10.055 - OCCUPANCY OF STREETS OR OTHER PUBLIC AREAS.

(1) Street Occupancy Permit Required. Except as otherwise allowed by these ordinances, no person shall occupy, or cause to be occupied, any portion of the street, sidewalk, terrace, alleys or other public grounds for ninety (90) days or less, or in the case of 1 and 2 family homes for one hundred twenty (120) days or less, with any material or machinery without a valid street occupancy permit issued under this Section. (2) Administration. Permits under this section shall be administered by the Director of Traffic Engineering, or their designee. (Am. by ORD-23-00098, 10-26-23) (3) Permit Application. An application for a street occupancy permit shall be in writing to the City Traffic Engineer and shall describe the premises to be occupied by lot, block and/or street on or over which such material or machinery is desired to be placed, the area of occupation sought, the character of the material for which the permit is desired and the duration of the proposed occupation. The application shall identify all street trees within the proposed occupancy area and whether the trees, including their root structures, will be impacted by the proposed work. When identifying any impacted trees, the applicant must identify the species of the impacted trees and the DBH or caliper measurement of the tree, as those terms are defined in Sec. 10.105(2). The application should also note whether the proposed occupation area will require, or reasonably necessitate, the trimming, pruning or removal of any City tree. The application shall include a drawing of the proposed occupation area, the application fee, the certificate of insurance and surety bond required under Subdivision (4)(a), and an agreement to abide by all conditions set forth in Subsection (4). (Am. by ORD-23-00098, 10-26-23; Am. by ORD-25-00071, 10-16-25) (4) Permit Conditions. As a condition of a street occupancy permit issued under this Section, permittees agree to abide by the following conditions: (a) Responsibility for Occupation. 1. Liability. The permittee shall agree to be primarily liable for damages to person or property by reason of the granting of the permit and shall agree to hold harmless, defend, and indemnify the City, its officers, boards, committees, commissions, elected officials, employees and agents, from and against all liability, damages, and penalties resulting from the installation, use, maintenance, or presence of the applicant's material or machinery in the public right-of-way or other public ground as permitted under this Section. 2. Insurance. The permittee shall be required to furnish a Certificate of Insurance, providing evidence of commercial general liability insurance with the City of Madison, its officers, officials, agents and employees named as additional insureds. The insurance shall include contractual liability coverage, apply on a primary and non-contributory basis, and minimum limits of one million dollars ($1,000,000) per occurrence. The Risk Manager reserves the right to require higher limits and other coverage terms and conditions at their discretion. Permittee shall keep required insurance in full force and effect throughout the term of the street occupation permit. This insurance condition may be waived for other governmental units and in those instances where the Risk Manager, in consultation with the City Attorney's Office, determines that this requirement can be waived. (Am. by ORD-16-00105, 12-2-16) 3. Surety Bond. Before a permit is granted, the Director of Traffic Engineering may require that the applicant deliver a surety bond to the Director of Traffic Engineering guaranteeing that the permittee will remove the materials or machinery from the permitted area upon receiving notice to do so from the Director of Traffic Engineering. If required, the surety bond shall be in an amount established by the Director of Traffic Engineering, but not to exceed ten thousand dollars ($10,000). (Am. by ORD-23-00098, 10-26-23) 4. Preexisting Compliance. If evidence of the aforementioned insurance and bonding requirements set forth above is already on file with the Director of Traffic Engineering, said preexisting compliance may be deemed sufficient to satisfy the requirements of either paragraph 2. or 3. above. The Director of Traffic Engineering shall notify the applicant of their decision in that regard. (Am. by ORD-23-00098, 10-26-23) (b) Permit Length and Renewal. 1. Permit Duration. A permit issued under this Section shall be valid for the period of time stated therein, which period shall not exceed ninety (90) days, or one hundred twenty (120) days in the case of 1 and 2 family homes. 