§ 33.526.240 — Open Area
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.526.240
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/5032c35d-4e0d-4fb1-b071-5191f54b2b9d
33.526.240 Open Area
A. Purpose. The open area requirement ensures provision of adequate amounts of open area, including light and air, for those who live, work and visit the Gateway plan district. Open area can provide passive or active recreational opportunities, and help to soften the built environment. In order to provide flexibility, this provision allows the requirement to be met by phasing the open area, locating it off site, or paying into a fund. B. Calculations. For purposes of this section, site area dedicated for public right-of-way is subtracted from the total site or lot area; C. Where these regulations apply. The requirements of this section apply to sites 5 acres or more in area. D. Additions of floor area to the site. The requirements of this subsection apply to sites where the proposal will result in an increase of at least 10,000 square feet of floor area on the site. The applicant may choose from the three options below: 1. On-site option. If the open area will be on-site, the following standards must be met: a. At least 0.5 square foot of open area is required for each square foot of floor area proposed for the site, up to a maximum requirement of 15 percent of the site area. Adjustments to reduce the total required amount of open area by up to 25 percent may be requested prior to January 2, 2032. Beginning January 2, 2032, adjustments to this standard are prohibited. b. Open areas are parks; plazas; or other similar areas approved through design review. These areas may include improvements such as children’s play equipment, picnic areas, landscaping, benches, paved walkways or trails, gardens, organized sport fields or courts, or other outdoor amenities. Open areas do not include areas used for parking or loading, or landscaping within parking areas. c. Existing open areas on the site may be used to meet this requirement. Open areas used for stormwater management or required recreation area may also be used to meet the requirements of this section. Open areas used to earn bonus floor area may not be used to meet the requirements of this section. d. The open area must be located outdoors on the site and abut either the public sidewalk or the site’s pedestrian circulation system. e. Open area may be provided in a variety of sizes, but each open area must measure at least 20 feet in all directions. f. The application must identify the location, proposed improvements, and timing of the improvements. 2. Off-site option. If the open area will be off-site, the following standards must be met: a. The area that will be used to meet this requirement must be: (1) Identified as proposed open space on the Gateway urban design concept or approved by Portland Parks and Recreation; (2) Under the applicant’s control; and (3) Vacant or used for surface parking. b. At least 0.5 square foot of open area is required for each square foot of floor area proposed for the site, up to a maximum requirement of 15 percent of the site area. Adjustments to reduce the total required amount of open area by up to 25 percent may be requested prior to January 2, 2032. Beginning January 2, 2032, adjustments to this standard are prohibited. c. The application must identify when the proposed open area site will be transferred into the ownership of the Portland Bureau of Parks and Recreation. 3. Gateway Regional Center Public Open Area Fund option. As an alternative to developing open area, the applicant may pay $30.00 per required square foot of open area into the Gateway Regional Center Public Open Area Fund (Open Area Fund). The Open Area Fund is collected and administered by the Portland Bureau of Parks and Recreation. The funds collected must be used within the Gateway plan district, either for acquisition or improvement of public open areas. If using this option, the following must be met: a. The required square footage of open area is calculated as 0.5 square foot of open area for each square foot of floor area proposed for the site, up to a maximum requirement of 15 percent of the site area; b. When applying for building permits or land use reviews on the site, the applicant must submit with the application a letter from the Portland Bureau of Parks and Recreation documenting the amount that has been contributed to the Open Area Fund. E. Land divisions. The standards and approval criteria of this subsection apply to sites where a land division is proposed: 1. The regulations of this subsection do not apply to proposed lots 5 acres or more in area. The regulations will apply if such lots are divided further. 2. The regulations of this paragraph apply to proposed lots less than 5 acres in area. a. For each lot, an area equal to at least 15 percent of the area of the lot must be in open area. b. For each lot, the applicant may choose to locate the required amount of open area on the lot, elsewhere on the land division site, or off-site. The applicant may also choose to make a contribution to the Open Area Fund. The application must specify which of these options, or combination of options, will be used to meet the requirements of this subsection. (1) If the open area requirement will be met on the lot, the applicant must specify the location. (2) If the open area requirement will be met elsewhere on the land division site, the required area must be in a tract. (3) If the open area requirement will be met off-site or through a contribution to the Open Area Fund, the requirements of Paragraphs D.2 or D.3 must be met: c. If the requirements of this paragraph will be met on the land division site or on the lot, the applicant must indicate when improvements will be made to the open area, what the extent of the improvements will be, and who will be responsible for the improvements and maintenance of the improvements. The following additional approval criteria must also be met: (1) Location. Each open area must be located on a part of the site that can be reasonably developed to meet requirements of Subparagraphs D.1.b. through D.1.e; (2) Improvements. The proposed improvements must be consistent with the purpose of this section; and (3) Timing. The timing of the improvements must be reasonably related to the timing of other development on the site.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
