For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 55-144 — Reporting requirements

Code of Ordinances, City of Corpus Christi, Texas (Supp. No. 44: codified through Ordinance No. 033940, enacted June 2, 2026) · Corpus Christi Code of Ordinances § 55-144

Corpus is an independent public-information project, not the official City of Corpus Christi website. Stable reference: corpuslaw.us/code/4fbd28c6-6d50-47f1-b814-62a9b7fdcad4

Sec. 55-144. - Reporting requirements.

(a) Baseline monitoring reports. (1) Within either one hundred eighty (180) days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing significant industrial users subject to such categorical pretreatment standards, and currently discharging to or scheduled to discharge to the POTW, shall be required to submit to the city a report which contains the information listed in subsection (a)(2), below. At least ninety (90) days prior to commencement of their discharge, new sources, and sources that become industrial users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the city a report which contains the information listed in subsection (a)(2), below. A new source shall also be required to report the method of pretreatment it intends to use to meet applicable pretreatment standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged. (2) The industrial user shall submit the information required by this section including: a. Identifying information. The name and address of the facility including the name of the operator and owners. b. Wastewater discharge permits. A list of any environmental control wastewater discharge permits held by or for the facility. c. Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. d. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e). e. Measurement of pollutants. 1. Identify the categorical pretreatment standards applicable to each regulated process. 2. Submit the results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the city) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and long-term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection (j). Where the standard requires compliance with a BMP or pollution prevention alternative, the industrial user shall submit documentation as required by the director or the applicable standards to determine compliance with the standard. 3. Sampling must be performed in accordance with procedures set out in subsection 55-144(k). 4. In cases where the pretreatment standard requires compliance with a best management practice or pollution prevention alternative, the industrial user shall submit documentation as required by the city or the applicable pretreatment standards to determine compliance with the pretreatment standard. f. Certification. A statement reviewed by the industrial user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. g. Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in subsection 55-144(b) of this article. h. Baseline monitoring reports. All baseline monitoring reports must be signed and certified in accordance with subsection 55-143(e). (b) Compliance schedule progress report. The following conditions shall apply to the schedule required by subsection (a)(2)g. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation). The time frame for progress increments shall not exceed nine (9) months between increments. Preapproval of the director must be secured for the increment performance schedule. The industrial user shall thereafter submit a progress report to the director no later than fourteen (14) days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress as preapproval by the director, the reason for any delay, and, if appropriate, the steps being taken by the industrial user to return to the established schedule. In no event shall more than nine (9) months elapse between such progress reports to the director. (c) Report on compliance with categorical pretreatment standard deadline. Within ninety (90) days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any industrial user subject to such pretreatment standards and requirements shall submit to the city a report containing the information described in subsections (a)(2)d. through (a)(2)f. For industrial users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the industrial user's long-term production rate. For all other industrial users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the industrial user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with subsection 55-143(e). (d) Periodic compliance reports for all significant users. (1) Any significant industrial user subject to a pretreatment standard shall, at a frequency determined by the director but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by such pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a BMP or pollution prevention alternative, the industrial user must submit documentation required by the director or the pretreatment standard necessary to determine the compliance status of the industrial user. All periodic compliance reports must be signed and certified in accordance with subsection 55-143(e). (2) All wastewater samples must be representative of the industrial user's discharge during the period covered by the report. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of an industrial user to keep its monitoring facility in good working order shall not be grounds for the industrial user to claim that sample results are unrepresentative of its discharge. (3) If an industrial user subject to the reporting requirement in and of this section monitors any regulated pollutant at a regulated monitoring location more frequently than required by the POTW, using the procedures prescribed in subsection (k) of this section, the results of this monitoring shall be included in the report. (e) Report of changed conditions. Each industrial user is required to notify the director of any planned significant changes to the industrial user's operations or system which might alter the nature, quality or volume of its wastewater or any changes at their facility affecting the potential for slug discharge at least thirty (30) days before the change. (1) The director may require the industrial user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under subsection 55-143(e). (2) The director may issue a wastewater discharge permit under section 55-143 or modify an existing wastewater discharge permit under subsection 55-143(j). (3) No industrial user shall implement the planned changed condition(s) until and unless the director has responded to the industrial user's notice. (4) For purposes of this requirement, flow increases of ten (10) per cent or greater and the discharge of any previously unreported pollutants may be deemed significant. (f) Reports of potential problems. (1) In the case of any discharge including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, or a slug load which may cause potential problems for the POTW (including a violation of the prohibited discharge standards in subsection 55-141(a) of this article), it is the responsibility of the industrial user to immediately telephone and notify the city of the incident. This notification shall include the location of discharge, type of waste, concentration