§ 28-6 — Procedure for approval of final plat and construction detail drawings
Code of Ordinances, City of Burlington, Vermont (Current through Ord. 8-3-26, passed August 3, 2026) · Burlington Code of Ordinances § 28-6
Corpus is an independent public-information project, not the official City of Burlington website. Stable reference: corpuslaw.us/code/4d77a198-6f0f-465c-aab8-c218828367fc
28-6 Procedure for approval of final plat and construction detail drawings.
(a) Application for approval of final plat: During such time that an approved preliminary plat remains effective, the subdivider may seek approval of his final plat by filing the following items with the administrative officer: (1) A letter requesting review and approval of the final plat and giving the name and addresses of person(s) to whom notice of the hearing by the development review board thereon shall be sent. (2) Ten (10) copies of the final plat, with one of such copies being the original drawn in black permanent and actinic inks on reproducible linen tracing cloth, one hundred (100) percent rag content linen record paper or three (3) to five (5) mil stable-base polyester film. Upon receipt of the plats, the administrative officer shall date each and distribute a copy to the city officials listed in subsection 28-5(b). At least two (2) copies shall be retained by the administrative officer. (3) Ten (10) copies of construction detail drawings of the sewer, water and drainage systems, other underground utilities, surface improvements, street profiles and street cross-sections as specified in subsection 28-6(e). The administrative officer shall date each copy of such drawings and distribute a copy to the city engineer and the superintendent of each affected city department. Two (2) copies shall be reserved for use by private utilities and two (2) copies shall be retained by the administrative officer. (b) Within fourteen (14) days of the submission of a final plat, the development review board shall set the date of a public hearing thereon. (c) Legal data required: In addition to the items listed in subsection (a) hereof, the subdivider shall submit the following executed documents to the administrative officer at the time of application for approval of the final plat. (1) Engineer’s certification as follows: "It is hereby certified that this plat fully complies with all engineering requirements set forth in the subdivision regulations of the City of Burlington and all other engineering requirements of Burlington, Vermont." By: _____________ | Registered ________ Seal ______________ (2) Surveyor’s certification as follows: "It is hereby certified that this plat is true and correct and was prepared from an actual survey of the property by me or under my supervision; that all monuments shown hereon actually exist or are marked as "future," and their location, size, type and materials are correctly shown." By: _____________ | Registered ________ Seal ______________ (3) Subdivider’s certification as follows: State of Vermont, County of Chittenden, City of Burlington "The owner of the land shown on this plat and whose name is subscribed hereto, in person or through a duly authorized agent, certifies that this plat was made from an actual survey, and that all taxes or other assessments now due on this land have been paid." ________________ | ________________ Agent | Owner ________________ | ________________ Date | Date (4) Certificate of dedication: A certification by the subdivider setting forth the description of the areas and improvements he is dedicating to the public and the extent of the title which he is dedicating. (5) Text of protective covenants whereby the subdivider proposes to regulate land use in the subdivision and otherwise protect the proposed development. (6) Certificate of the city engineer, as follows: "I, ____________, City Engineer, do hereby certify that the subject plat has been examined by me and found to comply with the engineering requirements set forth in the regulations governing plats of subdivided land adopted by the city council, with the following exceptions:" _______________ City Engineer (7) Certificate of the superintendent of parks as follows: "I, ____________, Superintendent of Parks, do hereby certify that the subject plat has been examined by me and found to comply with the street planting requirements and park area requirements set forth in the regulations governing plats of subdivided land adopted by the city council, with the following exceptions:" __________________________ City Superintendent of Parks (8) Certificate of the fire marshal as follows: "I, ____________, Fire Marshal, do hereby certify that the subject plat has been examined by me and found to comply with the fire prevention requirements set forth in this chapter governing plats of subdivided land adopted by the city council with the following exceptions:" _________________ City Fire Marshal (9) Any other certificate as may be reasonably required by the development review board to carry out the purpose and intent of these regulations. Upon receipt, the administrative officer shall forward such documents to the city attorney who shall advise as to their form and legal sufficiency. (d) Final plat specifications: The final plat shall be prepared by a registered professional engineer or land surveyor and shall be legibly drawn in permanent and actinic black inks upon linen tracing cloth or similar permanent material. The plan shall be at a scale of one inch equals forty feet (1"=40'). In addition such other scale as the board may require to show details clearly and adequately shall be included. Sheet sizes shall be twenty-four (24) inches by thirty-six (36) inches with one inch margins on three (3) sides and a two (2) inch margin on the side to be bound. If multiple sheets are used, they shall be accompanied by an index sheet referencing the entire final plat. The final plat shall contain all information required on the preliminary plat, updated and