27-126 Regulating the placement of utility facilities below ground.
(a) Purpose. This section is enacted in order to meet the following goals: To improve the city’s vistas, view corridors, and streetscapes, particularly those along streets which are heavily traveled and provide visual access to Lake Champlain, as well as those that serve as main approaches into the city; To improve the city’s physical environment where the opportunities exist to advance community goals for economic development, cultural and recreational activities, and the enhancement of its visual and historic resources; To re-establish the city’s street tree canopy where possible; and To maintain consistency with existing policies regarding the underground construction of utility facilities. (b) Definitions. The following terms, whether singular or plural, shall be defined as follows: Person: Any agency, individual, firm, company, association, society, corporation, body, or group. Public improvement project: Any project undertaken by a local, state, or federal body for the benefit of the general public, such as, but not limited to, road or bridge construction, or the development of a park. Any utility facility project undertaken by a privately, publicly or cooperatively owned utility, or any combination thereof, that requires a certificate of public good from the Vermont Public Service Board or an Act 250 permit from the environmental board or district environmental commission shall be considered a public improvement project. Substantial roadway reconstruction: The construction of any new road in the public right-of-way, and the construction of any new road that is part of a project subject to the jurisdiction of the subdivision regulations of the City of Burlington, and the modification of an existing road that results in an increase in the number of lanes for at least five hundred (500) feet of its length or an increase of over four (4) feet in the width of the paved portion of the road for at least five hundred (500) feet of its length. Utility facility: Any privately, publicly, or cooperatively owned line, facility, or system for producing, transmitting, or distributing communications, cable television, power electricity, light, heat, gas, oil, crude products, water, steam, waste, stormwater not connected with the highway drainage, or any other similar commodity, including any fire or police signal system or street lighting system, which directly or indirectly serves the public. (c) Requirements: (1) Review committee. An underground utilities review committee consisting of a representative of the planning and zoning, Burlington electric, public works, community and economic development and parks departments shall review all projects covered by this section. Input shall be solicited from affected utilities during each project review. The underground utilities review committee shall maintain a record of the evidence presented during its review of each project. (2) New roadways. On any new road, street, or highway hereafter constructed within the city, all new and existing utility facilities associated with the right-of-way of such project will be installed or relocated underground in accordance with the specifications of the affected utilities and the locational requirements of the department of public works unless the city council determines that underground installation is not feasible due to the existence of any of the conditions listed below. The underground utilities review committee shall review the project and may recommend to the city council that the requirements of this subsection be waived, in whole or in part, for a specific new roadway project based on a finding that the placement of utility facilities underground is not feasible due to one or more of the following conditions: a. That hazardous conditions at or near the project site unduly endanger the health and safety of the workers or the public or both, either during or after installation; b. That the placement of utilities underground would irreparably endanger an important historic or natural resource; c. That physical and/or technical constraints exist at or near the site which cause unreasonable hardship with regard to the proper installation and maintenance of said utilities underground; and/or d. The engineering design or permitting process for a project has been substantially completed and the construction of that project will be completed in a timely manner. Upon receipt of the record and information from the committee, the city council may waive the requirements of this subsection for a specific project based on the existence of the conditions listed above. The council shall conduct a review of the record of the information presented to the underground utilities review committee and its decision shall be based solely on that evidence. The decision of the council shall be final. (3) Substantial highway reconstruction projects. On all substantial roadway reconstruction or public improvement project in the areas of the city listed below, utility facilities will be installed or relocated underground in accordance with the specifications of the affected utilities and the locational requirements of the department of public works: a. The Waterfront Commercial-West (WFC-W), Waterfront Commercial-East (WFC-E), Waterfront Recreation, Conservation, Open Space (WRC), Waterfront Enterprise (WFE) and the Waterfront Residential, medium density (WRM) zoning districts as defined in the zoning ordinance; b. Main approaches into the city as described in the municipal development plan, such as the Champlain Parkway, Main Street, Riverside Avenue, Shelburne Street, and Pine Street; c. Neighborhood activity centers as defined in the municipal development plan; and d. Bike paths, view corridors and any other main approaches as delineated in the municipal development plan in effect at the time of the project. However, in these identified areas, the city shall also consider whether there is an alternative to underground placement of utilities that is more appropriate. The underground utilities review committee shall determine the placement of utilities on all such projects for these areas using all relevant considerations including, but not limited to, aesthetics, public safety, physical and technical considerations of construction, alternatives to underground placement and an analysis of the economic impacts of requiring the placement of utilities underground for the project. Any of the member departments of the underground utilities review committee or other person initiating the project, may appeal to the city council the committee’s determination that there is a more appropriate alternative placement for the utilities in the areas listed in this subsection. The council shall conduct a review of the record of the information presented to the committee and issue a decision based solely on that evidence. The council’s decision shall be final. (4) Other city streets. On all other city streets, consideration should be given to placing utility facilities underground during substantial roadway reconstruction or public improvement projects. The underground utilities review committee shall make a determination on these projects using the criteria outlined in subsection (3). Member departments of the committee or other person initiating the project, may appeal the committee’s determination to the council also as provided in subsection (3). The council’s decision shall be made based solely on the record of the evidence heard by the committee. The council’s decision shall be final. (5) Cost. In the case of any public improvement project or substantial roadway reconstruction where the placement of utility facilities underground is to be done for aesthetic or economic development purposes, the person initiating the project shall be responsible for securing the difference in cost between the placement of utility facilities above ground and their placement underground. The affected utilities shall be responsible for the costs if placement underground is being done in the best interest of service delivery. When the City of Burlington initiates a substantial roadway reconstruction for any purpose, the affected utilities shall be responsible for the underground relocation cost. (6) Utility apparatus. It is acknowledged that some utility apparatus used in connection with underground utility service, such as transformers, switches, amplifiers, equipment cabinets, and other similar equipment, may be mounted at ground level in accordance with accepted construction standards and codes and locational standards of the department of public works. (7) Emergency work. This section shall not apply to projects for the provision of temporary service or normal repairs or maintenance or for emergency services. (d) Enforcement and penalties: (1) Any person found to be in violation of any provision of this section shall be served by the city attorney with a written notice stating the nature of the violation and providing a specific time limit, of at least ten (10) working days, for satisfactory correction thereof. (2) The city may commence appropriate civil enforcement proceedings against any person who fails to correct all violations within the time provided in the notice. The city may recover fines in an amount not to exceed five hundred dollars ($500.00) for each violation. Each day’s continued violation shall be considered a separate offense. The city may also seek injunctive or other appropriate relief.
(Ord. of 5-22-95; Ord. of 2-20-01; Ord. of 4-23-01; Ord. of 6-9-03)