For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 55-142 — Pretreatment of wastewater

Code of Ordinances, City of Corpus Christi, Texas (Supp. No. 44: codified through Ordinance No. 033940, enacted June 2, 2026) · Corpus Christi Code of Ordinances § 55-142

Corpus is an independent public-information project, not the official City of Corpus Christi website. Stable reference: corpuslaw.us/code/4ea8da26-cdb5-44bb-b10e-38279b4a6878

Sec. 55-142. - Pretreatment of wastewater.

(a) Pretreatment facilities. Industrial users shall provide necessary wastewater treatment as required to comply with this article and shall achieve compliance with all categorical pretreatment standards, local limits and the prohibitions set out in subsection 55-141(a) within the time limitations specified by the EPA, the state, or the director, whichever is more stringent. Any facilities required to pretreat wastewater to a level acceptable to the city shall be provided, operated, and maintained at the industrial user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the city for review and shall be acceptable to the city before construction of the facility. The review of such plans and operating procedures will in no way relieve the industrial user from the responsibility of modifying the facility as necessary to produce an acceptable discharge to the city under the provisions of this article. (b) Additional pretreatment measures. (1) Whenever deemed necessary, the director may require industrial users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage wastestreams from industrial wastestreams and such other conditions as may be necessary to protect the POTW and determine the industrial user's compliance with the requirements of this article. (2) The director, in his discretion, may require each person discharging into the POTW greater than twenty-five thousand (25,000) gallons per day or greater than five (5) per cent of the average daily flow in the POTW, to install and maintain, on his property and at his expense, a suitable storage and flow control facility to insure equalization of flow, the design and regulation of which shall be directed by the director. A wastewater discharge permit may be issued solely for flow equalization. (3) Grease, oil and sand interceptors shall be provided in comportment with chapter 14 of this Code, as such provision stands and may hereafter be modified or amended. (4) Industrial users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter. (c) Accidental discharge/slug control plans. The director may require any industrial user to develop and implement an accidental discharge/slug control plan. Within one (1) year of designation as a significant industrial user, the director shall evaluate whether each significant industrial user needs such a plan. Users shall retain, and make available for inspection and copying, all record of activities associated with slug control evaluation and results. Any industrial user required to develop and implement an accidental discharge/slug control plan shall submit a plan which addresses, at a minimum, the following: (1) Description of discharge practices, including nonroutine batch discharges. (2) Description of stored chemicals. (3) Procedures for immediately notifying the POTW of any accidental or slug discharge. Such notification must also be given for any discharge which would violate any of the prohibited discharges in subsection 55-141(a) of this article. a. Telephone notices. At minimum, such plan shall require the user to immediately telephone and notify the POTW of an accidental or slug discharge. Such verbal notice shall include location of discharge, type of waste concentration and volume, and corrective actions. b. Written report. Within five (5) days following an accidental discharge, the user shall submit to the city a detailed written report describing the nature and cause of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expenses, loss, damage, or other liability which may be incurred as a result of damage to the POTW, fish kills, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed by this article or other applicable law. c. Notice to employees. As part of the accidental discharge protection plan, the director may require a notice to be permanently posted on the user's bulletin board or other prominent place advising employees whom to call in the event of a dangerous discharge. Employers shall ensure that all employees who may cause or suffer such a dangerous discharge to occur are advised of the emergency notification procedures. (4) If necessary, procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. (d) Tenant responsibility. Where an owner of property leases premises to any other person as a tenant under any rental or lease agreement, if either the owner or the tenant is an industrial user, either or both may be held responsible for compliance with the provisions of this article. (e) Hauled wastewater. Septic tank waste may be accepted into the POTW at a designated receiving structure within the treatment plant area at such times as are established by the director, provided such waste disposal is made in compliance with article XIII, section 55-160 et seq., of this Code, and does not violate any provision of section 55-141 of this article or any other requirements of the city. (f) Vandalism. No person shall maliciously, willfully or negligently break, damage, destroy, uncover, deface, tamper with or prevent access to any structure, appurtenance or equipment, or other part of the POTW. Any person found in violation of this requirement shall be subject to the sanctions set out in section 55-146, below.

(Ord. No. 21666, § 1, 6-1-1993; Ord. No. 25377, § 7, 7-22-2003; Ord. No. 031700, § 3, 3-19-2019; Ord. No. 032342, § 1, 2-9-2021)

Ask a question about Corpus Christi law

Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.