in effectSec. 12.08.040. - Backfilling and restoration.
(a) Generally. All pavement cuts, openings and excavations shall be properly made, backfilled and temporarily surfaced by the permittee under this chapter according to the city specifications. Temporary surfacing must be installed within 24 hours after the trench is backfilled.
(b) Notice of beginning of backfilling. The city engineer must be notified by the permittee during the 48 hour period preceding beginning of backfilling of the date and approximate time at which backfilling will be begun.
(c) Temporary patching. Temporary patching shall be done by the permittee, and it is the responsibility of the permittee to maintain the temporary patch for a period not to exceed 60 days, or until weather conditions permit placement of the permanent patch.
(d) Final restoration of paving surface. The work of final restoration of the paving surface shall be performed by the city under the direction of the city engineer.
(e) Resurfacing instead of patching. If the city engineer finds that paving surfaces adjacent to the street opening may be damaged where trenches are made parallel to the street, or where a number of cross trenches are laid in close proximity to one another or where the equipment used may cause such damage, he may require a negotiated contribution from the permittee for the resurfacing in place of patching of such street if the total area of the proposed patch or probably damaged area exceeds 25 percent of the total pavement surfacing between curb faces or between concrete gutter edges in any block. Such negotiations shall be carried on and contributions agreed upon prior to issuance of a permit. Such contribution shall be in lieu of the standard permit fee.
(f) Performance of work diligently. After the excavation is commenced, the work to be performed under the permit shall be prosecuted with due diligence to completion.
(g) Inspections. The city engineer shall make such inspections as he may deem necessary of all work authorized by a permit.
(h) Abandonment of facilities. If the permittee abandons any facilities within the public area, the city may require the permittee to remove at his expense, or to reimburse the city for removal of such abandoned facilities.
(i) Depth of facilities. The top of any structure or facility, excepting entrances thereto, shall not hereinafter be placed less than eighteen (18) inches below the surface of a public area unless approved by the city engineer.
(j) Certificate of final inspection. The permittee shall notify the city engineer in writing upon completion of all work accomplished under the provisions of the permit. A certificate of final inspection will be issued by the city engineer to each permittee no sooner than three years after the permanent restoration of the excavation has been made, provided the work authorized by the permit has been performed according to city specifications. Any settlement in a restored area which has occurred within the three year period, following completion of the permanent restoration shall be repaired by the permittee or any expense incurred by the city in correcting such settlement shall be paid by the permittee unless the permittee submits proof satisfactory to the city engineer that the settlement was not due to defective backfilling.