§ 13.20.030 — Permit
The Code of the Metropolitan Government of Nashville and Davidson County (Supp. No. 53: codified through Ordinance No. BL2025-1141, approved December 17, 2025) · Metropolitan Code of Nashville and Davidson County § 13.20.030
Corpus is an independent public-information project, not the official City of Metropolitan Government of Nashville and Davidson County website. Stable reference: corpuslaw.us/code/5a683119-6075-4372-af2c-c611c26fce6a
13.20.030 - Permit.
A. No permits affecting multimodal pathway travel within the public way or public right-of-way shall be issued for any construction activities or special events for a period of seven days or more. Otherwise, permits shall be issued by the director to any person qualified under Section 13.20.050 of the metropolitan code, meeting all other requirements of this chapter, and upon receipt of the appropriate permit fee. B. In connection with the issuance of a permit under this chapter, the director shall have the authority to close temporarily or to authorize temporary closure of any street, road, alley, sidewalk, or any other public way or part thereof when, in the director's opinion, the closing is necessary. No public way shall be closed for any purpose without first obtaining a permit from the director. C. In connection with the issuance of a permit under this chapter, the director may install, or may require installation and maintenance of, traffic-control devices. Such devices and their placement shall meet the requirements of the latest edition of the Manual for Uniform Traffic Control Devices (MUTCD). The director shall adopt rules and standards with regard to this requirement, particularly as to safe accommodation for cyclists and pedestrians, including accessibility for disabled persons, and make compliance therewith a condition upon the issuance of a permit under this chapter. D. Excavation Permits. 1. Each separate excavation shall require a permit. Excavated areas of up to five square meters (six square yards) of surface area shall constitute an excavation. Trench excavations running parallel to traffic shall require a permit for each fifty linear feet. The fee for excavation permits shall be fifty-five dollars each, except within the right-of-way permit high impact area, where the fee shall be one hundred dollars for each permit (up to fifty linear feet). Any excavation permit requested and issued involving roadway pavement on any roadway that has been newly constructed or resurfaced within the past five years in addition to the other fees provided in this section shall require the payment of a pavement assessment fee. The pavement assessment fee shall be equal to five hundred dollars plus twenty percent of the cost to restore the excavation per existing pavement restoration specifications of the department of public works. The cost shall be based on the average cost of similar work performed by metro in the previous year and shall be updated annually by the director of public works. Each year on or about January 1st, the director of public works shall publish the pavement assessment fee. For the purposes of this section, the phrase "right-of-way permit high impact area" shall mean the area bounded as follows: Beginning at the intersection of I-65 North and Briley Parkway, thence; in an easterly and then in a southerly direction along Briley Parkway, to I-40 east of Nashville. Thence; continuing with Briley Parkway in a southerly then westerly direction, to I-24 south of Nashville. Thence; along Thompson Lane in a westerly direction, to I-65 south of Nashville. Thence; along Woodmont Boulevard in a westerly direction, to Harding Pike (HWY 70 S). Thence; along White Bridge Road in a northerly direction, to I-40 west of Nashville. Thence; along Briley Parkway in a northerly and then easterly direction to the point of beginning at I-65 north of Nashville. 2. All excavation restoration will be the responsibility of the permittee and shall conform to the specifications of the department of public works; and shall be subject to the approval of the director of public works. E. Obstruction Permits. 1. Permits shall be issued for temporary obstructions only. Permanent obstructions are prohibited. Except as hereinafter provided, the fee for an obstruction permit shall be fifty-five dollars per day per location. 2. The fee to place a trailer or dumpster in the public right-of-way shall be set by the department of public works, as derived from the actual internal operating costs of administering related services, as determined by the department. F. Permit Fees for Parking Meter Occupancy. When an excavation or obstruction prevents the use of parking spaces regulated by meter, a parking meter occupancy fee shall be paid by the permittee in accordance with rates established by the traffic and parking commission. G. Right-of-Way Temporary Closure Permits and Fees. In addition to any other fees required by this chapter, permits requiring the temporary closure of the metropolitan government's rights-of-way shall be subject to fees set by the department of public works, as derived from the actual internal operating costs of administering related services, as determined by the department based upon the scale and duration of the closure. H. Waiver. Fees may be waived by the director for the following: 1. Metro departments performing roadway or roadway feature related maintenance, repair or construction; 2. Activities of federal, state or local governments; 3. When the director finds that it is necessary to close the public way for the immediate protection of public safety.
(Amdt. 1 to Ord. BL2022-1530 §§ 3, 4, 2022; Ord. BL2022-1530 §§ 2—4, 2022; Res. RS2016-391 §§ 1, 2, 2016; Ord. BL2016-240 § 1, 2016; Ord. BL2016-235 §§ 1—3, 2016; Ord. BL2004-260 §§ 1—8, 2004; Ord. 97-785 § 1 (part), 1997)
Ask a question about Metropolitan Government of Nashville and Davidson County law
Corpus searches the Metropolitan Government of Nashville and Davidson County sections it holds and shows the ones that match, with their citations. Free, no sign-in.
