§ 61-7 — Master drainage plan
Code of Ordinances of Kansas City, Missouri (Supp. No. 140, Update 1: codified through Ordinance No. 260692, enacted August 13, 2026) · Kansas City Code § 61-7
Corpus is an independent public-information project, not the official City of Kansas City website. Stable reference: corpuslaw.us/code/5507b233-ee7d-4658-9d55-33a381184b7d
Sec. 61-7. - Master drainage plan.
(a) The director of water services shall develop a master drainage plan for the city, based on engineering studies, that indicates the location of all drainage facilities in the city, including those facilities that currently exist and those determined to be needed and that are intended to be constructed in the future. The plan shall include all major drainageways that directly or indirectly affect drainage within the city, all drainage basins in the city, and all natural drainage courses and other drainage facilities required to provide for the drainage and management of surface waters within the drainageways and basins and to carry such waters to designated points without overflow or discharge. The plan may also show any other information that the director deems desirable. The director shall solicit public participation during the formulation of the master drainage plan and other phases of implementation of the storm drainage and flood management program provided in this article. (b) The purpose of the master drainage plan prescribed by this section is to identify and alleviate present and future drainage and flooding problems in the city by means of presenting in an orderly fashion the general data and information essential in understanding the relationship between rainfall and storm runoff. The master drainage plan serves as the official designation of drainage facilities and drainageways and basins shown thereon and may be altered from time to time to conform to existing conditions. (c) Any time a project is proposed by the city to implement the master drainage plan, the director shall hold a public hearing in the neighborhood where the project is to be constructed, after publishing notice in a newspaper of general circulation. (d) The director may undertake supplementary studies to determine the estimated cost of constructing the drainage facilities shown on the master drainage plan, including the expense of any necessary land acquisition. (e) The city council shall adopt the master drainage plan by resolution. No substantial modifications thereof may be made unless the council first approves them. (f) After adoption of the master drainage plan, the director of records shall retain a copy on file for public inspection during normal business hours. (g) In the annual proposed city budget, the director shall submit to the city council a proposed budget for construction of drainage facilities, containing a statement of all amounts currently in the stormwater funds, an estimate of anticipated revenues for the ensuing budget year, and a list of the proposed projects to be constructed or developed.
(Ord. No. 120551, § 1, 6-28-12)
Ask a question about Kansas City law
Corpus searches the Kansas City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