2. Permit Extension. Upon good cause shown, the Director of Traffic Engineering may extend a permit under this Section from time to time as may be reasonably required upon written application made to them for that purpose. (Am. by ORD-23-00098, 10-26-23) 3. Renewal. A permittee must submit a request to renew the permit no later than seven (7) days before the expiration of the permit. Any request made within seven (7) days or following the expiration of the permit shall be treated as a new application. (c) Occupation Limitations. 1. General. No permit shall be issued where the placing of any such material or machinery within the proposed occupation area will unreasonably interfere with the public safety and convenience, or where there is insufficient room for such material or machinery to be placed within the limits specified by this Section. 2. Roadway Occupation Limited. No permit issued under this Section shall authorize the use of more than one-third (⅓) of the traveled roadway opposite the premises of the person to whom such permit is granted. However, total street occupancy may be granted by joint agreement of the City Engineer and the Director of Traffic Engineering. (Am. by ORD-23-00098, 10-26-23) 3. Occupations Near Intersections and Driveways. No building, machinery, temporary structure or other material of any kind shall be placed within a vision clearance area as established under Sec. 27.05(2)(bb), except temporarily as otherwise allowed by this Section and Sec. 27.05(2)(bb). 4. Public Trees. No permit shall be issued where, in the determination of the City Forester, the proposed occupancy will endanger the health or welfare of an existing street tree, unless the applicant has also been granted a tree trimming, pruning or removal permit under Sec. 10.101 and/or the applicant agrees to comply with Section 107.13, the Tree Protection Specifications, of the City's Standard Specifications for Public Works Construction. (Cr. by ORD-25-00071, 10-16-25) (d) Posting of Permit. Upon issuance, the permittee shall place a copy of the permit issued by the Director of Traffic Engineering in a conspicuous place on the occupied premises, the permit to be unobstructed from public view and available for the inspectors to mark. (Am. by ORD-23-00098, 10-26-23) (e) Stormwater Considerations. No building material shall be placed in any gutter so as to obstruct the flow of water therein and every person shall, before depositing or causing to be deposited building material in any gutter, provide a suitable culvert for the entire portion of such gutter over which the building material may be laid, or cover the gutter with plank or otherwise protect the same so as to provide for the free and unobstructed flow of water therein. Water shall not be conducted over the pedestrian walkway. Any erodible material (topsoil, gravel, sand, etc.) that is stored in the permitted area shall either be covered with plastic sheeting or protected with erosion control perimeter controls. If, over the course of the occupation of the permitted area, City Engineering inspectors note that perimeter controls are not effective or are not being adequately maintained, covering of the stockpile shall be mandated. (f) Roofed Passageways and Barricades. Roofed passageways and barricades required under Section 29.10 shall require a permit issued under this Section. The failure to follow the requirements of Section 29.10 shall be cause to revoke a permit issued under this Section. (g) Storage Requirements. All material placed upon any street or alley shall be piled in a compact form. In the case of permanently improved streets that can be damaged by piled material, the applicant shall provide to the City digital photos or digital video of the area to be occupied prior to permit approval and photos of the area following restoration under Subdivision (n). The City recommends that, to minimize possible damage, the permittee place a level plank floor under all concrete, masonry, and plaster materials or store those materials on pallets. (h) Safety Considerations. Material or machinery placed in the sidewalk, street or alley shall be properly guarded by day and each separate pile of material shall be either lighted or reflective at night, in such manner as to warn all persons traveling upon the sidewalk, street or alley of the presence of such material or machinery. (i) Walkways. All walking surfaces open to the public or required by the permit must be maintained in a clean, smooth, level, hazard free, and ADA