Sec. 8-329. - Gas or oil distributing stations.
(a) Plans and specifications. Plans and specifications for any gas or oil distributing station shall conform in all respects to the laws of the State and to existing laws for buildings and construction in the City. (b) Design standards. (1) Sidewalk, street, and curb grades. Sidewalk, street, and curb grades shall be established by the Council and shall be obtained from the Engineering Division of the Department of Public Works. All construction shall conform to the grades so established. (2) Driveways and stationaries. a. Surfacing. All stationaries and driveways which receive moving traffic shall be surfaced with bituminous or Portland cement concrete. If Portland cement concrete is used, it shall be a minimum thickness of six inches or of a designed mix containing not less than 5½ bags of cement per cubic yard of concrete. If bituminous concrete is used, it shall be laid with a minimum thickness of two inches of a plant hot mix material upon either a four-inch Portland cement concrete base or a six-inch crushed stone base, such base to be properly compacted and rolled. b. Corner lots. Driveway approaches measured along the curbline shall not be less than 25 feet from the intersection of the street right-of-way line on a corner lot or 35 feet from the point of intersection of the curb faces, whichever is greater. c. Curb cuts. Two driveways shall be permitted on both the long and short side of any lot; but in no case shall two driveways be permitted on any side less than 100 feet long. Openings shall not exceed the distances set in this subsection. The opening at the curb to any proposed gas or oil distributing station shall not be greater than 30 feet and at the property line shall not be greater than 20 feet. d. Curbing required. Except at driveway locations, curbing not less than eight inches in height and eight inches in width shall be constructed adjacent to all property lines and/or street setback lines abutting the street rights-of-way. At all driveway locations, the end 24 inches by eight inches curbing may be evenly tapered to allow the top of such curbing to intersect at the grade with the driveway. e. Driveways. The curbing of all driveways on both sides shall commence at the outside sidewalk line at the grade established by the Engineering Division of the Department of Public Works. Such curb shall continue and become attached to the curb at the street at the same grade as such street curbing, the outer edge of such curbing conforming with the entrance measurements as set forth in this section. f. Distance between driveways. The minimum distance between driveways at the property line shall be 30 feet. g. Lighting. The type and location of all lighting shall be shown on the site plan. All outdoor light sources shall be controlled, directed, and/or otherwise screened from illuminating directly upon adjoining or opposite properties. This control can be by landscaping, buildings, louvers, and/or shields on the lights, or with similar devices. h. Fencing required. 1. When abutting a residential zone, decorative fencing that is impervious to sight and not less than four feet nor more than eight feet in height shall be installed along the interior boundaries of the proposed station property to a point 15 feet from the street right-of-way. Curbing eight inches by eight inches shall be placed along the property line within this 15 feet. When abutting a zone other than residential, curbing or bumper guards may replace the fencing equipment. 2. All exterior waste or storage areas shall be properly fenced to screen them from public view. i. Setback area. 1. Where street setback areas are required, the setback area shall not be considered part of the station proper but shall be properly seeded and landscaped. 2. With the permission of the Plan Commission, the station area may extend into the street setback area to within 15 feet of the street right-of-way line if proper curbing is installed as required by the Commission for the purpose of safety and protection of property. 3. Interior and corner side yard setback areas bordering on residential zoning districts shall be landscaped and buffered as required in Chapter 44, regardless of size of parking area. j. Underground storage tanks. The location and size of all underground fuel tanks shall be approved in writing by the Fire Prevention Division of the City Fire Department by submitting a site plan and application to such Division. Installations shall comply with the provisions of Chapter 18. k. Elevated pump islands. All site plans shall show the following information: 1. The location of the elevated pump islands. 2. The location of a rectangular area that shall surround the pump islands. Such area shall be surfaced with Portland cement concrete or bituminous concrete in accordance with subsection (b)(2)a of this section, and covered and maintained with a solvent resistant material and shall project at least three feet to the front and rear of the pump island and eight feet to each side. 3. The distance from the property line to the nearest point on the face of such pump island. Such distance shall be at least 15 feet. (c) Permit. No gas or oil distributing station shall be erected in the City without first securing a permit from the Director. No permit shall be issued by the Director until detailed plans and specifications have been submitted to the Plan Commission and subsequently approved by the Council. (d) Approval of plans. No permit shall be issued until a site plan fulfilling the following requirements has been approved by the Plan Commission pursuant to Chapter 44. Such site plan shall be drawn to an engineer's scale and shall show the location and dimension of all property lines, property description, sidewalks, curbs, trees, lighting standards, utility poles, fire hydrants, mail boxes, traffic signs, water mains, sanitary sewers, storm sewers, storm sewer inlets, storm, sanitary, and water connections, and any other structures on or in the street adjacent to the property as well as on the property and shall show the location of all existing and proposed structures and installations on the property. All elevations shown on such site plan shall give the City datum. After a site plan has been approved by the Plan Commission, all construction and operation shall be in accordance with the provisions of the plan, and no certificate of occupancy shall be issued by the Director until all requirements have been fulfilled. (e) Noncompliance and inspection. If it is thought the terms of this section are being violated, the City Engineer or the Director, or any other parties properly designated by the Common Council may enter upon the premises at any reasonable time for inspection. If noncompliance is found, all business activities upon such premises shall be suspended until the terms of this section are complied with.
(Ord. No. 13-24, § 1, 7-30-2024)
Ask a question about Green Bay law
Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.