17.60.040 - Application Preparation and Filing
The preparation and filing of applications for land use permits, amendments (e.g., General Plan and Zoning Map), and other matters pertaining to this Zoning Code shall comply with the following requirements.
A. Standard procedures. The standard procedures contained in this Section apply to all applications for discretionary permits required under this Zoning Code and under Municipal Code Title 16 (Subdivision Ordinance).
B. Compliance with procedures. All permits shall be processed in compliance with the standard procedure, except as otherwise provided by this Zoning Code, or State or Federal law.
C. Predevelopment plan review.
1. Purpose. The purposes of a predevelopment plan review are to:
a. Achieve better projects through early consultation between City staff and applicants;
b. Coordinate reviews of projects among City staff and City departments;
c. Familiarize applicants for the projects with the regulations and procedures that apply to the projects;
d. Avoid significant investment in the design of a project without preliminary - directions from City staff;
e. Identify issues that may arise during review of the projects (e.g., conformance with any applicable design guidelines, conformance with the goals, policies, and objectives of the General Plan and the purpose and intent of any applicable specific plan, environmental requirements and possible recommended mitigation measures, possible recommended conditions of approval, requirements for public improvements, and possible concerns from adjoining neighborhoods);
f. Provide opportunities for discussion about the projects and an exchange of information on potential issues between City staff and the applicants for the projects; and
g. Inform the Council of proposed development projects defined in the administrative guidelines to be of communitywide significance.
2. Applicability.
a. Mandatory review. A predevelopment plan review shall be required based on the thresholds in Table 6-2 below:
TABLE 6-2 - THRESHOLDS FOR PREDEVELOPMENT PLAN REVIEW
Project Type | Threshold
1. Affordable Housing Units on Religious Facility sites | When new construction is proposed in compliance with Section 17.50.230.F.
2. General Plan Land Use Diagram or Zoning Map Amendment | When new construction is proposed.
3. Hillside Development (HD) overlay districts | New residential structures on lots with an average slope greater than 15% and the project requires a Hillside Development Permit in compliance with Section 17.61.050.
4. Master Plans or Master Plan Amendments | When new construction is proposed.
5. Nonresidential construction | Greater than 25,000 square feet of new gross floor area (including the nonresidential gross floor area of mixed-use projects).
6. Street vacations | When new construction is proposed.
7. Subdivisions | a) HD overlay district: Any subdivision of land; or b) Other districts: Subdivision of land into five or more lots.
8. Other projects as determined by the Director to be of major importance to the City | Factors that might lead to this determination include: a) Greater than 75 residential units. b) Non-conformity with the General Plan, Specific Plan(s) and/or Zoning Code; and c) Adverse impacts on historic structures, traffic, trees, open space, utilities and similar factors.
b. Optional review. A predevelopment plan review shall be conducted if requested by an applicant for a multi-family project consisting of more than ten dwelling units or any other project that would require a discretionary land use entitlement.
3. Procedures.
a. Scheduling. A predevelopment plan review shall be conducted before deeming an application complete, in compliance with Section 17.60.060 (Initial Application Review), below. However, the Director may authorize subsequent phases of a predevelopment plan review to be conducted after the application is deemed complete.
b. Applicable/responsible staff. The City Manager, or designee, shall determine which City departments shall participate. The Director shall designate the staff person(s) to be responsible for conducting the predevelopment plan review.
c. Disclaimer. Neither the predevelopment plan review nor information or pertinent policies provided by the City Departments shall be construed as a City recommendation for approval or disapproval of the application/project.
d. Written report. A written report containing the results of the predevelopment plan review and the staff comments on the project shall be provided to the applicant.
e. Meeting. The staff person(s) responsible for conducting the predevelopment plan review may require, and an applicant may request, a meeting with the applicant and applicable/responsible City department staff to present and discuss the written report.
f. Projects of Communitywide Significance. A summary of the written report shall also be forwarded to the Council. If the Director or a member of the Council requests the predevelopment plan review be presented to the Council, it shall only be for the purpose of informing the Council and the public of a proposed project, and not for the purpose of discussing the merits of the proposed project.
4. Administrative guidelines. The City Manager, or designee, shall issue administrative guidelines for implementation of the predevelopment plan review process.
D. Application contents and fee. The Director shall establish in writing the submittal requirements for permit applications required by this Zoning Code. All applications shall include the following submittal materials, as well as any additional materials identified by the Director:
1. A signed application form;
2. The application fee, if required, in compliance with the Council's Fee Resolution;
3. A completed environmental assessment form if the project is subject to the California Environmental Quality Act (CEQA), unless the form has been submitted with a previous application for the project; and
4. Where the application requires mailed a public notice in compliance with Chapter 17.76 (Public Hearings), a map showing the location and street address of the project and all lots within the required notice-mailing radius for the permit, and a mailing list, keyed to the map, containing the names and addresses of the record owners of each lot, as shown on the County's latest equalized property tax assessment roll, in compliance with Chapter 17.76 (Public Hearings).
E. Eligibility, filing. All land use permit and other applications required by this Zoning Code shall be filed with the Department. Applications may be made by:
1. The owner of the subject property; or
2. Any authorized agent or representative, with the written consent of the property owner.
F. Filing date. The filing date of an application shall be the date on which the Department receives the last submission, map, plan, or other material required as a part of that application by Subsection A., in compliance with Section 17.60.060 (Initial Application Review) and deemed complete by the Director.
G. Revised materials. Whenever an applicant desires/needs to file revised materials, the materials shall be submitted at least 10 days before a public hearing on the application. However, the Director may choose to accept revised materials after that time, upon determining that there is sufficient time to review them before the hearing date. In addition, the applicable review authority may continue an application until the next available meeting date in order to adequately evaluate materials received after the date of receipt of the application package.
(Ord. No. 7464, § 13, 1-26-2026; Ord. No. 7402, § 2, 9-19-2022; Ord. 7160 § 52, 2009)