compliant manner within the occupation area. (j) Deliveries. Vehicles shall make deliveries and pick-ups without backing into areas open to the public. A properly equipped flag person shall be stationed at permitted delivery lanes for all deliveries to ensure safe ingress and egress. No deliveries will be permitted in lanes not explicitly approved in the occupancy permit or at times prohibited by the permit. (k) Parking. Parking of vehicles within the occupancy area is prohibited, although the loading and unloading of vehicles is permitted within the occupation area provided that the activity is otherwise compliant with this Section. (l) Site Maintenance. All accumulation of rubbish, debris, snow, ice or other hazards within the permitted area shall be cleaned up every day before leaving the premises. (m) Removal for Public Purpose. Any material or machinery placed in a permitted area shall be removed upon twenty-four (24) hours notice given by the Director of Traffic Engineering, City Engineer or Superintendent of Streets where a street is needed due to an emergency or critical event, or where such removal is necessary in order to repair, replace or install a street, sidewalk, terrace, alley, water facility, sewer facility or other facility that the City Engineer determines needs to be installed. (Am. by ORD-23-00098, 10-26-23) (n) Restoration. Upon either the expiration of the permit or, if the work of construction is completed before the permit expires, the completion of the work, the permitted area occupied under this Section shall be restored to its original condition and left in good repair and condition. The permittee shall be responsible for the repair of any damage noted by City staff and shall repair it to City of Madison Standard Specification for Public Works Construction. Any new or reconstructed sidewalk shall comply with Section 10.06. If the occupation resulted in the removal of a tree in the right-of-way, Permittee shall also be required to comply with Sec. 10.105. The City Traffic Engineer or City Engineer shall inspect the area upon completion of the restoration, and the permittee shall make any further repairs required by the City Traffic Engineer or City Engineer needed to address any deficiencies that did not exist prior to the occupation. If permittee does not adequately restore the permitted area as required, the City may perform any repairs or restoration and recover the costs thereof as a special charge against the adjoining property under Sec. 4.09(13). (Am. by ORD-23-00098, 10-26-23; Am. by ORD-25-00071, 10-16-25) (o) Signage Limitations. It shall be unlawful to post or attach to any roofed passageway, barricade, material, or any temporary street occupancy structure any temporary sign, bill, or placard, except that this provision shall not be construed to prevent the posting of the street occupancy permit, the building permit as required by Section 29.06, or the erection of signs denoting the owner, occupant, architect, engineer or contractors. However, such signs shall not exceed sixty-four (64) square feet in aggregate area and shall be located not less than eight (8) feet above the street grade immediately below the sign and not more than eight (8) feet above the barricade. This sign shall not be placed in such a manner as to obstruct or interfere with the vision of traffic, traffic lights, or right-of-way directional signs. (p) Traffic Signs. All signing, barricading and electric arrow boards shall be placed in conformance with the Federal Highway Administration "Manual on Uniform Traffic Control Devices" and City of Madison standards. (q) Permit Fees. All permit fees shall be paid in full prior to the issuance of the permit or any extension thereof. (r) Other Conditions. The Director of Traffic Engineering may add additional conditions, such as a traffic control plan, to a permit issued under this Section that are reasonably necessary to protect the public's health, safety and welfare, including after the issuance of the permit. (Am. by ORD-23-00098, 10-26-23) (s) Tree Protection. 