accordance with all City Codes, subdivision regulations, the City of Peoria Engineering Standards, Fiber Optic Communications License, any other requirements of the City Engineer or designee, the provisions of any license, permit, or franchise issued by the City, and all other laws, directives, and regulations.
(c) The Licensee must keep and maintain accurate installation records of the location of all portions of the Facilities and furnish said records to the City upon request or at such periodic intervals as the City may require. For underground Facilities (whether new or relocated), Licensee must provide such records in a format compatible with the current City mapping tools in a way that clearly and accurately shows the location of the underground and above ground Facilities.
(d) Whenever a Licensee causes any opening or alteration whatsoever to be made for any purpose in any City right-of-way or other City owned property, all related work must be completed within a reasonable time, and before such work will be considered complete, the Licensee must, without expense to the City, restore any disturbance in a manner consistent with all City Codes, subdivision regulations, the City of Peoria Engineering Standards, a Fiber Optic Communications License, any other requirements of the City Engineer or designee, the provisions of any license, permit, or franchise issued by the City, and all other laws, directives, and regulations, and subject to the approval of the City Engineer.
(e) A Licensee must not install, use, or maintain any of its Facilities in such a manner as to interfere with the City's placement, construction, use, or maintenance of its rights-of-way or other City owned property, including without limitation, street lighting, water pipes, drains, sewers, traffic signal systems, or any other system that has been, or may be, installed, maintained, used, or authorized by the City. At any time, upon the City's request, Licensee must relocate Facilities at no cost or expense to the City, within a timeframe specified by the City. If Licensee has not moved the Facilities or otherwise made arrangements acceptable to the City Engineer within thirty (30) days after the City mailed notice of such request to the contact address provided by the Licensee, the City may relocate said Facilities in the City's sole discretion. In such event, Licensee must reimburse the City any costs the City incurs related to the removal and relocation of the provider's Facilities, including all design and construction costs.
(f) No Licensee must install, maintain, or use any of its Facilities in such manner as to damage or interfere with any Facility of another provider located within the City rights-of-way or other City owned property. If the City Engineer determines that a Licensee has violated this section, the Licensee must relocate its Facilities at no cost or expense to the City in such a way that eliminates the violation.
(g) No person, entity, or corporation must install Facilities within the City rights-of-way or other City owned property except in strict accordance with plans approved by the City. A Licensee may install Facilities in existing conduit after providing the City proof acceptable to the City Engineer, that the owner of said conduit has granted the Licensee permission to install Facilities within the Owner's conduit. If a Licensee uses existing conduit of another provider, the Licensee and provider are subject to the provisions of this Chapter.
(h) No Licensee may begin any work within the City rights-of-way or other City owned property until said Licensee has obtained and provided proof acceptable to the City Engineer of satisfaction of all insurance, bonding, security, or any other requirements of the City Engineer. If a Licensee believes that the City has not specified such requirements for the type of work proposed, said Licensee must obtain written approval from the City Engineer before commencing any work within the City rights-of-way or other City owned property.
(i) If the City Engineer finds that a Licensee has begun work in violation of this Chapter, City Codes, subdivision regulations, the City of Peoria Engineering Standards, a Fiber Optic Communications License, any other requirements of the City Engineer or designee, the provisions of any license, permit, or franchise issued by the City, and all other laws, directives, and regulations, the City Engineer may order the provider to stop work immediately. After the City Engineer has issued a stop work order, the City Engineer may require said Licensee to cease using the Facility, until all requirements are satisfied, or to remove the Facility. If Licensee has not moved the Facilities or otherwise made arrangements acceptable to the City Engineer within thirty (30) days after the stop work order, the City may relocate said Facilities in the City's sole discretion. In such event, said Licensee must reimburse the City any costs the City incurs related to the removal and relocation of the provider's Facilities, including all design and construction costs.
(j) Notwithstanding the foregoing, in the event that a Licensee must make emergency repairs to its Facilities in order to remain in compliance with any federal or state law, the Licensee must notify the City prior to initiating such repairs, or as soon as practicable, and the license must obtain all necessary permits as soon as practicable.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-116 Fiber Optic Communications Systems; conflict with City projects.
Sec. 23-116. Fiber Optic Communications Systems; conflict with City projects.
(a) If the City suspects that Facilities used by a Licensee may create or have created a conflict with any proposed City construction, the City will notify Licensee in writing. Within fourteen (14) days of the mailing of such notice, the Licensee must either:
(1) Locate and upon City's request, expose said Facilities, and provide the location information to the City; or
(2) Use a location service under contract with the City to locate and/or expose said Facilities and provide such information to the City. The Licensee must then reimburse the City for all of the actual costs to the City resulting from the use of such location service.
(3) If Licensee has not provided said location information to the City or otherwise made arrangements acceptable to the City Engineer within thirty (30) days after the mailing of the notice, the City may relocate said Facilities in the City's sole discretion. In such event, said Licensee must reimburse the City any costs the City incurs related to the relocation of the provider's Facilities, including all design and construction costs.
