Sec. 10-471. Design of Facilities

Design of storm sewer systems, materials, and construction must be in accordance with the Design Guidelines for Subdivision Improvements. When a project is determined to be in the jurisdictional control of the U. S. Corp of Engineers, in regard to the Federal Clean Water Act or successor, the city requirements for drainage improvements will be subordinate to the requirements of a Section 404 Permit of the Federal Clean Water Act, or successor. During the platting process, the flood hazard areas shall be identified and drainage easements dedicated to the public on the final plat. Plans shall be submitted with the plat. The owners and developers of property have the duty to: a. Accommodate Upstream and Adjacent Drainage Areas A culvert or other drainage facility shall in each case be large enough to accommodate potential runoff from ultimate development conditions from its entire upstream drainage area, whether inside, outside, along or adjacent to the subdivision or addition. The owner's engineer shall initially determine the necessary size of the facility, based on the provisions of the construction standards and specifications assuming conditions of maximum potential watershed development permitted by the development code, subject to approval by the development services engineer. b. Effect on Downstream Drainage Areas The owner's engineer shall study the affect of each addition's storm runoff on the existing drainage facilities at a reasonable distance downstream of the addition as determined by the development services engineer. Where it is determined that existing capacity is not available immediately downstream, the owner's engineer must design a drainage system, detention facility, or parallel system to mitigate the deficiency. The commission may deny the plat until the construction plans for such mitigation has been approved by the development services engineer. If oversize improvements are required, then the city may participate in the cost as prescribed by this code.

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.