For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 116.10 — Location of facilities

Saint Paul Legislative Code (Supp. No. 133, Update 1: codified through Ordinance No. 26-26, adopted May 13, 2026) · Saint Paul Legislative Code § 116.10

Corpus is an independent public-information project, not the official City of St. Paul website. Stable reference: corpuslaw.us/code/5042baac-e581-462f-9fd4-06d527aeb928

Sec. 116.10. - Location of facilities.

(a) Undergrounding. New construction and the installation of new facilities shall be located underground or contained within buildings or other structures in conformity with any applicable codes except that the director may approve the aboveground location and installation of the following if they do not create any unreasonable safety, maintenance, or aesthetic concerns or conflict with the current use of the right-of-way. In approving the above ground locations the director shall consider the size of the proposed facility in relation to the proposed site. (1) New poles, and new pole lines under six hundred sixty (660) feet in length which do not conflict with existing or planned trees or other facilities. (2) New ancillary facilities and appurtenances to existing facilities, such as transformers, meters, junction boxes, splice boxes. (3) New junction boxes for existing underground utility service to individual locations and homes. (4) New cellular telephone antennae and related new facilities and appurtenances which have already received zoning and any other necessary approvals. (5) The repair or replacement of existing above ground facilities with similar new facilities. (6) Any other new facilities which the director has determined that, due to expense, nature, or function cannot be placed underground. (b) Locations. The director shall assign specific locations within the right-of-way, or any particular segment thereof as may be necessary, for each type of facility that is or, pursuant to current technology, the director expects will someday be located within the right-of-way. All excavation, obstruction, or other permits issued by the department involving the installation or replacement of facilities shall designate the proper location for the facility. (c) Nuisance. One (1) year after December 11, 1996, any equipment or facilities found in a right-of-way that has not been registered shall be deemed to be a nuisance. The city may exercise any remedies or rights it has at law or in equity, including, but not limited to, abating the nuisance pursuant to section 45.11 of the Legislative Code or taking possession of the equipment or facilities and restoring the right-of-way to a useable condition. (d) Limitation of space. The director shall have the power to prohibit or limit the placement of new or additional facilities at specific locations within the right-of-way if there is insufficient space to accommodate all of the requests of registrants or persons to occupy and use the right-of-way. In making such decisions, the director shall strive to the extent possible to accommodate all existing and potential users of the right-of-way, but shall be guided primarily by considerations of the public interest, the public's needs for the particular utility service, the condition of the right-of-way, the time of year with respect to essential utilities, the protection of existing facilities in the right-of-way, and future city plans for public improvements and development projects which have been determined to be in the public interest.

(C.F. No. 96-1370, § 1, 12-11-96; C.F. No. 00-268, § 1, 4-19-00; C.F. No. 00-600, § 2, 7-12-00)

Ask a question about St. Paul law

Corpus searches the St. Paul sections it holds and shows the ones that match, with their citations. Free, no sign-in.