§ 11-5-3 — Master Drainage Plan

Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 11-5-3

Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/5644c708-e68b-48fe-8764-f2a0293a8b58

11-5-3. - Master Drainage Plan.

(a) The city manager shall develop a master drainage plan for the city, based on engineering studies, that indicates the location of all drainage facilities in the city, including those facilities that currently exist and those determined to be needed and that are intended to be constructed in the future. The plan shall include all major drainage ways that directly or indirectly affect drainage within the city, all drainage basins in the city, and all natural drainage courses and other drainage facilities required to provide for the drainage and management of surface waters within the drainage ways and basins and to carry such waters to designated points without overflow or discharge. The plan may also show any other information that the manager deems desirable. The city manager shall solicit public participation during the formulation of the master drainage plan and other phases of implementation of the storm drainage and flood management program provided in this chapter. (b) The purpose of the master drainage plan prescribed by this section is to identify and alleviate present and future drainage and flooding problems in the city by means of presenting in an orderly fashion the general data and information essential in understanding the relationship between rainfall and storm runoff. The master drainage plan serves as the official designation of drainage facilities and drainage ways and basins shown thereon and may be altered from time to time to conform to existing conditions. (c) Any time a project is proposed by the city to implement the master drainage plan, the city manager shall hold a public hearing in the neighborhood where the project is to be constructed, after publishing notice in a newspaper of general circulation. (d) The city manager may undertake supplementary studies to determine the estimated cost of constructing the drainage facilities shown on the master drainage plan, including the expense of any necessary land acquisition. (e) The city council shall adopt the master drainage plan by motion. No substantial modifications thereof may be made unless the council first approves them. (f) After adoption of the master drainage plan, the city clerk shall retain a copy on file for public inspection during normal business hours. (g) In the annual proposed city budget, the city manager shall submit to the city council a proposed budget for construction of drainage facilities, containing a statement of all amounts currently in the stormwater and flood management account, an estimate of anticipated revenues for the ensuing budget year, and a list of the proposed projects to be constructed or developed.

Ask a question about Boulder law

Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.