San José Municipal Code § 17.10.500 Approval required.
17.10.500 - Approval required.
No geologic evaluation which requires or contemplates any invasive testing or soil disturbance shall be conducted by an applicant unless and until the director approves a plan for the geologic evaluation which includes but is not limited to the following requirements and mitigation measures:
1. All geotechnical testing shall be designed and completed under supervision of a certified engineering geologist or geotechnical engineer; and
2. The incorporation of specific dust control measures to avoid air quality impacts from fugitive dust; and
3. The preparation of habitat assessment and the incorporation of specific measures to avoid habitat and biological impacts; and
4. The incorporation of specific measures to avoid impacts from erosion and sedimentation of surface waters; and
5. The preparation of a cultural resources assessment and the incorporation of specific measures to avoid impacts to cultural resources; and
6. A requirement that a qualified archaeologist examine any materials exposed during testing and make specific recommendations regarding appropriate mitigation that the director shall direct the applicant to perform.
(Ord. 25710.)