1. Requirement. For any trees within the project area that are not the subject of a tree trimming, pruning or removal permit issued under Sec. 10.101, the applicant shall comply with Section 107.13, the Tree Protection Specifications, of the City's Standard Specifications for Public Works Construction, where applicable, while occupying the permitted area. 2. Penalty. In addition to revocation or suspension of the permit under Sub. (6) and the requirements of 10.105, the failure to comply with the Tree Protection Specifications as required under this Subdivision shall be subject to a forfeiture of five hundred dollars ($500), unless the violation results in the unauthorized removal of a tree, in which case the forfeiture shall be one hundred and fifty dollars ($150) per trunk diameter inch of the impacted tree, as measured or estimated at 4½ feet above the ground and rounded down to the nearest inch. Each day such violation or failure to comply continues shall be considered a separate offense. (5) Public Trees. Any trimming, pruning or removal of public trees within the permitted area will require the prior issuance of a separate permit under Sec. 10.101. The trimming, pruning or removal of any City tree without a permit issued under Sec. 10.101 or without the permission of the City Forester shall be cause to revoke a permit issued under this Section. Any tree removal is further subject to Sec. 10.105. (Am. by ORD-25-00071, 10-16-25) (6) Revocation of a Permit. The violation of any condition of a street occupancy permit that endangers the health, safety and welfare of the public, or the violation of any other ordinance while occupying the permitted area, shall be cause to revoke a permit issued under this Section. Except in the case of an immediate threat to the health, safety and welfare of the public, the Director of Traffic Engineering shall provide written notice of the revocation to the permittee who shall have no less than twenty-four (24) hours to comply with the permit requirements or other ordinance. If there is an immediate threat to the health, safety or welfare of the public, the Director of Traffic Engineering may immediately revoke the permit and shall provide written notification of this action to the permittee in a timely manner. (Am. by ORD-23-00098, 10-26-23) (7) Appeal. In the event the Director of Traffic Engineering denies an application for a street occupancy permit, imposes a special condition on the permit under Subsection (4)(r), or revokes a permit under Subsection (6), the Director of Traffic Engineering shall inform the person, in writing, of the reasons for the determination. The person may appeal this decision to the Board of Public Works within ten (10) days after mailing of the notice to the address of the person as shown on the application. Such appeal must be in writing to the City Clerk, and must inform the Board of the reasons why the person believes the decision to be in error. Failure to so appeal this decision shall result in automatic approval of the denial, special condition or revocation without further action by the Director of Traffic Engineering or the Board of Public Works. (Am. by ORD-23-00098, 10-26-23) Within thirty (30) days after receipt of the appeal, the Board of Public Works shall hold a hearing at which the person and the Director of Traffic Engineering may present and question witnesses and present oral and written argument. Within twenty (20) days after the hearing, the Board shall cause to be issued a written decision which shall affirm, reverse or modify the determination of the Director of Traffic Engineering. Appeal of the Board of Public Works' decision shall be by Certiorari to Circuit Court and shall be commenced within thirty (30) days of the date of the decision sought to be reviewed or be waived. (Am. by ORD-23-00098, 10-26-23) (8) Permit Fees. The following permit fees apply to street occupancy permits issued under this Section: (a) Application Fees. A minimum permit fee of one hundred dollars ($100) for an occupation lasting one to seven (1—7) days, a permit fee of one hundred fifty dollars ($150) for an occupation lasting eight to thirty (8—30) days, and a permit fee of two hundred dollars ($200) for an occupation lasting greater than thirty (30) days shall apply. The application fee shall be double for untimely renewals or applications made after occupation has already begun. (b) Dumpsters, Portable Storage Containers and Construction Trailers. A fee of fifty dollars ($50) shall apply, in addition to any other fees under this Section. (c) Calculation of Fees. The fees charged in paragraphs 1. through 4. are charged for each area that is occupied and are based upon the area of the City where the permitted use is located. For the purposes of this Subdivision, the "Central City" is defined as the area bounded by the Yahara River on the east, Lake Mendota on the north, Park Street on the west, and Regent Street, Proudfit Street and Lake Monona on the south. The fees shall be charged for every twenty-five (25) feet of street front thereof that is to be temporarily occupied or used, based upon the period