POST-REPAIR AND POST-REPLACEMENT INSPECTION AND TESTING REQUIREMENTS.
Austin City Code § 15-11-6
in effect§ 15-11-6 - POST-REPAIR AND POST-REPLACEMENT INSPECTION AND TESTING REQUIREMENTS.
(A) After a property owner has repaired or replaced a defective private lateral, the Director shall:
(1) inspect the private lateral to determine that it complies with the Water Utility's wastewater service connection standards and the Plumbing Code; and
(2) test the private lateral in a manner approved by the director.
(B) If a private lateral fails the post-repair or post- replacement inspection or test, the property owner shall perform additional repairs as required by the Director to correct the defect.
Source: Ord. 20070125-007; Ord. 20130321-066.
Source: City of Austin, City Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/tx/austin/codes/code_of_ordinances?nodeId=TIT15UTRE_CH15-11PRLASELI_S15-11-6POPAPOPLINTEREFetched: 10/27/2026
