Design standards, rights-of-way, and widths.
AS 19.30.161
in effect19.30.161. Design standards, rights-of-way, and widths.
Design standards, rights-of-way, and widths for each local service road and trail project must have the prior approval of the commissioner, unless the project is under the supervision of a local government that has assumed local road powers. Where approval is required the commissioner must make a decision within 90 days after the Department of Transportation and Public Facilities' receipt of the local government's request. If the project is under the supervision of a local government that has assumed road powers and the project is not located on a federal-aid secondary route, design standards, rights-of-way, and widths shall be established by the local government. If a project under the supervision of a local government that has assumed road powers is located on a federal-aid secondary route, design standards, rights-of-way, and widths must have the prior approval of the commissioner.
Source: Alaska State Legislature (akleg.gov)URL: https://www.akleg.gov/basis/statutes.asp?media=print&secStart=19.30.161&secEnd=19.30.161#19.30.161Fetched: 10/20/2026
