Repair of sunken pavement over excavation.
Gulfport Code of Ordinances § 7-264
in effectSec. 7-264. - Repair of sunken pavement over excavation.
If the subsurface material or pavement over or within the trench influence area associated with an area of construction or work in a permit becomes depressed or broken at any time within two (2) years after the excavation has been completed and accepted and before resurfacing of the city street or at any time prior to such time as the street surface is completely resurfaced, the bond shall be used to cover the costs of the repair and the person or persons who excavated the area as well as those who were responsible for the excavation, including, but not limited to, the permittee, shall be liable for any and all remaining costs arising out of such repair.
(Ord. No. 2644, § 2-15, 9-22-09)
Source: City of Gulfport, Mississippi, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/ms/gulfport/codes/code_of_ordinances?nodeId=PTIICOOR_CH7OFMIPR_ARTVISTTRRI-WMA_S7-264RESUPAOVEXFetched: 11/1/2026