(b) If the City Engineer finds that a Licensee's Facilities are in conflict with any City Project, the City will notify Licensee in writing. In such event, the Licensee must:
(1) As soon as practicable, but in no event later than six (6) months from the mailing of the notice of conflict, remove or relocate the conflicting facilities in a manner approved by the City Engineer. This period may be extended at the sole discretion of the City Engineer.
(2) If the City Engineer finds that a conflict exists after the City has provided the project contractor notice to proceed on the project, the City will notify Licensee that an exigency exists. Upon receipt of such notice, Licensee must immediately begin the process of removing or relocating the Facilities. Notwithstanding any language in Sections 23-107 through 23-121 of this Chapter or a Fiber Optic Communications License, Licensee must begin actual construction of such removal or relocation no later than seventy-two (72) hours after receipt of such notification.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-117 Fiber Optic Communications Systems; relocation of Facilities.
Sec. 23-117. Fiber Optic Communications Systems; relocation of Facilities.
(a) Any language in any license notwithstanding, the City reserves every and all rights to the City's rights-of-way and all other City owned property, including without limitation the right to lay, construct, erect, install, use, operate, repair, replace, remove, relocate, regrade, widen, realign, maintain, modify, abandon, or alter any aerial, surface, or subsurface improvements thereon. Such improvements may include without limitation, water mains, traffic control conduits, cable, and devices, sanitary or storm sewers, subways, tunnels, bridges, viaducts, and any other public construction. When the City invokes such rights for any reason, the City will provide written notice to the Licensee. Within thirty (30) days form the mailing of such notice, Licensee must remove all its Facilities from the stated rights-of-way at no cost or expense to the City. If Licensee has not moved the Facilities or otherwise made arrangements acceptable to the City Engineer within thirty (30) days after the mailing of notice, the City may relocate said Facilities in the City's sole discretion. In such event, said Licensee must reimburse the City any costs the City incurs related to the removal and relocation of the provider's Facilities, including any design and construction costs. The City shall not bear any cost of removal or relocation of existing Facilities, unless the City Engineer has agreed to bear said costs.
(b) If a Licensee's removal or relocation of Facilities delays construction of any public project, causes the City to be liable for damages including without limitation damages or delay, or causes the City to incur any cost or expense, including without limitation attorney's fees, the Licensee must reimburse the City in full.
(c) In the event a Licensee disputes the amount of damages attributable to the Licensee, the matter must be referred to the dispute resolution board. The dispute resolution board must consist of one member selected by the City, one member selected by the Licensee, and a third person agreed upon by both parties. The person agreed upon by both parties must be chairperson of the dispute resolution board. Expenses for the dispute resolution board must be shared equally by the City and the Licensee. The board will hear the dispute promptly, and render an opinion as soon as possible, but in no case later than sixty (60) days after notification by the City of Licensee's allocated share of damages suffered by the City. All decisions of the dispute. resolution board are non-binding on either the City or the Licensee, however, the findings of the dispute resolution board must be admissible in any legal action. The City and the Licensee must accept or reject findings of the dispute resolution board within thirty (30) days after receipt of the findings. If damages are assessed by the dispute resolution board, the Licensee must pay the City within thirty (30) days. Late charges of five percent (5%) and interest charges of one and one-half percent per month must be added for late payment.
(d) Except as otherwise provided in a license, franchise or permit or by other provision of law, the entire cost of relocation must be borne by the City if the Licensee is required by the City to relocate Facilities which are located within private easements obtained by the Licensee prior to the dedication of the public street or easement from which the Facilities must be relocated. These prior rights of the Licensee would also be unaffected by any subsequent relocation. A prior right as used in this Subsection (d), means private easement rights obtained by the Licensee prior to the dedication of the streets or public ways from which the Facilities are requested by the City to be relocated. In the case of Facilities that serve multiple purposes, the prior rights must extend to all uses for this exception to apply.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-118 Fiber Optic Communications Systems; damage to City rights-of-way and facilities.
Sec. 23-118. Fiber Optic Communications Systems; damage to City rights-of-way and facilities.
If, Licensee during construction, installation or repair of its Facilities causes damage to pavement, sidewalks, driveways, landscaping, surface or subsurface of any rights-of-way or adjoining public property, or the public improvement located thereon, therein, or thereunder the public property or other property, the Licensee or the authorized agent shall, at its own expense and in a manner approved by the City, replace and restore such places to a condition satisfactory to the City Engineer that existed before said work was commenced. The Licensee shall further maintain all such restoration related to Licensee's activities, in the condition approved by the City for a minimum period of one (1) year following such restoration. Upon failure of the Licensee to complete any work required by law, or by the provisions of this Chapter, or by its License, to be done in any Street, within ten (10) days following due notice and to the satisfaction of the City Engineer, the City may, at its option, cause such work to be done and the Licensee shall pay to the City the cost thereof in the itemized amounts reported by the City Engineer to the Licensee within fifteen (15) days after receipt of such itemized report. Or, at City's option, City may demand of Licensee the estimated cost of such work as estimated by the City Engineer, and such shall be paid by Licensee to City within fifteen (15) days of such demand. Upon award of any contract or contracts therefor, Licensee shall pay to City, within fifteen (15) days of demand, any additional amount necessary to provide for cost of such work. Upon completion of such work, Licensee shall pay to City or City shall refund to Licensee such sums so that the total received and retained by City shall equal the cost to the City of such work. "Cost" as used herein shall include fifteen percent (15%) of other costs for the City's overhead, together with any interest charges incurred by City arising out of Licensee's late payment to City under this section.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-119 Fiber Optic Communications Systems; City police power; continuing jurisdiction.