and volume, if known, and corrective actions taken by the industrial user. (2) Within five (5) days following such discharge, the industrial user shall, unless waived by the director, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the industrial user to prevent similar future occurrences. Such notification shall not relieve the industrial user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the industrial user of any fines, civil penalties, or other liability which may be imposed by this article. (3) Failure to notify the city of potential problem discharges shall be deemed a separate violation of this article, and shall be cause for revocation of the user's wastewater discharge permit should such discharge result in damage to or interference with the POTW. (4) The director may require a notice to be permanently posted on the industrial user's bulletin board or other prominent place advising employees whom to call in the event of a discharge described in subsection (f)(1), above. Employers shall ensure that all employees, who may cause or suffer such a discharge to occur, are advised of the emergency notification procedure. (g) Reports from nonsignificant industrial users. All industrial users not subject to categorical pretreatment standards and not required to obtain a wastewater discharge permit shall provide appropriate reports to the city as the director may require. (h) Notice of violation/repeat sampling and reporting. If sampling performed by an industrial user indicates a violation, the industrial user must notify the city within twenty-four (24) hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the city within thirty (30) days after becoming aware of the violation. The industrial user is not required to resample if the POTW performs monitoring at the industrial user's facility at least once a month, or if the POTW performs sampling between the industrial user's initial sampling and when the industrial user receives the results of this sampling, or if the POTW has performed the sampling and analysis in lieu of the industrial user. If the POTW performed the sampling and analysis in lieu of the industrial user, the POTW will perform the repeat sampling and analysis unless it notifies the industrial user of the violation and requires the industrial user to perform the repeat sampling and analysis. (i) Notification of the discharge of hazardous waste. (1) Any industrial user who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional Waste Management Division Director, and state hazardous waste authorities in writing of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the industrial user discharges more than one hundred (100) kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent such information is known and readily available to the industrial user: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following twelve (12) months. All notifications must take place no later than one hundred eighty (180) days after the discharge commences. Any notification under this paragraph need be submitted only once for each hazardous waste discharged. However, notifications of changed discharges must be submitted under subsection (e), above. The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements of subsections (a), (c) and (d), above. (2) Dischargers are exempt from the requirements of subsection (j)(1) of this section during a calendar month in which they discharge no more than fifteen (15) kilograms of hazardous wastes, unless the wastes are acute hazard wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than fifteen (15) kilograms of nonacute hazardous wastes in a calendar month, or any quantity of acute hazardous waste as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the industrial user discharges more than such quantities of any hazardous waste do not require additional notification. (3) In the case of any new regulations under Section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the industrial user must notify the POTW, the EPA Regional Waste Management Division Director, and state hazardous waste authorities of the discharge of such substance within ninety (90) days of the effective date of such regulations. (4) In the case of any notification made under this section, the industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. (j) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments to that part, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 and amendments to that part do not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the director or other parties approved by the EPA. (k) Sample collection. Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that are representative of conditions occurring during the reporting period. (1) Except as indicated in subsections (k)(2) and (k)(3) below, the industrial user must collect wastewater samples using twenty-four-hour flow-proportional composite collection techniques unless the director approves time proportional sampling. Where time-proportional composite sampling or grab sampling is authorized by the director, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR part 136 and appropriate EPA guidance, multiple grab samples collected during a twenty-four-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides, the samples may be composited in the laboratory, in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory; total residual chlorine, pH, and temperature samples may not be composited under any circumstances. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the director, as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits. (2) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic chemicals must be obtained using grab collection techniques. (3) For sampling required in support of baseline monitoring and ninety-day compliance reports required in subsections 55-144(a) and (c) of this article and in 40 CFR 403.12(b) and (d), a minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the director may authorize a lower minimum. For the reports required by subsection 55-144(c) and in 40 CFR 403.12(e) and (h), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements. (l) Determination of noncompliance. The director may use a grab sample(s) to determine noncompliance with pretreatment standards. (m) Timing. Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the U.S. Postal Service, the date of receipt of the report shall govern. (n) Record keeping. Industrial users shall retain, and make available for inspection and copying, for a period of at least three (3) years all records and information required by this article, any additional records of information obtained pursuant to monitoring activities undertaken by the industrial user independent of such requirements, and documentation associated with BMPs. This period shall be automatically extended for the duration of any litigation concerning compliance with this article, or where the industrial user has been specifically notified of a longer retention period by the director.

(Ord. No. 21666, § 1, 6-1-1993; Ord. No. 25377, § 9, 7-22-2003; Ord. No. 032342, § 1, 2-9-2021)

Ask a question about Corpus Christi law

Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.