Tuscaloosa Code of Ordinances § 16-130 Installation service charges for new service.
Sec. 16-130. - Installation service charges for new service.
Service charges for installation of new meters and for connection to water main for new service shall be based on the size of the water meter to be installed, as follows:
Diameter of water meter | Charge
¾-inch meter (domestic/irrigation/13-D fire) ..... | $ 1,018.00
¾-inch subdivision stub-out meter (drop in) | 450.00
1-inch meter (domestic/irrigation/13-D fire) ..... | 1,120.00
1-inch subdivision stub-out meter (drop in) | 500.00
1½-inch meter (irrigation set/13-D fire) ..... | 3,205.00
1½-inch meter (commercial) ..... | 4,150.00
2-inch meter (irrigation set) ..... | 3,250.00
2-inch meter (commercial) ..... | 5,125.00
Larger than 2 inches ..... Actual cost, including labor
Fire hydrant water meter ..... $30.00 per 30-day permit and per each renewal
The amount charged shall be determined at the rate applicable at the time the services are actually rendered and not when requested. Meter sets will not be sold or authorized and will not be made unless the applicant has obtained a building permit from the city. The foregoing provision shall apply only in those instances in which a building permit is required. For any meter greater than two (2) inches in size, actual costs set will be determined by the office of the city engineer.
(Code 1962, § 33-67; Ord. No. 2131, § 8, 5-15-80; Ord. No. 2218, § 8, 9-7-82; Ord. No. 3040, § 1, 2-8-90; Ord. No. 3227, § 7, 4-28-91; Ord. No. 3857, 4-14-94; Ord. No. 7543, § 6, 5-25-10; Ord. No. 8035, § 1, 12-3-13; Ord. No. 8038, 12-10-13; Ord. No. 9460, § 2, 12-5-23)