Sec. 23-119. Fiber Optic Communications Systems; City police power; continuing jurisdiction.
(a) Every License is at all times subject to all lawful exercise of the police power by the City, including any and all City Codes, subdivision regulations, the City of Peoria Engineering Standards, Fiber Optic Communications License, any other requirements of the City Engineer or designee, the provisions of any license, permit, or franchise issued by the City, and all other laws, directives, and regulations which the City has adopted or will ever adopt, and all laws, rules, regulations, orders, and policies of the State of Arizona and the United States government. In the event of a conflict between this ordinance and other provisions of the City Code, the stricter requirement must apply.
(b) In addition to all other rights and powers retained by the City under this Chapter or otherwise, the City Engineer has the right and authority to revoke any Fiber Optic Communications License and all rights and privileges of a Licensee thereunder upon finding that a Licensee has committed a recurring, protracted, or material breach of the License, City Codes, subdivision regulations, the City of Peoria Engineering Standards, a Fiber Optic Communications License, any other requirements of the City Engineer or designee, the provisions of any license, permit, or franchise issued by the City, and all other laws, directives, and regulations.
(c) Any finding by the City Engineer pursuant to any provision of Sections 23-107 through 23-121 is subject to appeal and a hearing before a City hearing officer, designated to hold such hearings pursuant to Section 2-20 of the Peoria City Code, should the Licensee request such a hearing.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-120 Fiber Optic Communications Systems; Removal and abandonment of property of Licensee.
Sec. 23-120. Fiber Optic Communications Systems; Removal and abandonment of property of Licensee.
(a) If the use of substantial part of the Facilities is discontinued for any reason for a continuous period of twelve (12) months, or if Facilities or property have been installed in any City right-of-way or other City owned property without strictly complying with the requirements of a Fiber Optic Communications License and this Chapter, or after a Fiber Optic Communications License has been terminated, revoked, canceled, or has expired without renewal, the City may provide notice to the Licensee that the Facilities or property must be removed. The Licensee must promptly and completely remove all such Facilities and property from City rights-of-way and other City owned property and restore the street or other area from which such property has been removed to a condition satisfactory to the City Engineer.
(b) If such Licensee has not promptly and completely removed the Facilities and property and completely restored area to a condition satisfactory to the City Engineer or otherwise made arrangements acceptable to the City Engineer within thirty (30) days after the mailing of the notice, the City may relocate said Facilities in the City's sole discretion. In such event, said Licensee must reimburse the City any costs the City incurs related to the removal and relocation of the provider's Facilities, including all design and construction costs.
(c) Any property of the Licensee remaining in place one hundred eighty (180) days after the termination or expiration of the License shall be at the option of the City considered permanently abandoned.
(d) A Licensee must not abandon in place any Facilities or property unless approved by the City Manager and only in such a manner as the City Manager may prescribe. Upon abandonment of such Facilities or property, the Facilities or property must become that of the City, and the Licensee must submit to the City an instrument in writing, to be approved by the City Attorney, transferring to the City the ownership of such facilities and property.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Peoria, Ariz., City Code § 23-121 Fiber Optic Communications Systems; Exemption.
Sec. 23-121. Fiber Optic Communications Systems; Exemption.
(a) Any provider that claims that it is exempt from some or all of the provisions of Sections 23-107 through 23-121 pursuant to Arizona or Federal Law must notify the City of its claim and the nature and basis thereof. If the City Engineer is satisfied that an exemption applies and the City Council approves, the City may issue a license to use the rights-of-way pursuant to such law. Any such license issued must be strictly limited in scope to allow the provision of only those services that the City Engineer has found to be exempted from Sections 23-107 through 23-121 by law.
(b) Subject to written approval of the City Engineer, a license granted under subsection (a) may be combined with a Fiber Optic Communications License.
(c) The provisions of Sections 23-107 through 23-121 do not apply to the installation of up to twenty-five (25) linear feet of conduit in the right-of-way that is directly associated with a Wireless Facility that is separately licensed by the City.
(Ord. No. 2025-09, § 1(Exh. A), 4-22-25)
Source: City of Peoria, Arizona, City Code and Charter (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/peoriaaz/latest/peoria_az/0-0-0-43605Fetched: 11/8/2026