of occupation (1—7 days, 8—30 days, each 30 day successive period). Fees for occupancy of parking lanes and traffic lanes are based on the classification of the street, as indicated on the street classification map maintained by the Director of Traffic Engineering. (Am. by ORD-23-00098, 10-26-23) 1. Sidewalks. For the temporary occupancy of all of a sidewalk area, including by a roofed passageway, or an occupancy that results in a sidewalk that is less than five (5) feet wide at any point, where no temporary walkway is provided on the same side of the street, the fee is: Non Central City | Central City 1 - 7 Days | 8 - 30 Days | Each Successive 30 Days | 1 - 7 Days | 8 - 30 Days | Each Successive 30 Days Arterial St | $52.00 | $104.00 | $104.00 | $65.00 | $130.00 | $130.00 5' min Ped Access | $26.00 | $52.00 | $52.00 | $32.50 | $65.00 | $65.00 Collector St | $36.40 | $72.80 | $72.80 | $45.50 | $91.00 | $91.00 5' min Ped Access | $18.20 | $36.40 | $37.00 | $22.75 | $45.50 | $45.50 Local St | $26.00 | $52.00 | $52.00 | $32.50 | $65.00 | $65.00 5' min Ped Access | $13.00 | $26.00 | $26.00 | $16.25 | $32.50 | $32.50 2. Terraces. For the temporary occupancy of all or a portion of the terrace area, where the terrace is not available for public use, the fee is: Non Central City | Central City 1 - 7 Days | 8 - 30 Days | Each Successive 30 Days | 1 - 7 Days | 8 - 30 Days | Each Successive 30 Days Arterial St | $12.00 | $24.00 | $24.00 | $15.00 | $30.00 | $30.00 Collector St | $8.40 | $16.80 | $16.80 | $10.50 | $21.00 | $21.00 Local St | $6.00 | $12.00 | $12.00 | $7.50 | $15.00 | $15.00 3. Parking Lanes. For the temporary occupancy of all or a portion of a parking lane, where the parking lane is not available for public use, the fee is: Non Central City | Central City 1 - 7 Days | 8 - 30 Days | Each Successive 30 Days | 1 - 7 Days | 8 - 30 Days | Each Successive 30 Days Arterial St | $22.00 | $44.00 | $44.00 | $27.50 | $55.00 | $55.00 Collector St | $15.40 | $30.80 | $30.80 | $19.25 | $38.50 | $38.50 Local St | $11.00 | $22.00 | $22.00 | $13.75 | $27.50 | $27.50 4. Traffic Lanes and Alleys. For the temporary occupancy of all or a portion of a traffic lane or alley, where the traffic lane or alley is not available for public use, the fee is: Non Central City | Central City 1 - 7 Days | 8 - 30 Days | Each Successive 30 Days | 1 - 7 Days | 8 - 30 Days | Each Successive 30 Days Arterial St | $42.00 | $84.00 | $84.00 | $52.50 | $105.00 | $105.00 Collector St | $29.40 | $58.80 | $58.80 | $36.75 | $73.50 | $73.50 Local St | $21.00 | $42.00 | $42.00 | $26.25 | $52.50 | $52.50 (9) Public Utility Right-of-Way Occupancy Permit. (a) Definitions. For the purpose of this Subsection, the definitions provided for in Section 10.05(1)(b) apply, except as to the following: Department means the Traffic Engineering Division. Registered Public Utility means a public utility that is registered with the City under Section 10.05(2). (b) Intent. The right-of-way is intended to be primarily a transportation corridor and the City must ensure that the needs of the various right-of-way users are balanced, while protecting the health, safety and welfare of the public. Under Wis. Stat. Secs. 86.16, 182.017, and 196.58, and Wis. Admin Code Ch. PSC 130, public utilities have a right to use the right-of-way, but this right is subject to the City's right to enact reasonable regulations over the use of this shared space. As the City grows and technology advances, the City has been faced with significant competing demands on the use of the right-of-way. Public utility work that interferes with the public's use of the right-of-way may affect the City's traffic patterns throughout the area, create safety concerns, and impact the City's ability to provide emergency services, depending on the type of road, the day of the week and the time of the occupation. By requiring permittees under this Subsection to comply with the City's approved Traffic Control Policy when temporarily occupying the right-of-way, the City will be protecting the health, safety and welfare of the public, while also recognizing the interests of the public utilities in performing such work. (c) Permit. 1. Applicability. As an alternative to a Street Occupancy Permit issued under this Section 10.055, a registered public utility may obtain a Public Utility Right-of-Way Occupancy Permit under this Subsection, which permit will allow the public utility, its contractors and subcontractors, to temporarily occupy the public right-of-way, subject to the conditions set forth in this Subsection. 