Sec. 153.16. - Demolition fill and cover.

Whenever any building or structure is demolished, in whole or in part: (A) All structural elements and materials shall be completely removed from above and below the surface of the land, unless the building official approves partial removal thereof, based upon his or her determination that complete removal would be: (1) Physically impractical; (2) Harmful to a connected or adjacent structure, street, sidewalk, or alley; (3) Environmentally unsafe, or require extensive environmental remediation; (4) If the complete removal will cause the property to be in violation of another applicable law, code, or regulation; or (5) If the costs of complete removal are not economically justified in light of the intended uses of the property after demolition. (B) All gas, sewer, and water lines shall be securely capped or plugged. All other electrical service shall be removed to the point of connection with the public utility transmission line. (C) Only an approved fill material shall be used to bring the land to within four to six inches of finish grade. Approved fill material shall be "pit-run" gravel, crushed gravel, or crushed limestone of the proper grading to produce a firm, stable base when compacted by rolling or tamping. Only topsoil shall be used to bring the land to finish grade. The topsoil shall consist of loose, friable, loamy topsoil without admixture of subsoil or refuse. (D) The final grade of backfill shall prevent water from draining unnecessarily onto adjacent properties. Soil erosion controls shall be instituted in accordance with the standards set forth in the City of Dayton Construction and Material Specifications and any amendments thereto. (E) All demolition areas shall be seeded in accordance with the City of Dayton Construction and Material Specifications and any amendments thereto. (F) The owner of the property may appeal the decision of the building official, made with respect to this section, within 15 days of the decision, by making a demand in writing to the Nuisance Appeals Board, in care of the Manager of the Division of Housing Inspection, for a hearing relating to the decision. The demand shall include the correct mailing address of the owner or person representing the owner. The hearing shall be scheduled within a reasonable time, not to exceed 30 days following receipt of the written demand. (G) In addition to the powers conferred on it by § 152.07, the Nuisance Appeals Board may vote to: (1) Affirm the decision of the building official and order compliance with this section; (2) Take such other action and render such other orders as it deems appropriate within the authority conferred under this chapter; or (3) Reverse the decision of the building official and dismiss the case.

(Ord. 29119-95, passed 11-22-95; Am. Ord. 30111-02, passed 6-5-02)

Ask a question about Dayton law

Corpus searches the Dayton sections it holds and shows the ones that match, with their citations. Free, no sign-in.