§ 70.3 — Electric vehicle readiness requirements
Code of Ordinances of the City of Huntsville, Alabama (Supp. No. 30 (codified through Ord. No. 26-196, adopted March 12, 2026) with enacted ordinances through Ord. No. 26-837 (September 24, 2026) applied from official council minutes and ordinance copies) · Huntsville Code of Ordinances, App. A, art. 70, § 70.3
Corpus is an independent public-information project, not the official City of Huntsville website. Stable reference: corpuslaw.us/code/54921441-707a-4f21-b78d-ce5b3a5b6b6b
70.3. - Electric vehicle readiness requirements.
Where the required number of parking spaces equals 100 or more spaces then two electric vehicle capable spaces shall be identified, and one additional space shall be identified per 50 thereafter. The following standards are applicable: 70.3.1. These locations shall be installed with electrical panel space and load capacity to support a branch circuit and necessary raceways, both underground and/or surface mounted to support electric vehicle supply equipment (EVSE), which shall meet the electrical and conduit regulations and specifications as established by the governing electrical utility provider ; and 70.3.2. Electric vehicle capable spaces shall be located at a minimum distance of 50 feet from any structure. The above regulations do not require the installation of an electric charging station; however, it provides for a natural progression and location of appropriate infrastructure as technology advances.
(Ord. No. 24-287, § 1, 5-23-2024)
Ask a question about Huntsville law
Corpus searches the Huntsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.