Section 302. - Watershed development permits.
A. Watershed Development Permits. Unless specifically exempted, a Watershed Development Permit, as required by this chapter, shall be obtained prior to the commencement of any development, redevelopment, building, excavating, grading, regrading, paving, landfilling, berming or diking of any property within the City. B. Permit Classification and Requirements. Watershed Development Permit requirements shall be determined by the magnitude of the effects the proposed development could have on the stormwater drainage system in accordance with the following classifications. 1. Floodway Watershed Development Permit (FW). A Floodway Watershed Development Permit shall be obtained prior to any development or earth change where the same is located in the floodway. 2. Flood Plain Watershed Development Permit (FP). A Flood Plain Watershed Development Permit shall be obtained prior to any development or earth change where the same is located in the regulatory flood plain. 3. Stormwater Drainage Watershed Development Permit (SD). A Stormwater Drainage Watershed Development Permit shall be obtained prior to any development whose discharge at the point it leaves the site is greater than that which can be conveyed in a fifteen (15) inch diameter conduit. 4. Stormwater Connection Watershed Development Permit (SC). All other development being more than an earth change and not exempted herein shall be required to obtain a Stormwater Connection Watershed Development Permit. 5. Earth Change Watershed Development Permit (EC). An Earth Change Watershed Development Permit shall be obtained prior to any earth change. C. Exemptions. A Watershed Development Permit shall not be required for the following activities: 1. Bona fide agricultural and farming operations which constitute the principal use of any lot or tract of ground in the City and which meet the requirement of the Zoning Code of the City of Tulsa; 2. Customary and incidental routine grounds maintenance, landscaping, and home gardening which does not require a special exception or a variance under the Zoning Code, or a building permit, and which does not affect stormwater drainage entering or leaving any public right-of-way; 3. Emergency repairs of a temporary nature made on public or private property which are necessary for the preservation of life, health or property, and which are made under such circumstances where it would be impossible or impracticable to obtain a Watershed Development Permit; 4. Temporary excavation for the purpose of repairing or maintaining any public street, public utility facility or any service lines related thereto; and 5. Routine maintenance of the stormwater drainage system that does not alter the initial design capacity of an improved drainage system or does not alter the conveyance capacity of a natural channel that is in a well-maintained condition. D. Application for Watershed Development Permit. 1. General Requirements. Applications for a development permit required under this section shall be submitted to the Development Services Division of the Economic Development Department and shall be accompanied by a development site plan. The Director of Development Services shall review the information furnished by the applicant and determine whether a Floodway Watershed Development Permit (FW), Flood Plain Watershed Development Permit (FP), Stormwater Drainage Watershed Development Permit (SD), Stormwater Connection Watershed Development Permit (SC) or an Earth Change Watershed Development Permit (EC) is required or whether the activity is exempt. 2. Permit Application. The application and development site plan shall contain such information as required in City Drainage Standards. 3. Inactive Permit Application Denial. Failure of an applicant to provide all the information required by the Development Services Division of the Economic Development Department within sixty (60) days of receipt by the applicant of the request for the information shall result in the application's being denied unless an extension is granted in writing by the Development Services Division of the Economic Development Department.
(Ord. Nos. 16959, 17285; Ord. No. 22250, § 1, 6-10-2010)
Ask a question about Tulsa law
Corpus searches the Tulsa sections it holds and shows the ones that match, with their citations. Free, no sign-in.