For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21.16.275 — Side sewer construction as-builts (record drawings)

Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 21.16.275

Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/506acd27-0b45-42d3-97c9-bbc729b54bb1

21.16.275 - Side sewer construction as-builts (record drawings).

As-built (or record) drawings are required for all side sewer work that requires a side sewer permit. As-built drawings shall be prepared by the permit holder using the standards and requirements as established by the Director of Seattle Public Utilities. Drawings that do not meet these requirements, as determined by the Director, shall be returned to the permit holder for revision and resubmittal as part of the side sewer permit work requirements.

(Ord. 123494, § 31, 2010)

Ask a question about Seattle law

Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.