accurate, together with the following information: (1) Existing and proposed lines of streets, ways, lots with areas of each, dimensions and areas of easements, parks and other property within the subdivision to be dedicated for public use. (2) Location, width and final grade of proposed streets. (3) Sufficient data including the length, radii and central angles of all curves to determine readily the location, bearing and length of every street and right-of-way, lot line and boundary line and to reproduce same on ground; all bearings to be referred to magnetic meridian. Wherever a boundary line of the subdivision is within five hundred (500) feet of a Vermont Coordinate Survey Monument, the survey of the subdivision shall be tied to said monument(s). The error of closure must not exceed one to fifteen thousand (15,000); traverse streets or a copy thereof showing error of closure of the field surveys and the calculations for final adjustment must be submitted to the office of the city engineer for approval. (4) Location of all permanent monuments, properly identified as to whether existing or proposed. The distance and bearing to the nearest municipal, county or state monument on an accepted way and monuments at all points of curvature and changes in direction of street right-of-way lines or where designated by the city engineer. (5) Location, names and present widths of streets bounding, approaching or within reasonable proximity of the subdivision and street lines of the access street leading from the subdivision to the nearest accepted public street. (6) Lot numbers, proposed house numbers and areas of other adjoining land of applicant not included in subdivision. (7) Minimum front and side street building setback lines shall be shown and dimensioned in accordance with the applicable zoning ordinance requirements. (8) Subsurface conditions of the tract, location and results of tests made to ascertain subsurface soil rock and ground water conditions and depth to ground water, as may be reasonably required to carry out the purposes and intent of these regulations. (9) Proposed surface water drainage pattern for each individual block, and street including an updated proposed grading plan. (10) Trees of over eight-inch caliper. (11) Location of all the following improvements unless specifically waived in writing by the board: street paving, sidewalks, curbs, utilities above and below ground, fire hydrants, street trees, street signs, street lighting standards, storm drainage, all easements and fire alarm boxes. (12) Legend denoting any signs and symbols used on the plan and not otherwise explained. (13) A certificate for notation of final plat approved by the development review board, directly on the plat as follows: APPROVED BY RESOLUTION OF THE CITY OF BURLINGTON DEVELOPMENT REVIEW BOARD, VERMONT, ON THE _______________ DAY OF ________________, 20_____________ SUBJECT TO ALL REQUIREMENTS AND CONDITIONS OF CHAPTER 28 ENTITLED SUBDIVISION REGULATIONS OF THE BURLINGTON, VERMONT, CODE OF ORDINANCES, SIGNED THIS ________________ DAY OF ________________, _____________ BY _________________ | _________________ Witness | Chairman _________________ | _________________ (e) Construction detail drawings: All submitted applications for final plat approval must likewise have construction detail drawings consisting of the following: (1) Plans and profiles showing existing and proposed elevations along centerlines of all streets within the subdivision. (2) Plans and profiles showing location of street pavements, curbs, gutters, sidewalks, manholes, catchbasins, culverts and existing intersecting walks and driveways. (3) Typical cross-sections of improved streets indicating the material used for construction of the roadbed and surface sidewalk, curbing and tree belt, tree pit and showing centerline right-of-way width, width of pavement and travel lanes, height of crown, curb reveal, and any other pertinent information. (4) Plans and profiles of the storm drainage system showing the location, pipe size and invert elevations of existing and proposed storm drains together with invert and rim elevations of all catchbasins and manholes. Surface elevation and approximate depth of water shall be shown at each point where drainage pipe ends at a waterway. Drainage calculations prepared by the applicant’s engineer, including design criteria used, drainage area and other information shall be sufficient for the city engineer to determine the size of any proposed drain, culvert or bridge. (5) Plans and profiles of the sanitary sewer system showing the location, pipe size and invert elevations of existing and proposed sewage system together with invert and rim elevations of all manholes. All lots within the proposed subdivision shall be serviced by the municipal sewerage system. Where a gravity flow of sewage cannot be attained, the subdivider shall install a pumping or lift station of a make and type specified by the sewage disposal superintendent to provide for the proper disposal of all waste into the existing sanitary systems. The subdivider shall covenant that one year after the pumping station has been installed and found to function to the satisfaction of the sewage disposal superintendent said pumping station shall be deeded to the city and thereafter shall be maintained and operated by the sewage disposal department. (6) Plans and profiles of the water supply system showing the location, pipe size and invert elevations of the subdivision water system. All lots within the proposed subdivision shall be supplied by the municipal water system. (7) All profiles shall be drawn with: (A) A horizontal scale of one inch to forty (40) feet and a vertical scale of one inch to four (4) feet. (B) Existing centerline in fine black line with elevation shown every fifty (50) feet. (C) Proposed centerline grades in heavier black line with elevations shown at every fifty (50) foot station except that in vertical curves elevations shall be shown