2. Application. An application for a permit under this Subsection, or a request to renew a permit issued under this Subsection, shall be in writing to the Director of Traffic Engineering and include the annual permit fee and an agreement to abide by all conditions set forth in Paragraph 5. (Am. by ORD-23-00098, 10-26-23) 3. Review and Approval. In reviewing an application for a permit under this Subsection, or a request to renew a permit issued under this Subsection, the Director of Traffic Engineering shall ensure that the public utility's annual registration under Sec. 10.05(2) is up to date and that all necessary information under this Subsection has been provided. Unless any fees or costs remain unpaid, or the registered public utility, and its contractors or subcontractors, has demonstrated an unwillingness or inability to routinely comply with the conditions of this Subsection or other City-issued permits, the permit shall be granted. (Am. by ORD-23-00098, 10-26-23) 4. Permit Length and Renewal. A permit issued under this Subsection shall be valid for one calendar year. A permittee may submit a request to renew the permit no later than December 15 of the expiring year. 5. Permit Conditions. As a condition of a permit issued under this Subsection, the permittee agrees to abide by the following conditions: a. Traffic Control Policy. In occupying the right-of-way pursuant to a permit issued under this Subsection, the permittee is required to comply with the City's approved Traffic Control Policy. The Traffic Control Policy shall be prepared by the Director of Traffic Engineering, in consultation with public utilities, and shall approved by the Board of Public Works. The Traffic Control Policy may be updated from time-to-time. (Am. by ORD-23-00098, 10-26-23) i. Contents of Policy. The Traffic Control Policy may provide standard operating procedures for the permittee to follow for routine public utility maintenance and operational activities. The Policy may differentiate between the classification of the right-of-way (local, collector, arterial), day of the week, time-of-day, area of work (travel lanes, parking lanes, terrace, sidewalk, bike lanes or bike path), and other relevant criteria as determined by the Director of Traffic Engineering. The Traffic Control Policy may require that the permittee provide the City advance notice of work in certain situations, and may require that specific traffic control plans be submitted for approval for work in certain situations. (Am. by ORD-23-00098, 10-26-23) ii. Traffic Control Measures. Traffic control measures for all work performed under the Public Utility Right-of-Way Occupancy Permit and the Traffic Control Policy shall adhere to standards set forth in the Work Zone Safety handbook and the MUTCD Guidance on Temporary Traffic Control. In addition, the Director of Traffic Engineering may supplement and add additional requirements to these standards through the Madison Traffic Engineering Addendum, provided that this Addendum is published and made publicly available to permit applicants at the time the annual permit is granted by the City, or to permittees within thirty (30) days of any updates or amendments thereto. (Am. by ORD-23-00098, 10-26-23) b. Removal for Public Purpose. Any material or machinery placed in the right-of-way under the Public Utility Right-of-Way Occupancy Permit must be removed upon twenty-four (24) hours notice given by the Director of Traffic Engineering, City Engineer or Superintendent of Streets where the right-of-way is needed due to an emergency or critical event, or where such removal is necessary in order to repair, replace or install a street, sidewalk, terrace, alley, water facility, sewer facility or other facility that the City Engineer determines needs to be installed. (Am. by ORD-23-00098, 10-26-23) c. Restoration. Upon the completion of work in the right-of-way, the area occupied under a permit granted under this Subsection shall be restored to its original condition and left in good repair and condition. The permittee shall be responsible for the repair of any damage noted by City staff and shall repair it to City of Madison Standard Specification for Public Works Construction. If necessary, the Director of Traffic Engineering or City Engineer shall inspect the area upon completion of the restoration and the permittee shall make any further repairs required by the Director of Traffic Engineering or City Engineer needed to address any deficiencies that did not exist prior to the occupation. If permittee does not adequately restore the area as required, the City may perform any repairs or restoration