For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 54-1 — Regulations for blasting operations

Code of the City of Charleston, West Virginia (Supp. No. 56: codified through Bill No. 8069, enacted March 16, 2026) · Charleston, W. Va., City Code § 54-1

Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/57d8bf32-3485-4745-8c1d-b0bc4b7c96be

Sec. 54-1. - Regulations for blasting operations.

(a) Prior to blasting, a preblast survey of all structures located within 500 feet of the blasting shall be submitted by the contractor and made a part of the public record. The survey shall be performed by a qualified vibration consultant as approved by the fire chief. (b) The particle velocity resulting from any blasting action shall not exceed two inches per second on a vertical, longitudinal or transverse plane of motion at the nearest structure to the blasting site. (c) Every blasting shot shall be recorded on a three-component particle velocity recording seismograph, and these results shall be made a part of the public record. The seismograph shall be operated by a qualified vibration consultant as approved by the fire chief. (d) Surveys required by this section for public record shall be maintained in the office of the fire chief and shall be filed by the contractor no later than seven days following the blasting action.

(Ord. No. 6228, § 12-1, 5-6-1996)

Ask a question about Charleston law

Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.