at twenty-five (25) foot station. All changes in street grade shall be shown by a tangent to the vertical curve with the grade of the tangent indicated at the point of tangency. (D) Cross-sections at every fifty (50) foot station or any unusual section as is common practice in the design of roadways by the Vermont Department of Highways. (E) Existing right-of-way line in fine black dash line. (F) Proposed right-of-way line in fine black dotted line. (G) All elevations based on the U.S. Coast and Geodetic Survey bench marks. Requirements 1—6 of such construction detail drawings must be approved by the city engineer prior to approval of the final plat by the development review board. (f) Final approval of construction detail drawings: Final approval of the complete set of construction detail drawings shall consist of a letter of approval from the development review board, therein stating: (1) Type of improvement(s) covered by the plan. (2) Name of the designing engineer. (3) Date of preparation and revision if any. Prior to such final construction detail drawings approval, the development review board may recommend, or may require upon recommendation of the city engineer such changes or revisions as are deemed reasonably necessary to carry out the purposes and intent of these regulations. (g) Notice of public hearing on final plat: Within thirty-five (35) days of the date the final plat is submitted, a public hearing thereon shall be held by the development review board. The public hearing shall be advertised in a local newspaper with general circulation throughout the city and notice shall be posted in one or more public places in the city at least fifteen (15) days prior to the hearing. The notice shall describe the location of the proposed subdivision, the name of the applicant and the time and place of the hearing. It shall specifically state the hearing is on the subdivider’s proposed final plat. On the day of publication, a copy of said notice shall be sent by first class mail to the applicant and to all owners of land abutting the proposed subdivision. If the subdivision shall be located within five hundred (500) feet of a municipal boundary, a copy shall be sent to the regional planning commission and to the clerk of the affected municipality at least fifteen (15) days prior to the hearing. If deemed necessary, the development review board may recess the public hearing, to be reconvened at a later date, time, place announced during said hearing without having to readvertise and repost a notice of such recessed hearing. (h) Development review board approval of final plat: The administrative officer shall check the final plat for conformance with this chapter and report his findings and recommendations together with the findings and recommendations of the other city officials whose departments are affected by the proposed subdivision to the development review board. Thereafter the development review board shall, within forty-five (45) days from the close of the public hearing on the final plat, approve, with modifications, or disapprove the final plat. A notation of the action shall be made on the original tracing and two (2) copies of the final plat. If the final plat is approved or approved with modifications, the chairman or the person designated by resolution by the development review board shall sign the plat certificate. The original or a reproducible copy thereof shall be retained by the board for its records. In the case of approval with modification, the modifications shall be included in the minutes of the meeting. A copy of the applicable minutes shall accompany the original tracing and each print of the final plat. If the final plat is disapproved, grounds for such action shall be stated in the board minutes with a copy of said minutes included in a letter advising the subdivider of the disapproval of the plat. In the case of denial of the final plat, a minimum of six (6) months must elapse, commencing from the date of denial, before the subdivider may resubmit the subdivision plans for review by the development review board. If action on the final plat is not taken by the development review board within forty-five (45) days from the public hearing, the final plat shall be considered approved and a certificate of approval shall be issued on demand. However, the applicant may waive this requirement and consent to an extension of time, provided such waiver is received in written form. Before approving a final plat, the development review board shall obtain a memorandum from the city attorney that approved bond, or security, pursuant to T. 24 Sections 4416, 4417 of the Vermont Statutes Annotated has been posted to insure completion of all required improvements. (i) Filing of approved final plat: After a final plat has been approved, the subdivider shall: (1) File a permanent copy sheet size either eleven (11) inches by seventeen (17) inches or eighteen (18) inches by twenty-four (24) inches drawn in black permanent and actinic ink on linen tracing cloth or other similar reproducible material or reduced copy thereof with the city clerk within ninety (90) days from the date of approval. Failure to so file within ninety (90) days shall render void the final plat approval. Prior to the acceptance of the final plat by the city clerk, the city engineer shall check the copy to be filed to ascertain that it is as approved. A plat shall become void if changes are made to it after the board has endorsed the same in writing. Any person altering or attempting to alter any plat subsequent to final development review board approval shall be guilty of a misdemeanor and upon conviction thereof shall be subject to a fine not to exceed two hundred dollars ($200.00). After filing with the city clerk, the plat shall become part of the official map. (2) File one approved print with the building inspector before building permits are made available. (3) File one approved print with the city assessor.
(Ord. of 10-16-00)