For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 66-144 — Meters; installation, reading and testing

Code of the Town of Gilbert, Arizona (Supp. No. 103: codified through Ordinance No. 2986, enacted June 9, 2026) · Gilbert Town Code § 66-144

Corpus is an independent public-information project, not the official City of Gilbert website. Stable reference: corpuslaw.us/code/56440c41-6243-4e6e-b1de-c82f85572e93

Sec. 66-144. - Meters; installation, reading and testing.

(a) All premises using reclaimed water obtained from the town must be equipped with an adequate meter installed and paid for by the consumer. A meter shall be installed in a location that will be of easy access and have an accuracy of plus or minus five percent. All meters shall register actual flow and totalize all flows. (b) Any existing landscape water user desiring to change source to direct use of reclaimed water must submit an acceptable revised irrigation plan to the development services department before a permit may be issued for the use of reclaimed water. (c) The director of the department of public works shall read or cause to be read every meter used for delivery of reclaimed water supplied by the town at such times as are necessary in order that bills may be sent out at the proper time as may be directed by the town authorities. (d) Upon the verified complaint of a consumer presented to the wastewater department, any reclaimed water meter shall be taken out and tested after payment of a fee of $50.00. If upon testing, the meter is not within five percent of being accurate, it shall be repaired or replaced, and the $50.00 fee returned to the customer. (e) Any reclaimed water user delivering non-potable water to areas between a dwelling unit and the potable water meter must utilize a reduced flow pressure zone principal backflow prevention assembly at the potable water meter. The backflow device must be tested annually according to the procedures outlined in section 10-91. The party maintaining the reclaimed water use agreement with the town shall be responsible for such testing. The results from such annual tests shall be reported to the public works department, or reclaimed water service shall be suspended until such time as the town receives confirmation that the device functions properly. (f) For those dwelling units subject to the requirements of paragraph (e), above, the party maintaining the reclaimed water use agreement with the town shall also perform cross connection testing every five years to ensure that no cross contamination between potable and non-potable water has occurred. Such test results shall be reported to the public works department or reclaimed water service shall be suspended until such time as the town receives confirmation that the testing has been completed and that no cross connection has occurred.

(Ord. No. 2501, § I, 9-25-14)

Ask a question about Gilbert law

Corpus searches the Gilbert sections it holds and shows the ones that match, with their citations. Free, no sign-in.