Sec. 37-65. - Same—Evaluated prices for determination of over-size cost and off-site facilities.

In the extension of water and sewer mains to a subdivision, the following evaluated prices shall be used in determining over-size cost and off-site facilities: (a) Water mains and appurtenances: (1) For 2″ copper or cast-iron water pipe, per lin. ft. .....$1.50 (2) For 2″ galvanized iron or steel water pipe, per lin. ft. .....1.25 (3) For 4″ cement lined Cl. 150, C.I. water pipe, per lin. ft. .....2.00 (4) For 6″ cement lined Cl. 150, C.I. water pipe, per lin. ft. .....2.60 (5) For 8″ cement lined Cl. 150, C.I. water pipe, per lin. ft. .....3.40 (6) For 12″ cement lined Cl. 150, C.I. water pipe, per lin. ft. .....5.50 (7) For 16″ cement lined Cl. 150, C.I. water pipe, per lin. ft. .....8.50 (8) Fittings, per ton .....460.00 (9) For standard 3-way 5″ fire hydrants, each .....180.00 (10) For 2″ brass wheel valve, each .....20.00 (11) For 2″ gate valve, each .....30.00 (12) For 4″ gate valve, each .....66.00 (13) For 6″ gate valve, each .....84.00 (14) For 8″ gate valve, each .....120.00 (15) For 12″ gate valve, each .....214.00 (16) For 16″ gate valve, each .....480.00 (17) For ¾″ copper deadhead service, each .....25.00 (18) For 1″ copper deadhead service, each .....40.00 (19) For 1½″ copper deadhead service, each .....70.00 (20) For 2″ copper deadhead service, each .....90.00 (21) Corrosion protection: For sand embedment, per cu. yd. .....2.00 For polyethyelene wrap (per linear ft. × pipe diameter in inches) .....0.04 The unit prices above are inclusive of all concrete, wet connections, gravel foundations, granular backfill, and all other items not specifically listed herein which may be necessary to produce a complete job. The city reserves the right to require the use of Class 200 asbestos cement water pipe in areas of high corrosion potential at the same unit prices as set out above for cast-iron pipe. (b) Sanitary sewer mains and appurtenances: (1) Fittings and labor: 4″ sewer connection (residential) .....$ 75.00 6″ sewer connection (commercial) .....125.00 8″ sewer connection (commercial) .....150.00 (2) Pipe (vitreous clay-extra strength or cast iron at city's option): 4″ pipe, lin. ft. .....$2.40 6″ pipe, lin. ft. .....2.90 8″ pipe, lin. ft. .....3.40 10″ pipe, lin. ft. .....3.90 12″ pipe, lin. ft. .....5.30 15″ pipe, lin. ft. .....6.20 (3) Manholes (10′ maximum depth measured to street grade): 3′ diameter .....$450.00 4′ diameter .....550.00 4½′ diameter .....600.00 5′ diameter .....660.00 5½′ diameter .....740.00 6′ diameter .....900.00 For each additional foot of depth add 10% of the above stated cost for same diameter. (4) Street boring (measured to construction limits): 8″ casing—30′ standard bore .....$500.00 For each additional foot of length add 15% of the above stated cost. Because the wastewater department cannot construct sanitary sewers more than eleven (11) feet deep, all sanitary sewers shall be contracted for by the standard specifications of the City of Pasadena and must further be approved by the city engineer. The above charges shall be assessed for all sewer work performed by the city on public right-of-ways. Charges for clean-outs and fittings are in addition to the above established charges and shall be computed at three (3) times the item price. The charges for clean-outs and fittings plus the appropriate charges computed from the schedule above shall be full compensation for a completed job. (c) Miscellaneous items pertaining to both water and sanitary sewer: (1) For gravel paving, per sq. yd. .....$ 2.00 (2) For asphalt penetration paving, per sq. yd. .....4.00 (3) For concrete and asphalt concrete paving, per sq. yd. .....6.00 (4) For sidewalk, per sq. yd. .....4.40 (5) For Class 3 embedment, per cu. yd. .....5.40 (6) For granular material, per cu. yd. .....1.80 (7) For 2000# concrete, per cu. yd. .....14.00 (8) For 3000# concrete, per cu. yd. .....16.00 (9) For stabilized backfill (2 sacks cement-yd. excavated material, per cu. yd. .....8.00 (10) For rip rap, per cu. yd. .....10.00 (11) For excavation over 10′ depth below street grade: ..... Dirt, per cu. ft. .....2.00 Rock, per cu. ft. .....4.00

(Ord. No. 68-202, § 5-1, 11-19-68) (Ord. No. 68-202, § 5-1, 11-19-68; Ord. No. 72-241, § 1, 9-5-72; Ord. No. 92-22, § 1, 2-11-92) (Ord. No. 68-202, § 5-1, 11-19-68)