and recover the costs thereof by any lawful means available. A permit may not be granted or renewed under this Subsection if a public utility owes outstanding restoration costs under this Subparagraph. (Am. by ORD-23-00098, 10-26-23) d. Compliance. In occupying the right-of-way under a Public Utility Right-of-Way Occupancy Permit, the permittee is required to obtain and possess all other necessary permits, licenses, and authority, and to pay all fees required by any other City, County, State, or Federal rules, laws or regulations. The permittee, and its contractors and subcontractors, shall perform all work in conformance with all applicable codes and established rules and regulations, including the City of Madison Standard Specifications for Public Works Construction if applicable, and is responsible for all work done in the right-of-way pursuant to its permit, regardless of who does the work. The permittee shall at all times maintain compliance with all applicable Federal, State, and local laws, regulations, and other rules, including those requirements of Section 10.05 and this Section. e. Contact Information. The permittee shall at all times maintain with the City accurate contact information for the permittee, which shall include a phone number, mailing address, and email address for at least one natural person. f. Liability. The permittee shall agree to be primarily liable for damages to person or property by reason of the granting of the permit and shall agree to hold harmless, defend, and indemnify the City, its officers, boards, committees, commissions, elected officials, employees and agents, from and against all liability, damages, and penalties resulting from the occupation of the right-of-way as permitted under this Subsection. g. Insurance. The permittee shall be required to furnish a Certificate of Insurance, providing evidence of commercial general liability insurance with the City of Madison, its officers, officials, agents and employees named as additional insureds. The insurance shall include contractual liability coverage, apply on a primary and non-contributory basis, and minimum limits of one million dollars ($1,000,000) per occurrence. The Risk Manager reserves the right to require higher limits and other coverage terms and conditions at their discretion. Permittee shall keep required insurance in full force and effect throughout the term of the Public Utility Right-of-Way Occupancy Permit. This insurance condition may be waived for other governmental units and in those instances where the Risk Manager, in consultation with the City Attorney's Office, determines that this requirement can be waived. h. Permit Fee. There is an annual fee for a Public Utility Right-of-Way Occupancy Permit issued under this Subsection, and additional fees may be imposed, as provided for under the Traffic Control Policy, for the review of certain proposed activities. The fees imposed under this Subparagraph shall be established by the Board of Public Works and shall be sufficient to recover the City's costs to administer the permit issued under this Subsection. The annual permit fee shall be paid at the time of the permit application or request to renew. 6. Suspension; Revocation. If non-compliance with the conditions of a permit issued under this Subsection endangers the health, safety and welfare of the public, the Director of Traffic Engineering may find it necessary to suspend or revoke the permit and require that the public utility obtain a Street Occupancy Permit for any necessary work. Any such suspension or revocation shall be made in writing. (Am. by ORD-23-00098, 10-26-23) 7. Appeal. The registered public utility aggrieved by a decision of the Department revoking, suspending, refusing to issue or refusing to renew a permit may file a request for review with the Board of Public Works. A request for review shall be filed within ten (10) days of the decision being appealed. Following a hearing, the Board of Public Works may affirm, reverse or modify the decision of the Department. (10) Penalty. Any person who fails to comply with any of the requirements of this Section shall upon conviction be subject to a forfeiture of not less than twenty-five dollars ($25) nor more than one thousand dollars ($1,000). Each day or portion thereof such violation continues shall be considered a separate offense. (Renumbered by ORD-23-00065, 6-30-23, eff. 8-1-2023)

(Cr. by ORD-25-00071, 10-16-25) (Cr. by ORD-23-00065, 6-30-2023, eff. 8-1-2023) (Section 10.055 Cr. by ORD-15-00036, 4-8-15; Am. by ORD-17-00002, 1-12-17; Am. by ORD-18-00123, 12-3-18)