§ 20-30 — Application and Filing Fee
Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 20-30
Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/50a95715-5e9d-47a9-b2bf-e5a9256687f3
Sec. 20-30. Application and Filing Fee.
Every application for a permit to drill and operate a well shall be in writing, signed by the applicant or by some person duly authorized to sign same on the applicant's behalf, shall be filed with the City Engineer (who shall notify Water Utilities), and shall be accompanied with a filing fee of one thousand dollars ($1,000.00). Each application shall be a request for a permit to drill and operate a single well. The application shall include all necessary information, including but not limited to the following: 1. Date of said application. 2. Name and address of the applicant, and if the applicant is a partnership, the names and addresses of the general partners. 3. If the applicant is a corporation, the names of the local agent, president, and chief executive officer of the corporation, name and address of the agent for service of process of the corporation, and the address of the local offices and the principal corporate offices. 4. Proposed site of the well, including (a) name and address of the fee surface owner(s) of record. (b) name and address of the lease owner(s) of record. (c) brief description of the land. 5. Minimum site plan. 6. Description of all pits. 7. All information necessary to determine what level permit is required for issuance under this Chapter. 8. All specific information required as a result of determining the level permit to be issued. If a Level B or Level C permit is required, then a plat prepared by a duly licensed surveyor must be included showing the lots or tracts on which said well is located, the exact location of the proposed well, distances from well location to the exterior boundary lines of the tract on which the well is drilled and the distances from the well location to all residences, schools, churches, hospitals or commercial buildings situated within three hundred feet (300') of the well location. 9. Proposed total depth of the well. 10. The proposed type of blowout prevention device shall be stated in the application. Blow out preventers shall be given a test for ability to function once a week during drilling operations. In addition to the function tests, if a well is planned for drilling into formations determined by the Railroad Commission to be hydrogen sulfide bearing, the blow out preventers shall be tested in accordance with Railroad Commission protocol applying to sour gas wells. 11. List of all waivers, including the expiration date of each, required by Section 10-373. 12. A statement that all information in the application is true and correct. (Ord. No. 0-2000-86, 11/1/00) (0-2008-45, 3/26/08)
Ask a question about Tyler law
Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.
