Solar water heater system required for new single-family residential construction
HRS §196-6.5
in effect196-6.5. Solar water heater system required for new single-family residential construction
(a) On or after January 1, 2010, no building permit shall be issued for a new single-family dwelling that does not include a solar water heater system that meets the standards established pursuant to section 269-44, unless the chief energy officer of the Hawaii state energy office approves a variance. A variance application shall only be accepted if submitted by an architect or mechanical engineer licensed under chapter 464, who attests that:
(1) Installation is impracticable due to poor solar
resource;
(2) Installation is cost-prohibitive based upon a
life cycle cost-benefit analysis that incorporates the average residential
utility bill and the cost of the new solar water heater system with a life
cycle that does not exceed fifteen years;
(3) A renewable energy technology system, as defined
in section 235-12.5, is substituted for use as the primary energy source for
heating water; or
(4) A demand water heater device approved by
Underwriters Laboratories, Inc., is installed; provided that at least one other
gas appliance is installed in the dwelling. For the purposes of this
paragraph, "demand water heater" means a gas-tankless instantaneous
water heater that provides hot water only as it is needed.
(b) A request for a variance shall be
submitted to the chief energy officer of the Hawaii state energy office on an
application prescribed by the chief energy officer of the Hawaii state energy
office and shall include a description of the location of the property and
justification for the approval of a variance using the criteria established in
subsection (a). A variance shall be deemed approved if not denied within
thirty working days after receipt of the variance application. The chief
energy officer of the Hawaii state energy office shall publicize:
(1) All applications for a variance within seven days
after receipt of the variance application; and
(2) The disposition of all applications for a
variance within seven days of the determination of the variance application.
(c) The director of business, economic
development, and tourism may adopt rules pursuant to chapter 91 to impose and
collect fees to cover the costs of administering variances under this section.
The fees, if any, shall be deposited into the energy security special fund
established under section 201-12.8.
(d) Nothing in this section shall preclude any
county from establishing procedures and standards required to implement this
section.
(e) Nothing in this section shall preclude
participation in any utility demand-side management program or public benefits
fee program under part VII of chapter 269.
[L 2008, c 204, §2; am L 2009, c 155,
§14; am L 2010, c 175, §1; am L 2019, c 122, §3]