For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.28.12 — Industrial wastewater discharge permit conditions

Code of Ordinances, City of North Las Vegas, Nevada (Supp. No. 146: codified through legislation passed and adopted on or before August 5, 2026) · North Las Vegas Municipal Code § 13.28.12

Corpus is an independent public-information project, not the official City of North Las Vegas website. Stable reference: corpuslaw.us/code/4d57c461-74f2-4c1b-989a-057812308a47

13.28.12 - Industrial wastewater discharge permit conditions.

Industrial wastewater discharge permits shall be expressly subject to all provisions of this chapter and all other applicable regulations, user charges and fees established by the city. A. Permits shall contain the following: 1. A statement that indicates the permit's issuance date, expiration date and effective date; 2. A statement on permit transferability; 3. Effluent limits, including best management practices, based upon applicable pretreatment standards; 4. Self-monitoring, sampling, reporting, notification and record-keeping requirements including, but not limited to, identification of the pollutants or BMPs to be monitored, sampling location, sampling frequency and sample type, based on federal, state and local law; 5. Statements of applicable administrative, civil and criminal penalties for the violation of pretreatment standards and requirements, the permit, this chapter, and any applicable compliance schedule; 6. Requirements to immediately notify the city of any changes at its facility affecting potential for a slug discharge and for the industrial user to immediately report any slug discharges, spills or accidental discharges, including any discharges that may cause problems at the POTW; B. Permits may also include, as appropriate: 1. Applicable schedule of user charges and fees for the wastewater to be discharged into a public sewer; 2. Limits on average and maximum rate and time of discharge or requirements for flow; 3. Requirements for installation and maintenance of inspection and sampling facilities and equipment; 4. Best management practices (BMPs) to control specific pollutants as necessary to meet the objectives of this chapter; 5. Compliance schedules; 6. Requirements to reapply for a new permit prior to expiration of the existing permit; 7. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; 8. Closure requirements for permitted facilities undergoing partial or complete closure activities to ensure closure activities are completed and wastes have been properly disposed and remaining access to sanitary and storm sewers are protected; 9. Other conditions as deemed appropriate by the director to ensure compliance with all applicable local, state and federal rules and regulations.

(Ord. No. 2771, § 1, 10-5-2016)

Ask a question about North Las Vegas law

Corpus searches the North Las Vegas sections it holds and shows the ones that match, with their citations. Free, no sign-in.